Sohail Shah
- Listed as
- architect, engineer
- Firm
- Pdc Corporation
- Based in
- Livermore
- On San Francisco permits
- Jun 2010 to Jul 2017
8 permits since 2000 (engineer on 6 permits, architect on 2 permits): 4 completed, 2 never finaled, 2 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 19, 2017 | Never finaled issued Jan 2018, no final | 150 Mendosa Av | Metropolitan Electrical Construction | add 2 antenna's to (e) monopole radio tower. replcate radio equipment from temp cellon wheels to (e) shelter.Details
add 2 antenna's to (e) monopole radio tower. replcate radio equipment from temp cellon wheels to (e) shelter. | $10,000 |
| Aug 24, 2016 | Completed final sign-off Nov 2016 | 1250 Jones St | install new radios & antenna system to be powered from existing (e) panel, & associated cableing for antennas.Details
install new radios & antenna system to be powered from existing (e) panel, & associated cableing for antennas. | $85,000 | |
| Jun 20, 2016 | Completed final sign-off Nov 2016 | 1 Bayview Park Rd | Walker Cellular Inc | install emergency stand by diesel generator outside of bldg. its replacing decommed generator. this is the generator install for 201511051807Details
install emergency stand by diesel generator outside of bldg. its replacing decommed generator. this is the generator install for 201511051807 | $35,000 |
| Aug 21, 2015 | Expired or cancelled cancelled Nov 2024 | 278 Post St | installation of a verizon wireless telecommunications facility, consisting of (2) new panel antenna, mounted to billboard frame, (10) new rrhs, (3) cabinets on a new steel platform mounted to (e) concrete wall and (1) microwave dishDetails
installation of a verizon wireless telecommunications facility, consisting of (2) new panel antenna, mounted to billboard frame, (10) new rrhs, (3) cabinets on a new steel platform mounted to (e) concrete wall and (1) microwave dish | $100,000 | |
| Aug 20, 2015 | Expired or cancelled cancelled Nov 2024 | 212 Stockton St | install wireless telecommuications facility(wts) consist 9 new panel antennas & 12 rrhs concealed behind a new frp screen wall, 2 charles cube cabinets & one 1 new dc generator mounted on (e) steel platform & 1 gps antenna on cable tray.Details
install wireless telecommuications facility(wts) consist 9 new panel antennas & 12 rrhs concealed behind a new frp screen wall, 2 charles cube cabinets & one 1 new dc generator mounted on (e) steel platform & 1 gps antenna on cable tray. | $300,000 | |
| Jun 24, 2015 | Completed final sign-off Apr 2016 | 1575 Bay Shore Bl | Electric Tech Construction Inc | verizon remove (6)existing panel antennas on e toner & replace (6) new panel antennas. relocted & reuse (3) lte antennas for 850.install (6)rrhs w/a2 modules inside tower wall, relocate 3(e) aws rrhs inside tower wall, install 3 (n)a2 unitsbehind aws rrhs in tower, install ray cap dc 3315 supressorsDetails
verizon remove (6)existing panel antennas on e toner & replace (6) new panel antennas. relocted & reuse (3) lte antennas for 850.install (6)rrhs w/a2 modules inside tower wall, relocate 3(e) aws rrhs inside tower wall, install 3 (n)a2 unitsbehind aws rrhs in tower, install ray cap dc 3315 supressors | $35,000 |
| Jan 2, 2014 | Never finaled issued Jan 2014, no final | 825 Clayton St | Walker Telecomm Inc. | installation of coaxial cable (low voltage) and fiber starting from 825 clayton street (carl sub station) along to the sunset tunnel (muni). equipment unit on electrical correct to be installed on the carl muni substation. underground work only.Details
installation of coaxial cable (low voltage) and fiber starting from 825 clayton street (carl sub station) along to the sunset tunnel (muni). equipment unit on electrical correct to be installed on the carl muni substation. underground work only. | $50,000 |
| Jun 28, 2010 | Completed final sign-off Oct 2012 | 220 Golden Gate Av | Metropolitan Electrical Construction | sprint. relocation of existing cellular equipment on roof top due to building expansionDetails
sprint. relocation of existing cellular equipment on roof top due to building expansion | $42,000 |