Vanessa Marie Liu
- Listed as
- architect, engineer
- Firm
- Enspace Co.
- Based in
- San Francisco
- On San Francisco permits
- Nov 2018 to Apr 2023
14 permits since 2000 (architect on 13 permits, engineer on 1 permit): 9 completed, 5 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 19, 2023 | Completed final sign-off Sep 2023 | 2108 Hayes St | unit 5: revision to bpa#202302282735, add another bathroom and vonert living room to bedroom.Details
unit 5: revision to bpa#202302282735, add another bathroom and vonert living room to bedroom. | $25,000 | |
| Feb 17, 2022 | Completed final sign-off Nov 2025 | 1751 Fulton St | Sft Construction Corp, Covenant Construction & Design Inc, Jtm Developments | convert an (e) vacant commercial bldg to a gymnasium. the scope of work includes facade renovation, new interior partitions, new flooring, new bathrooms, and new skylights. there is no expansion in bldg envelope.Details
convert an (e) vacant commercial bldg to a gymnasium. the scope of work includes facade renovation, new interior partitions, new flooring, new bathrooms, and new skylights. there is no expansion in bldg envelope. | $250,000 |
| Jan 10, 2022 | Never finaled issued Jan 2022, no final | 115 Prospect Av | Reiz Builder And Constuction Inc | interior renovations only. non-structural wall changes, kitchen renovation, and new paint.Details
interior renovations only. non-structural wall changes, kitchen renovation, and new paint. | $50,000 |
| Nov 5, 2021 | Never finaled issued Nov 2021, no final | 115 Prospect Av | Reiz Builder And Constuction Inc | interior renovations only, non-strutural wall changes, bathroom 1st fl. renovation,new flooring & new paint. 1st & 2nd fl.Details
interior renovations only, non-strutural wall changes, bathroom 1st fl. renovation,new flooring & new paint. 1st & 2nd fl. | $80,000 |
| May 10, 2021 | Never finaled filed May 2021, never issued | 1663 Mcallister St | the project proposes adding a new detached accessory dwelling unit to an existing two-story over basement multi-family building in an rm-1 residential mixed, low density zoning district.Details
the project proposes adding a new detached accessory dwelling unit to an existing two-story over basement multi-family building in an rm-1 residential mixed, low density zoning district. | $125,000 | |
| Mar 17, 2021 | Completed final sign-off Feb 2024 | 1375 24th Av | Sturdy Home Builders | revision to pa#201811307126. alter site. the new includes interior renovations and horizontal expansion into the rear yard in the existing ground floor.Details
revision to pa#201811307126. alter site. the new includes interior renovations and horizontal expansion into the rear yard in the existing ground floor. | $350,000 |
| Mar 16, 2021 | Never finaled issued Oct 2021, no final | 846 Capp St | Matthew P Leffers | convert basement for (2) (n) residential units. interior non-structural wall demolition & re-layout. (n) partitions, add bathrooms, paint, lower (e) floor & (n) floor finish. nfpa 13 sprinkler system in basement level.Details
convert basement for (2) (n) residential units. interior non-structural wall demolition & re-layout. (n) partitions, add bathrooms, paint, lower (e) floor & (n) floor finish. nfpa 13 sprinkler system in basement level. | $80,000 |
| Oct 29, 2020 | Completed final sign-off Jun 2021 | 12 Tillman Pl | t.i.: non-structural wall demo, new interior wals, new ada bathroom. no exterior work.Details
t.i.: non-structural wall demo, new interior wals, new ada bathroom. no exterior work. | $75,000 | |
| Sep 23, 2020 | Never finaled issued Mar 2022, no final | 565 Natoma St | Matthew P Leffers | scope of work includes basement renovation, one new unit (565b natoma: with 2 bedrooms and 2 bathrooms), utility relocation, laundry relocation, and water heater replacement (to be design-build by contractor).Details
scope of work includes basement renovation, one new unit (565b natoma: with 2 bedrooms and 2 bathrooms), utility relocation, laundry relocation, and water heater replacement (to be design-build by contractor). | $120,000 |
| Dec 27, 2019 | Completed final sign-off Mar 2023 | 355 Oak Park Dr | Bailey General Contracting Co Inc | residential alterations including bathroom renovation, kitchen renovation, removal of flat ceilings, adding skylights, and roof structural upgrades. legalize gr fl family room and bathroomDetails
residential alterations including bathroom renovation, kitchen renovation, removal of flat ceilings, adding skylights, and roof structural upgrades. legalize gr fl family room and bathroom | $100,000 |
| Nov 18, 2019 | Completed final sign-off Feb 2023 | 524 34th Av | Gary Liu | legalization of unpermitted unit per ordiance 43-14 on first floor.Details
legalization of unpermitted unit per ordiance 43-14 on first floor. | $3,000 |
| Oct 11, 2019 | Completed final sign-off Dec 2019 | 4801 Geary Bl | rev to pa201902253739 on post caps. (post anchors). structural calcs for punching bag supports.Details
rev to pa201902253739 on post caps. (post anchors). structural calcs for punching bag supports. | ||
| Feb 25, 2019 | Completed final sign-off Dec 2019 | 4801 Geary Bl | to comply with nov #201921306. the projet proposes conversion of a mattress firm retail to a fitness gym on the ground floor retail spaces of an extg 4 story mixed use bldg in an nc-3 district. the work includes installation of fitness equipment and construction of a post to beam structure toDetails
to comply with nov #201921306. the projet proposes conversion of a mattress firm retail to a fitness gym on the ground floor retail spaces of an extg 4 story mixed use bldg in an nc-3 district. the work includes installation of fitness equipment and construction of a post to beam structure to | $5,000 | |
| Nov 30, 2018 | Completed final sign-off Feb 2024 | 1375 24th Av | vertical additions & alterations to (e) 2-story residential bldg in rh-2 zone. work includes interior renovations, a 3rd flr addition, renovation of facade & full seismic retrofit. there is no horizontal expansion in (e) ground flr & 2nd flr.Details
vertical additions & alterations to (e) 2-story residential bldg in rh-2 zone. work includes interior renovations, a 3rd flr addition, renovation of facade & full seismic retrofit. there is no horizontal expansion in (e) ground flr & 2nd flr. | $650,000 |