Simin Naaseh
- Listed as
- engineer
- Firm
- Forell/Elesser Engineering
- Based in
- Sf
- On San Francisco permits
- Nov 2016 to Jul 2026
5 permits since 2000 (engineer on 5 permits): 3 completed, 1 in progress, 1 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 28, 2026 | In progress issued Aug 2026 | 201 Post St | Northern Sun Associates | floors 5-7: install (2) new stairwells for floor to floor circulation.Details
floors 5-7: install (2) new stairwells for floor to floor circulation. | $190,000 |
| Dec 15, 2025 | Completed final sign-off Aug 2026 | 655 Beach St | W.E. O'neil Construction Co. Of Norcal | 2/f suite 210: interior tenant improvement to (e) office space including non-structural partitions, doors, structural operable partition, suspended ceilings, casework, finishes and furniture. no change in occupancy or tenant.Details
2/f suite 210: interior tenant improvement to (e) office space including non-structural partitions, doors, structural operable partition, suspended ceilings, casework, finishes and furniture. no change in occupancy or tenant. | $962,880 |
| Aug 25, 2025 | Completed final sign-off Mar 2026 | 160 Spear St | Sc Builders, Inc | 10th, 11th, 12th, 13th, 15th, and 19th floors. addition of phone booths and structural anchorage.Details
10th, 11th, 12th, 13th, 15th, and 19th floors. addition of phone booths and structural anchorage. | $80,000 |
| Jun 23, 2022 | Never finaled issued Jun 2022, no final | 1155 Battery St | Dpr Construction A | work consist of removing test sample from steel column space weld metal for testing by others. sample areas required reinforcing prior to removing samples as indicated on plan. remove & replace (e) finishes & spray applied fire proofing as required. fls: 2, 4, 6.Details
work consist of removing test sample from steel column space weld metal for testing by others. sample areas required reinforcing prior to removing samples as indicated on plan. remove & replace (e) finishes & spray applied fire proofing as required. fls: 2, 4, 6. | $5,000 |
| Nov 15, 2016 | Completed final sign-off Feb 2018 | 201 Post St | Alain Hirsch Construction Corp | interior ti of (e) basement & ground floor retail store, scope to include (n) stair, elevator, restrooms, partitions, millwork, mep, no exterior work under this permit. fire protection under separate permitDetails
interior ti of (e) basement & ground floor retail store, scope to include (n) stair, elevator, restrooms, partitions, millwork, mep, no exterior work under this permit. fire protection under separate permit | $1,700,000 |