Stephen Marusigh
- Listed as
- architect, engineer
- On San Francisco permits
- Mar 2021 to May 2024
3 permits since 2000 (engineer on 2 permits, architect on 1 permit): 3 completed.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 1, 2024 | Completed final sign-off Nov 2024 | 450 Mission St | Gci, Inc | reference pa 202312182688. for field coordination no sidewalk surface work. no work on topping slab under this permit. comply w/ nov 202310119 for sub-sidewalk repair under (2) elevator openings.Details
reference pa 202312182688. for field coordination no sidewalk surface work. no work on topping slab under this permit. comply w/ nov 202310119 for sub-sidewalk repair under (2) elevator openings. | $5,000 |
| Dec 18, 2023 | Completed final sign-off Nov 2024 | 450 Mission St | Gci, Inc | repair to (e) concrete slabs & beams below sidewalka along mission & 1st st in accomondate w/ ch 4 od sfbc, new metal decking, steele legger angles, steel beams, metal & wood shoring posts & concrete. comply w/ nov 202310119Details
repair to (e) concrete slabs & beams below sidewalka along mission & 1st st in accomondate w/ ch 4 od sfbc, new metal decking, steele legger angles, steel beams, metal & wood shoring posts & concrete. comply w/ nov 202310119 | $300,000 |
| Mar 25, 2021 | Completed final sign-off Jun 2022 | 1 Post St | Bcci Construction Company | 23rd fl: tenant improvement of an (e) office space including (n) interior non-structural partitions and finishes, lighting & millwork. fire sprinkler under separate permit.Details
23rd fl: tenant improvement of an (e) office space including (n) interior non-structural partitions and finishes, lighting & millwork. fire sprinkler under separate permit. | $1,304,479 |