17 permits since 2000 (contractor on 17 permits, designer on 2 permits): 12 completed, 3 in progress, 2 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. Their ranked record as a contractor is on their contractor page. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 21, 2026 | Completed final sign-off Aug 2026 | 2332 Steiner St | Vhea General Contractor | to obtain final inspection for work approved under pa# 202406144518. all work is complete.Details
to obtain final inspection for work approved under pa# 202406144518. all work is complete. | |
| Aug 4, 2026 | Completed final sign-off Aug 2026 | 2332 Steiner St | Vhea General Contractor | to obtain final inspection for work approved under pa#202406063909. all work is complete.Details
to obtain final inspection for work approved under pa#202406063909. all work is complete. | |
| Dec 29, 2025 | In progress issued Dec 2025 | 1869 Turk St | Vhea General Contractor | bathroom remodel, bathtub and fixtures change. kitchen change cabinets and countertops and change only the switches and outlets.Details
bathroom remodel, bathtub and fixtures change. kitchen change cabinets and countertops and change only the switches and outlets. | $24,000 |
| Nov 12, 2025 | In progress issued Nov 2025 | 1914 Golden Gate Av | Vhea General Contractor | interior work: 2nd fl- construct two separate entries with a dividing wall. 3rd fl- convert (e) kitchen into new bathroom and nook. install new laundry in (e) closet. no work at 1st fl. no exterior changes.Details
interior work: 2nd fl- construct two separate entries with a dividing wall. 3rd fl- convert (e) kitchen into new bathroom and nook. install new laundry in (e) closet. no work at 1st fl. no exterior changes. | $30,000 |
| Sep 2, 2025 | Completed final sign-off Nov 2025 | 30 Madrone Av | Vhea General Contractor | stucco repairs and stucco repels and rebuild the same bricks, steps, and landing. street visible.Details
stucco repairs and stucco repels and rebuild the same bricks, steps, and landing. street visible. | $12,000 |
| Aug 20, 2025 | Completed final sign-off Apr 2026 | 652 Miramar Av | Vhea General Contractor | remodel 2 bathrooms and panel upgrade to 220 amps.Details
remodel 2 bathrooms and panel upgrade to 220 amps. | $58,000 |
| Aug 18, 2025 | Completed final sign-off Nov 2025 | 50 Yerba Buena Av | Vhea General Contractor | bathroom remodel in kind. no change to floor layout. no change to wall layout. no structural work.Details
bathroom remodel in kind. no change to floor layout. no change to wall layout. no structural work. | $18,000 |
| Jun 2, 2025 | Completed final sign-off Jul 2025 | 51 Yerba Buena Av | Vhea General Contractor | open wall for new window installation to match e) wood windowDetails
open wall for new window installation to match e) wood window | $7,000 |
| Apr 15, 2025 | Completed final sign-off Jul 2025 | 51 Yerba Buena Av | Vhea General Contractor | replace 3 windows 2nd fl, replace 1 window 1st fl, and 1 new window on 1/f.Details
replace 3 windows 2nd fl, replace 1 window 1st fl, and 1 new window on 1/f. | $18,000 |
| Apr 11, 2025 | Completed final sign-off Apr 2025 | 855 Lombard St | Vhea General Contractor | replace rotten on 24 steps landing nothing structural.Details
replace rotten on 24 steps landing nothing structural. | $4,000 |
| Oct 17, 2024 | Completed final sign-off Dec 2024 | 51 Yerba Buena Av | Vhea General Contractor | remodel 1 (e) bathroom.Details
remodel 1 (e) bathroom. | $9,000 |
| Sep 27, 2024 | Completed final sign-off Nov 2024 | 455 Vallejo St | Vhea General Contractor | unit #105: remove countertops and install new countertops. remove the tile flooring and install new flooring. bathroom remove the tile flooring and install new flooring. remove the wall tile and install new tile and new fixtures. replace kitchen sink and faucet.Details
unit #105: remove countertops and install new countertops. remove the tile flooring and install new flooring. bathroom remove the tile flooring and install new flooring. remove the wall tile and install new tile and new fixtures. replace kitchen sink and faucet. | $12,000 |
| Aug 7, 2024 | In progress issued Sep 2024 | 1431 Quesada Av | Vhea General Contractor | demo of (e) stairway and rebuild (n) in kind. no changes.Details
demo of (e) stairway and rebuild (n) in kind. no changes. | $18,000 |
| Jun 6, 2024 | Expired or cancelled expired Aug 2026 | 2332 Steiner St | Vhea General Contractor | comply w/ nov 202303226: lightwell in-fill for a new laundry room unconditioned space 56 sf. comply w/ 201633741: legalize shared laundry behind unit 2332Details
comply w/ nov 202303226: lightwell in-fill for a new laundry room unconditioned space 56 sf. comply w/ 201633741: legalize shared laundry behind unit 2332 | $5,000 |
| Nov 27, 2023 | Completed final sign-off Jan 2024 | 4921 California St | Vhea General Contractor | apt 1; replace kitchen cabinets and install new seramic tile on the floor onlyDetails
apt 1; replace kitchen cabinets and install new seramic tile on the floor only | $8,000 |
| Jul 11, 2023 | Expired or cancelled expired Jun 2026 | 346 Lexington St | Vhea General Contractor, Hand Hammer Dev Llc | to comply with physical inspection report cc# 8613.Details
to comply with physical inspection report cc# 8613. | $18,000 |
| Jan 24, 2022 | Completed final sign-off Apr 2022 | 938 Plymouth Av | Vhea General Contractor | remodel kitchen and bathroom in kind. new electrical service and update electrical.Details
remodel kitchen and bathroom in kind. new electrical service and update electrical. | $65,000 |