Tom Podesta
- Listed as
- architect, authorized agent-others, engineer
- Firm
- Tom Podesta Engineer
- On San Francisco permits
- Sep 2003 to May 2025
16 permits since 2000 (engineer on 13 permits, architect on 2 permits, authorized agent-others on 1 permit): 9 completed, 4 never finaled, 3 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 19, 2025 | Completed final sign-off Aug 2025 | 5320 Geary Bl | Brighter Bay Builders Inc | install ada bath @ 1/f. this permit application does not establish a change of use or occupancy. no final inspection until completion of pa#: 2024-1015-3009.Details
install ada bath @ 1/f. this permit application does not establish a change of use or occupancy. no final inspection until completion of pa#: 2024-1015-3009. | $30,000 |
| May 8, 2024 | Completed final sign-off Aug 2025 | 1401 Silver Av | to convert a retail space & non-confirming office to a new 623 sqft state adu.Details
to convert a retail space & non-confirming office to a new 623 sqft state adu. | $80,000 | |
| Feb 22, 2024 | Completed final sign-off Apr 2024 | 101 Henry Adams St | C C I Commercial Construction & Improv | revision to approved pa# 202308305582 sheet id6.0, refine/revise the occupant load analysis to reflect the use of the tenant space more accurately. instead of a mercantile use, revise to showroom use.Details
revision to approved pa# 202308305582 sheet id6.0, refine/revise the occupant load analysis to reflect the use of the tenant space more accurately. instead of a mercantile use, revise to showroom use. | |
| Aug 30, 2023 | Completed final sign-off Apr 2024 | 101 Henry Adams St | C C I Commercial Construction & Improv | ste 270, 272, 273 & 256, interior ti @ 2nd flr. (n) non load bearing partitions & finishes. install showroom appliances w/millwork.Details
ste 270, 272, 273 & 256, interior ti @ 2nd flr. (n) non load bearing partitions & finishes. install showroom appliances w/millwork. | $350,000 |
| Dec 11, 2019 | Never finaled filed Dec 2019, never issued | 3121 Santiago St | A & A General Building Construction Inc | legalize unit, kitchen, add bedroom, half bath and deck on second floor per ordinance 43-14.**not qualified for fee waiver per ord# 146-15**Details
legalize unit, kitchen, add bedroom, half bath and deck on second floor per ordinance 43-14.**not qualified for fee waiver per ord# 146-15** | $60,000 |
| Sep 19, 2018 | Never finaled issued Jan 2019, no final | 151 Downey St | Mcdp Dba Geothersun Construction | interior remodel to include: remodel kitchen, add half bathroom, remove chimney, add bedroom and bathroom at attic. add window on rear elev into match exist trim and sidingDetails
interior remodel to include: remodel kitchen, add half bathroom, remove chimney, add bedroom and bathroom at attic. add window on rear elev into match exist trim and siding | $50,000 |
| Jul 25, 2018 | Never finaled issued Jul 2018, no final | 1365 06th Av | All Weather Construction | voluntary seismic upgrade with steel moment frame in garage.Details
voluntary seismic upgrade with steel moment frame in garage. | $30,000 |
| May 22, 2014 | Completed final sign-off Jun 2015 | 722 Larkin St | A A Builders & Company | convert (e) storage room to r-2 studio unit. entails removal of an exterior load bearing wall in lightwell, & addtnl interior walls for bathroom enclosure,upgrade (e) electrical layout, new plumbing lines, replace doors & windows, install new hvac,finishes,new fence&landscape,new stairs& entry doorDetails
convert (e) storage room to r-2 studio unit. entails removal of an exterior load bearing wall in lightwell, & addtnl interior walls for bathroom enclosure,upgrade (e) electrical layout, new plumbing lines, replace doors & windows, install new hvac,finishes,new fence&landscape,new stairs& entry door | $14,000 |
| Jul 1, 2011 | Expired or cancelled withdrawn Apr 2012 | 95 Sanchez St | soft story upgrade ab-094.Details
soft story upgrade ab-094. | $10,000 | |
| Jul 11, 2008 | Completed final sign-off Oct 2008 | 1930 California St | Gray Industries Inc | install landscape retaining wall & concrete patioDetails
install landscape retaining wall & concrete patio | $6,000 |
| Mar 13, 2008 | Completed final sign-off Mar 2008 | 21 Wright St | Gray Industries Inc | remove ex. front stair case and replace in kindDetails
remove ex. front stair case and replace in kind | $10,000 |
| Feb 10, 2006 | Expired or cancelled expired May 2010 | 509 Webster St | partial brick foundation replacement. toward left side from front & rear. no exterior work.Details
partial brick foundation replacement. toward left side from front & rear. no exterior work. | $35,000 | |
| Jul 18, 2005 | Expired or cancelled expired Jun 2010 | 1445 Florida St | interior remodel to (e)detached rear yard cottage unit & remodel front elevation between 2 bldg.Details
interior remodel to (e)detached rear yard cottage unit & remodel front elevation between 2 bldg. | $60,000 | |
| Mar 29, 2005 | Never finaled issued Mar 2005, no final | 2325 15th Av | new bearing wall to be added to garage space. permit does not constitute legally of of social room,Details
new bearing wall to be added to garage space. permit does not constitute legally of of social room, | $15,000 | |
| Feb 24, 2005 | Completed final sign-off Aug 2005 | 5345 Anza St | On-Site Maintenance | new room and bath on gb/f replace (e) beam and posts with (n) power beamDetails
new room and bath on gb/f replace (e) beam and posts with (n) power beam | $40,000 |
| Sep 24, 2003 | Completed final sign-off Dec 2003 | 239 Vernon St | demolish existing deck & replace with new deck to rear-horizontal additionDetails
demolish existing deck & replace with new deck to rear-horizontal addition | $6,954 |