Steven Huegli
- Listed as
- architect
- Firm
- Jensen Architects
- Based in
- San Francisco
- On San Francisco permits
- Feb 2025 to Jan 2026
4 permits since 2000 (architect on 4 permits): 3 completed, 1 in progress.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jan 6, 2026 | In progress issued Sep 2026 | 800 Chestnut St | Plant Construction Co, Lp | change use from art college-artist studios. ext facade restoration @ (clay/brown bldg & residential bldg) and accessibility improvements, interior nonstructural improvements and limited new ext openings. repurposing of studio & admin space. add 2 residential dwelling units. seismic under sep permit.Details
change use from art college-artist studios. ext facade restoration @ (clay/brown bldg & residential bldg) and accessibility improvements, interior nonstructural improvements and limited new ext openings. repurposing of studio & admin space. add 2 residential dwelling units. seismic under sep permit. | $15,000,000 |
| Sep 9, 2025 | Completed final sign-off Jan 2026 | 221 Main St | Gci, Inc | priority processing per ab-004.t.i of suites 104 & 250 on 1st fl & 2nd fl to create space for non-profit,private school for for grade 6-12, deferred submittal for pa202504043725 to construct an indoor climbing wall.Details
priority processing per ab-004.t.i of suites 104 & 250 on 1st fl & 2nd fl to create space for non-profit,private school for for grade 6-12, deferred submittal for pa202504043725 to construct an indoor climbing wall. | |
| Apr 15, 2025 | Completed final sign-off Jan 2026 | 221 Main St | Gci, Inc | priority processing per ab-004.t.i of suites 104 & 250 on 1st fl & 2nd fl to create space for non-profit,private school for for grade 6-12,interior demolition of interior,including portion of 2nd fl structural slab for(n) stair opening,construction of(n)paritions doors,ceilings,finishes,fixtures.Details
priority processing per ab-004.t.i of suites 104 & 250 on 1st fl & 2nd fl to create space for non-profit,private school for for grade 6-12,interior demolition of interior,including portion of 2nd fl structural slab for(n) stair opening,construction of(n)paritions doors,ceilings,finishes,fixtures. | $10,000,000 |
| Feb 4, 2025 | Completed final sign-off Jan 2026 | 221 Main St | Gci, Inc | 1st & 2nd/f: interior demo per sfdbi ab-107. interior demolition of non-structural elements including but not limited to: interior partitions, doors, finishes, ceilings, lighting, mechanical ducts and equipment, outlets and switches.Details
1st & 2nd/f: interior demo per sfdbi ab-107. interior demolition of non-structural elements including but not limited to: interior partitions, doors, finishes, ceilings, lighting, mechanical ducts and equipment, outlets and switches. | $427,000 |