Stephen Willrich
- Listed as
- architect, authorized agent-others
- Firm
- Willrich Architects
- Based in
- San Anselmo
- On San Francisco permits
- Aug 2012 to Aug 2023
10 permits since 2000 (architect on 10 permits, authorized agent-others on 1 permit): 7 completed, 2 never finaled, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 15, 2023 | Completed final sign-off May 2025 | 2266 Vallejo St | Upscale Construction Inc. | horizontal addition(50 square ft)@ rear of level 5,northeast corner.addition is set back 3ft from east property line.raise rear roof of bldg 6"@ back of residence over office.replace (e)stone tile paving @(e)level 5 rear balcony.replace(e)sliding door @ level 5 rear balcony with (n)unit.Details
horizontal addition(50 square ft)@ rear of level 5,northeast corner.addition is set back 3ft from east property line.raise rear roof of bldg 6"@ back of residence over office.replace (e)stone tile paving @(e)level 5 rear balcony.replace(e)sliding door @ level 5 rear balcony with (n)unit. | $95,000 |
| Dec 11, 2018 | Completed final sign-off Jan 2022 | 34 Maple St | Upscale Construction Inc. | alterations to (e) windows & doors. (n) roof terrance on north & east. modification to (e) dormers & roof on north & east. (n) lattice privacy fence at east.Details
alterations to (e) windows & doors. (n) roof terrance on north & east. modification to (e) dormers & roof on north & east. (n) lattice privacy fence at east. | $150,000 |
| Mar 29, 2017 | Expired or cancelled cancelled Jan 2026 | 761 Marina Bl | Young & Burton Inc | revision to pa 2016-0809-4612, remove 4th floor iron guardrail & replace with new glass guardrail @ marina sideDetails
revision to pa 2016-0809-4612, remove 4th floor iron guardrail & replace with new glass guardrail @ marina side | $5,000 |
| Aug 9, 2016 | Completed final sign-off Jun 2017 | 761 Marina Bl | Young & Burton Inc | 2nd floor - remodel kitchen; 3rd floor- remodel master bathroom with new cabinets, plumbing, electrical and appliances. maher naDetails
2nd floor - remodel kitchen; 3rd floor- remodel master bathroom with new cabinets, plumbing, electrical and appliances. maher na | $175,000 |
| Apr 14, 2016 | Never finaled issued Apr 2016, no final | 28 25th Av | Kelly Pacific Constr.,Co. | revision to ref pa 2015 0413 3457: addition of full bathroom 2nd flr. convert closet into full bath, second floor, sheet a2.2.Details
revision to ref pa 2015 0413 3457: addition of full bathroom 2nd flr. convert closet into full bath, second floor, sheet a2.2. | $10,000 |
| Aug 1, 2014 | Completed final sign-off Oct 2015 | 3712 Jackson St | Upscale Construction Inc. | top floor only. work to include 4 new shed dormers @ rear of building (with (e) skylights to be removed) & 2 new dormers @ street elevation. all new exterior materials are to match (e) / siding stucco, roof, paint color & windows. * maher: compliance with ordinance no# 155-13 not req *Details
top floor only. work to include 4 new shed dormers @ rear of building (with (e) skylights to be removed) & 2 new dormers @ street elevation. all new exterior materials are to match (e) / siding stucco, roof, paint color & windows. * maher: compliance with ordinance no# 155-13 not req * | $95,000 |
| Jul 15, 2014 | Completed final sign-off Dec 2015 | 3712 Jackson St | Upscale Construction Inc. | interior remodel of existing bathrooms, closets, & new stair. add new bathroom on 2nd floor, miscellaneous replacement of existing windows & door. n/a maher ordinance. no expansion of building envelope. no work at front facade. exterior work at rear. provide automatic sprinkler systems at 2nd floor.Details
interior remodel of existing bathrooms, closets, & new stair. add new bathroom on 2nd floor, miscellaneous replacement of existing windows & door. n/a maher ordinance. no expansion of building envelope. no work at front facade. exterior work at rear. provide automatic sprinkler systems at 2nd floor. | $120,000 |
| Aug 19, 2013 | Completed final sign-off Aug 2014 | 3881 Clay St | Marin Custom Builders | replace windows, remodel 3 bathrooms, 2 on gr fl, new lighting, shingle front of buildingDetails
replace windows, remodel 3 bathrooms, 2 on gr fl, new lighting, shingle front of building | $350,000 |
| May 9, 2013 | Completed final sign-off Aug 2014 | 3881 Clay St | Kelly Pacific Constr.,Co. | replace kitchen cabinetry and master bath cabinetry plumbing fixtures and lighting in these areas. lighting must comply with 150(k).Details
replace kitchen cabinetry and master bath cabinetry plumbing fixtures and lighting in these areas. lighting must comply with 150(k). | $75,000 |
| Aug 10, 2012 | Never finaled issued Sep 2012, no final | 2348 09th Av | revision to approved pa#2009-1106-0761-r1. new scope of work is to extend (e) deck nearest the rear prop line from 6'-8" to 8'-0 long. also, construct (n) 10'-0" tall wood fence near east prop line. also, (n) wood beam to support swing set.Details
revision to approved pa#2009-1106-0761-r1. new scope of work is to extend (e) deck nearest the rear prop line from 6'-8" to 8'-0 long. also, construct (n) 10'-0" tall wood fence near east prop line. also, (n) wood beam to support swing set. | $8,700 |