Tom Ehline
- Listed as
- authorized agent-others, contractor
- Firm
- Ehline Construction Inc.
- Based in
- San Francisco
- On San Francisco permits
- Sep 2013 to Mar 2026
25 permits since 2000 (contractor on 25 permits, authorized agent-others on 1 permit): 19 completed, 2 in progress, 4 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. Their ranked record as a contractor is on their contractor page. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 11, 2026 | In progress issued Jul 2026 | 87 Elsie St | Ehline Construction Inc. | remodel of (e) bathrooms on 1st and 2nd floors.Details
remodel of (e) bathrooms on 1st and 2nd floors. | $60,000 |
| Jul 1, 2025 | Completed final sign-off Dec 2025 | 29 Douglass St | Ehline Construction Inc. | renovate existing bathroom on 2nd floor (29) douglas. remove and replace existing window at the rear with a french door on 29 douglasDetails
renovate existing bathroom on 2nd floor (29) douglas. remove and replace existing window at the rear with a french door on 29 douglas | $80,000 |
| May 20, 2025 | In progress issued Jul 2025 | 1854 Great Hy | Ehline Construction Inc. | replace front windows and front door. one window has a change in width.Details
replace front windows and front door. one window has a change in width. | $35,000 |
| Sep 9, 2024 | Completed final sign-off May 2025 | 979 Rhode Island St | Ehline Construction Inc. | 2/f: modification to interior space through selective demolition to extend a dining room to the perimeter of the building envelope.Details
2/f: modification to interior space through selective demolition to extend a dining room to the perimeter of the building envelope. | $30,000 |
| Dec 4, 2023 | Completed final sign-off Oct 2024 | 1238 44th Av | Ehline Construction Inc. | selective demolition and modifications to interior space, adding new partions to convert an (e) storage area into a new family room and bathroom.Details
selective demolition and modifications to interior space, adding new partions to convert an (e) storage area into a new family room and bathroom. | $125,000 |
| May 16, 2022 | Completed final sign-off Mar 2023 | 1946 42nd Av | Ehline Construction Inc. | remodel one bathroom: remove existing tub and connect to shower. add new tile and fixtures, update electrical to code. no structural work - no framing modifications.Details
remodel one bathroom: remove existing tub and connect to shower. add new tile and fixtures, update electrical to code. no structural work - no framing modifications. | $25,000 |
| Jun 11, 2021 | Completed final sign-off Mar 2023 | 1946 42nd Av | Ehline Construction Inc. | converting (e) storage space on the g/f into a home office. (e) non-conforming fixures are being updated to allow a separate bathroom in the downstairs area. no structural mods proposed.Details
converting (e) storage space on the g/f into a home office. (e) non-conforming fixures are being updated to allow a separate bathroom in the downstairs area. no structural mods proposed. | $50,000 |
| Apr 16, 2021 | Completed final sign-off Oct 2022 | 1955 42nd Av | Ehline Construction Inc. | ground floor interior improvements: modification to (e) interior space through selective demolition and addition of new partitions to convert (e) storage into a new bedroom and bathroom.Details
ground floor interior improvements: modification to (e) interior space through selective demolition and addition of new partitions to convert (e) storage into a new bedroom and bathroom. | $75,000 |
| Jan 21, 2021 | Completed final sign-off Jun 2021 | 1687 Market St | Ehline Construction Inc. | demo 14 linear feet non-structural wall, construct 45 linear feet of new wall creating new display area adjascent to existingDetails
demo 14 linear feet non-structural wall, construct 45 linear feet of new wall creating new display area adjascent to existing | $50,000 |
| Nov 12, 2020 | Completed final sign-off Mar 2022 | 1455 Alabama St | Ehline Construction Inc. | remodeling of (e) space to install bathroom: one toilet, one sink, one shower stall and washer/dryer hookup. installation of plubing and electrical. space is located in the ne corner of lower level.Details
remodeling of (e) space to install bathroom: one toilet, one sink, one shower stall and washer/dryer hookup. installation of plubing and electrical. space is located in the ne corner of lower level. | $55,000 |
| Sep 4, 2020 | Completed final sign-off Mar 2022 | 1455 Alabama St | Ehline Construction Inc. | relace/repair comprosised exterior siding on rear (east facing), side of building.Details
relace/repair comprosised exterior siding on rear (east facing), side of building. | $5,000 |
| Dec 2, 2019 | Never finaled issued Dec 2019, no final | 1760 Alabama St | Ehline Construction Inc. | remodel existing bathroom in kind.Details
remodel existing bathroom in kind. | $25,000 |
| Nov 28, 2018 | Completed final sign-off Nov 2019 | 2905 23rd St | Ehline Construction Inc. | unit 2905 - relocate kitchen & bath add 1 new exterior door at rear install new furnance & w/h. unit 2907 - remodel (e) kitchen & bath, add new windows and doors at rear add skylight at officeDetails
unit 2905 - relocate kitchen & bath add 1 new exterior door at rear install new furnance & w/h. unit 2907 - remodel (e) kitchen & bath, add new windows and doors at rear add skylight at office | $135,000 |
| May 4, 2018 | Completed final sign-off Feb 2019 | 110 Liberty St | Ehline Construction Inc. | remodel 2 existing bathrooms to include new tile, new lights, new fixtures. no change to walls, doors or openings. maher naDetails
remodel 2 existing bathrooms to include new tile, new lights, new fixtures. no change to walls, doors or openings. maher na | $20,000 |
| Oct 16, 2017 | Never finaled issued Oct 2017, no final | 244 Missouri St | Ehline Construction Inc. | bathroom and kitchen remodel. replace in kind existing kitchen and bathroomDetails
bathroom and kitchen remodel. replace in kind existing kitchen and bathroom | $15,000 |
| Jul 20, 2017 | Completed final sign-off Aug 2017 | 2174 Union St | Ehline Construction Inc. | interior t.i. to include new finishes and fixtures for 90-day period. no structural or mep changes to space.Details
interior t.i. to include new finishes and fixtures for 90-day period. no structural or mep changes to space. | $146,374 |
| Mar 31, 2016 | Completed final sign-off Oct 2016 | 2130 36th Av | Ehline Construction Inc. | replace stucco, add two sconces and 4 outlets. replace one window. in-kind only.Details
replace stucco, add two sconces and 4 outlets. replace one window. in-kind only. | $50,000 |
| Jan 30, 2015 | Completed final sign-off Jul 2016 | 726 Madrid St | Ehline Construction Inc. | lower existing slab (partial) in basement. replace stem walls, and water proof, add steel beam to replace wood beam. move existing door to allow stair landing. add new fau move water heater.Details
lower existing slab (partial) in basement. replace stem walls, and water proof, add steel beam to replace wood beam. move existing door to allow stair landing. add new fau move water heater. | $35,000 |
| Jan 12, 2015 | Never finaled issued Jan 2015, no final | 3873 17th St | Ehline Construction Inc. | revised drawings to show as builts requested by field inspector. reivisions to permit app # 2014-0328-1984 - relocated laundry area.Details
revised drawings to show as builts requested by field inspector. reivisions to permit app # 2014-0328-1984 - relocated laundry area. | |
| Sep 26, 2014 | Completed final sign-off Nov 2014 | 556 Hayes St | Ehline Construction Inc. | revision to pa#2014 0418 3602. (e) toilet room to remain non-ada compliant. revised form c: 20% rule.Details
revision to pa#2014 0418 3602. (e) toilet room to remain non-ada compliant. revised form c: 20% rule. | |
| Jul 29, 2014 | Completed final sign-off Sep 2014 | 219 Cotter St | Ehline Construction Inc. | replace in-kind basement 1/2 bath.Details
replace in-kind basement 1/2 bath. | $6,000 |
| May 21, 2014 | Completed final sign-off May 2015 | 219 Bocana St | Ehline Construction Inc. | replace (e) car portion of garage slab on grade, replace (e) center wood posts footings, add anchor bolts to the (e) perimiter foundation, all work @ first /garage levelDetails
replace (e) car portion of garage slab on grade, replace (e) center wood posts footings, add anchor bolts to the (e) perimiter foundation, all work @ first /garage level | $15,000 |
| Apr 18, 2014 | Completed final sign-off Nov 2014 | 556 Hayes St | Ehline Construction Inc. | ground floor new retail space. create & replace ada compliance including entry at store front, powder room, sink. remove (e) dropped ceiling, & add new lighting. new ada dressing room, replace (e) fixed glass window w/(n) ada compliant door in show room.refinish uneven concreteDetails
ground floor new retail space. create & replace ada compliance including entry at store front, powder room, sink. remove (e) dropped ceiling, & add new lighting. new ada dressing room, replace (e) fixed glass window w/(n) ada compliant door in show room.refinish uneven concrete | $46,395 |
| Mar 28, 2014 | Never finaled issued Aug 2014, no final | 3873 17th St | Ehline Construction Inc. | interior remodel to (e) lower unit in 2 unit residence. remodel (e) kitchen & master bath, add (n) bathroom,. demolished (e) closet & build (n) bathroom.Details
interior remodel to (e) lower unit in 2 unit residence. remodel (e) kitchen & master bath, add (n) bathroom,. demolished (e) closet & build (n) bathroom. | $69,464 |
| Sep 19, 2013 | Completed final sign-off Feb 2014 | 126 Dolores St | Ehline Construction Inc. | convert a portion of the first floor to be a bedroom and a party room. add a bathroom at first floor. add exterior sink and counter at rear of building.Details
convert a portion of the first floor to be a bedroom and a party room. add a bathroom at first floor. add exterior sink and counter at rear of building. | $40,000 |