Thomas Billeter
- Listed as
- engineer
- On San Francisco permits
- Aug 2020 to Aug 2020
1 permit since 2000 (engineer on 1 permit): 1 completed.
CompletedIn progressNever finaledExpired or cancelled
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 25, 2020 | Completed final sign-off Aug 2021 | 550 07th St | Phoenix Electric Co. | underground installation of 6" diameter fire water ("fn") piping to meet sffd administrative bulletins 2.09 and 4.08.Details
underground installation of 6" diameter fire water ("fn") piping to meet sffd administrative bulletins 2.09 and 4.08. | $25,000 |