Shelly Levvy
- Listed as
- authorized agent-others, contractor
- Firm
- Ly Green Construction Inc
- Based in
- South San Francisco
- On San Francisco permits
- Dec 2019 to Sep 2026
54 permits since 2000 (contractor on 54 permits, authorized agent-others on 2 permits): 44 completed, 9 in progress, 1 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. Their ranked record as a contractor is on their contractor page. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 29, 2026 | In progress filed Sep 2026, not yet issued | 1889 Church St | Ly Green Construction Inc | revision to 202512051150. new dormer at 3rd fl containing new full bath.Details
revision to 202512051150. new dormer at 3rd fl containing new full bath. | |
| Aug 27, 2026 | In progress issued Oct 2026 | 3065 Clay St | Ly Green Construction Inc | interior remodel of unit #203 existing bath and add new bath. remodel foyer and entry. non-structurl work only. no exterior workDetails
interior remodel of unit #203 existing bath and add new bath. remodel foyer and entry. non-structurl work only. no exterior work | $50,000 |
| Aug 27, 2026 | In progress issued Aug 2026 | 102 Santa Marina St | Ly Green Construction Inc | revision to pa#202606102898: remove select indoor mini-split units from scope, keeping (e) baseboard heaters.Details
revision to pa#202606102898: remove select indoor mini-split units from scope, keeping (e) baseboard heaters. | |
| Jun 10, 2026 | In progress issued Aug 2026 | 102 Santa Marina St | Ly Green Construction Inc | replace (2) sliding doors at rear facade, not visible from street. remodel primary bath and walk-in closet. remove fireplace inserts, and replace cabinets in living room.Details
replace (2) sliding doors at rear facade, not visible from street. remodel primary bath and walk-in closet. remove fireplace inserts, and replace cabinets in living room. | $50,000 |
| Mar 16, 2026 | In progress issued Mar 2026 | 1889 Church St | Ly Green Construction Inc | revision 202512051150- interior stairs replacement from 1st to 2nd floorDetails
revision 202512051150- interior stairs replacement from 1st to 2nd floor | |
| Jan 13, 2026 | In progress issued Jan 2026 | 1889 Church St | Ly Green Construction Inc | 1. first floor: replace sheet rock in living room and bedroom in kind with 5/8" type x and insluation in walls. (approx. 720 sq ft) 2. second floor: replace sheet rock in kind wityh 5/8" type x in both bedrooms and insulation in walls. (approx. 550 sq ft.)Details
1. first floor: replace sheet rock in living room and bedroom in kind with 5/8" type x and insluation in walls. (approx. 720 sq ft) 2. second floor: replace sheet rock in kind wityh 5/8" type x in both bedrooms and insulation in walls. (approx. 550 sq ft.) | $5,500 |
| Dec 9, 2025 | Completed final sign-off Feb 2026 | 701 Minna St | Ly Green Construction Inc | lower pony wall (breakfast bar) to counter level. replace granite countertop with natural stone. replace sink and faucet in the same location. move (2) electrical outlets.Details
lower pony wall (breakfast bar) to counter level. replace granite countertop with natural stone. replace sink and faucet in the same location. move (2) electrical outlets. | $20,000 |
| Dec 5, 2025 | In progress issued Dec 2025 | 1889 Church St | Ly Green Construction Inc | interior only kitchen and bathroom remodel. demolition of one wall, finishes, and fixtures/lightings. minor mep upgrades. structural upgrades. replacing windows at upper floor.Details
interior only kitchen and bathroom remodel. demolition of one wall, finishes, and fixtures/lightings. minor mep upgrades. structural upgrades. replacing windows at upper floor. | $250,000 |
| Sep 4, 2025 | In progress issued Dec 2025 | 1 Country Club Dr | Ly Green Construction Inc, Harmony Design & Development Inc | revision 202504083895- reconfigure bathroom remodel layouts (2 total) add side (north) door at 1st floor garage to access side breezeway with landing and stairs to grade. add platform & steps to access rear yard on one side & public row on the otherDetails
revision 202504083895- reconfigure bathroom remodel layouts (2 total) add side (north) door at 1st floor garage to access side breezeway with landing and stairs to grade. add platform & steps to access rear yard on one side & public row on the other | |
| Jun 24, 2025 | Completed final sign-off Aug 2025 | 851 Indiana St | Ly Green Construction Inc | apt#508: kitchen remodel in kind. no wall demolition or construction, no change in plumbing fixture counts. upgrade all emp per city code.Details
apt#508: kitchen remodel in kind. no wall demolition or construction, no change in plumbing fixture counts. upgrade all emp per city code. | $50,660 |
| Jun 24, 2025 | Completed final sign-off Jan 2026 | 643 Carolina St | Ly Green Construction Inc | work on 3rd floor. hallway bathroom remodel in kind upgrade water, electrical up to city code. kitchen remodel in kind. upgrade all emp per city code. no wall demolition or construction, no change in plumbing fixture count.Details
work on 3rd floor. hallway bathroom remodel in kind upgrade water, electrical up to city code. kitchen remodel in kind. upgrade all emp per city code. no wall demolition or construction, no change in plumbing fixture count. | $109,700 |
| Jun 6, 2025 | Completed final sign-off May 2026 | 421 Oak Park Dr | Ly Green Construction Inc | revision 202501148315 and ref 202505237204 to inlcude remove of half of wooden gable roof at front of the building and replace in kind.Details
revision 202501148315 and ref 202505237204 to inlcude remove of half of wooden gable roof at front of the building and replace in kind. | |
| May 23, 2025 | Completed final sign-off May 2026 | 421 Oak Park Dr | Ly Green Construction Inc | revision 202505227103- electrical repair due to knob and tube is required for (e) 3 bedroom no new location for switches/outlets. install (n) roof sheeting due to water damage on (e). windows repair due to water damage in kind within the same opening like for like facing the front of building.Details
revision 202505227103- electrical repair due to knob and tube is required for (e) 3 bedroom no new location for switches/outlets. install (n) roof sheeting due to water damage on (e). windows repair due to water damage in kind within the same opening like for like facing the front of building. | $27,000 |
| May 22, 2025 | Completed final sign-off May 2026 | 421 Oak Park Dr | Ly Green Construction Inc | revision 202501148315- to include (n) rear sliders from 72 inch width to 96 inch width, add strong walls, 2x (n) skylights to match skylights on original permit, (n) detail for (e) as built condition at upper double top plates.Details
revision 202501148315- to include (n) rear sliders from 72 inch width to 96 inch width, add strong walls, 2x (n) skylights to match skylights on original permit, (n) detail for (e) as built condition at upper double top plates. | |
| Apr 8, 2025 | In progress issued Apr 2025 | 1 Country Club Dr | Ly Green Construction Inc, Harmony Design & Development Inc | renovation of single family dwelling at upper fl. kitchen remodel. remove interior bearing wall between kitchen and living rm. 2 bath remodel. add powder. add plywood shearwalls, structural posts and footings.Details
renovation of single family dwelling at upper fl. kitchen remodel. remove interior bearing wall between kitchen and living rm. 2 bath remodel. add powder. add plywood shearwalls, structural posts and footings. | $123,000 |
| Jan 14, 2025 | Completed final sign-off May 2026 | 421 Oak Park Dr | Ly Green Construction Inc | remodel (e) kitchen with vaulted ceiling, new layout, appliances. remodel (e) 1st fl beyond garage w family room, new bedroom, new bath, remodel (e) laundry. remodel in keeping w precedent set by neighboring residences. replace (e) first floor window and door w/ (n) sliding doors.Details
remodel (e) kitchen with vaulted ceiling, new layout, appliances. remodel (e) 1st fl beyond garage w family room, new bedroom, new bath, remodel (e) laundry. remodel in keeping w precedent set by neighboring residences. replace (e) first floor window and door w/ (n) sliding doors. | $250,000 |
| Jul 9, 2024 | Completed final sign-off Jul 2024 | 54 Cook St | Ly Green Construction Inc | (2) windows replacement, same material, same opening, and color. like for like replacement due to defective windows leaking. not visible from street.Details
(2) windows replacement, same material, same opening, and color. like for like replacement due to defective windows leaking. not visible from street. | $6,500 |
| Jun 5, 2024 | Completed final sign-off Aug 2024 | 1130 Treat Av | Ly Green Construction Inc | bathroom remodel like for like: no changes to wall layout.Details
bathroom remodel like for like: no changes to wall layout. | $35,000 |
| Mar 7, 2024 | Completed final sign-off Jun 2024 | 688 Powhattan Av | Ly Green Construction Inc | two bahroom remodel like for like, no wall layut changes full upgradeDetails
two bahroom remodel like for like, no wall layut changes full upgrade | $75,000 |
| Mar 5, 2024 | Completed final sign-off Mar 2024 | 639 29th Av | Ly Green Construction Inc | to comply with the physical inspection report cc-8646.Details
to comply with the physical inspection report cc-8646. | $1,500 |
| Oct 25, 2023 | Completed final sign-off Feb 2024 | 643 Carolina St | Ly Green Construction Inc | bathroom remodel like for like, upgrade sub-panel to 200amp.Details
bathroom remodel like for like, upgrade sub-panel to 200amp. | $18,000 |
| Mar 8, 2023 | Completed final sign-off Jul 2023 | 1410 Dolores St | Ly Green Construction Inc | bathroom remodel. all work like for like. tub and shower system. no removal of wallsDetails
bathroom remodel. all work like for like. tub and shower system. no removal of walls | $30,000 |
| Mar 8, 2023 | Completed final sign-off Jul 2023 | 801 Indiana St | Ly Green Construction Inc | unit 560: remodel 1 kitchen, 2 bathrooms and 1 powder room (shower/tub). all work like for like. no changes to layout. no removal of wallsDetails
unit 560: remodel 1 kitchen, 2 bathrooms and 1 powder room (shower/tub). all work like for like. no changes to layout. no removal of walls | $150,000 |
| Jan 31, 2023 | Completed final sign-off May 2023 | 55 Alvarado St | Ly Green Construction Inc | kitchen remodel, like for like, electrical subpanel upgrade. transition from gas stove to electrical stove.Details
kitchen remodel, like for like, electrical subpanel upgrade. transition from gas stove to electrical stove. | $54,000 |
| Sep 28, 2022 | Completed final sign-off Dec 2022 | 1117 Alabama St | Ly Green Construction Inc | exterior rear wall work- new siding, shear wall, insulation r-13 and dry rot repair. new window due to dry rot issues in framing.Details
exterior rear wall work- new siding, shear wall, insulation r-13 and dry rot repair. new window due to dry rot issues in framing. | $60,000 |
| Aug 11, 2022 | Completed final sign-off Dec 2022 | 1117 Alabama St | Ly Green Construction Inc | unit b: kitchen remodel like for like: bathroom remodel like for like: no change in layout.Details
unit b: kitchen remodel like for like: bathroom remodel like for like: no change in layout. | $80,000 |
| Feb 18, 2022 | Completed final sign-off Sep 2022 | 12 Littlefield Tr | Ly Green Construction Inc | kitchen remodel, kitchen wall removal.Details
kitchen remodel, kitchen wall removal. | $100,000 |
| Dec 3, 2021 | Completed final sign-off Apr 2022 | 801 Indiana St | Ly Green Construction Inc | kitchen remodel, like for like. bath remodel, like for like. no structural work. no layout change, no wall removal.Details
kitchen remodel, like for like. bath remodel, like for like. no structural work. no layout change, no wall removal. | $45,000 |
| Nov 8, 2021 | Completed final sign-off Nov 2021 | 868 Minnesota St | Ly Green Construction Inc | unit #411: bathroom remodel like for like, no changes in layout. no structural work. no framing modification.Details
unit #411: bathroom remodel like for like, no changes in layout. no structural work. no framing modification. | $20,000 |
| Nov 2, 2021 | Completed final sign-off Jun 2022 | 867 Indiana St | Ly Green Construction Inc | one bathroom remodel like for like: no changes in layout.Details
one bathroom remodel like for like: no changes in layout. | $25,000 |
| Oct 27, 2021 | Completed final sign-off Jun 2022 | 38 Southwood Dr | Ly Green Construction Inc | rev to pa202009174392: changes in kitchen layout.Details
rev to pa202009174392: changes in kitchen layout. | $3,000 |
| Sep 30, 2021 | Completed final sign-off Mar 2022 | 3622 24th St | Ly Green Construction Inc | 4/f: revision in master bath layout change. remove 4 non loading bearing walls, non structural. ref. no-plan permit 202102124620. no new plumbing fixtures.Details
4/f: revision in master bath layout change. remove 4 non loading bearing walls, non structural. ref. no-plan permit 202102124620. no new plumbing fixtures. | $3,000 |
| Aug 26, 2021 | Completed final sign-off Feb 2022 | 989 20th St | Ly Green Construction Inc | in kind one kitchen remodel- in kind one bathroom remodel no changes in (e) layout.Details
in kind one kitchen remodel- in kind one bathroom remodel no changes in (e) layout. | $80,000 |
| Jul 30, 2021 | Completed final sign-off Jan 2022 | 88 King St | Ly Green Construction Inc | apt 420: remodel 2 bathrooms in-kiknd. no changes in (e) layout. lighting to comply with cec 150(k).Details
apt 420: remodel 2 bathrooms in-kiknd. no changes in (e) layout. lighting to comply with cec 150(k). | $40,000 |
| Jul 9, 2021 | Completed final sign-off Jun 2022 | 38 Southwood Dr | Ly Green Construction Inc | revision to pa 2020-0622-8968 replace any (e) wood rot with new material on all walls & ceilings. concrete for foundation to be of min 2500 psiDetails
revision to pa 2020-0622-8968 replace any (e) wood rot with new material on all walls & ceilings. concrete for foundation to be of min 2500 psi | $5,000 |
| Jun 17, 2021 | Completed final sign-off Jun 2022 | 38 Southwood Dr | Ly Green Construction Inc | revision to pa 2019-1218-9873 to replace damaged concrete slab @ ground floorDetails
revision to pa 2019-1218-9873 to replace damaged concrete slab @ ground floor | $15,000 |
| Jun 2, 2021 | Completed final sign-off Jul 2021 | 25 Camp St | Ly Green Construction Inc | unit 4: add a washer & dryer - laundry closet. modify non-load bearing walls between bedroom/bathroom.Details
unit 4: add a washer & dryer - laundry closet. modify non-load bearing walls between bedroom/bathroom. | $5,000 |
| May 13, 2021 | Completed final sign-off Sep 2021 | 2040 Franklin St | Ly Green Construction Inc | remodel one bathroom and kitchen in-kind. non-structural workDetails
remodel one bathroom and kitchen in-kind. non-structural work | $35,000 |
| Mar 31, 2021 | Completed final sign-off Feb 2023 | 1567 Beach St | Ly Green Construction Inc | remodel the entire house. upgrade main panel from 100 to 200a. relocate kitchen to dinning room area. add master bathroom in (e) kitchen location. convert 523sf part of (e) non habitable area on ground flr to office and laundry room.Details
remodel the entire house. upgrade main panel from 100 to 200a. relocate kitchen to dinning room area. add master bathroom in (e) kitchen location. convert 523sf part of (e) non habitable area on ground flr to office and laundry room. | $250,000 |
| Mar 1, 2021 | Completed final sign-off Apr 2021 | 25 Camp St | Ly Green Construction Inc | bathroom remodel. like for like. no structural work. no framing work.Details
bathroom remodel. like for like. no structural work. no framing work. | $20,000 |
| Feb 19, 2021 | Completed final sign-off Apr 2021 | 850 Minnesota St | Ly Green Construction Inc | bathroom remodeling tub to shower. adding 2 recessed lights. like for like no changes to layout. no walls moving.Details
bathroom remodeling tub to shower. adding 2 recessed lights. like for like no changes to layout. no walls moving. | $24,650 |
| Feb 12, 2021 | Completed final sign-off Mar 2022 | 3622 24th St | Ly Green Construction Inc | kitchen remodel like for like; (2) bathroom remodel like for like; powder room remodel like for like; new flooring, cabinets, countertops, backsplash, sinks and facuets.Details
kitchen remodel like for like; (2) bathroom remodel like for like; powder room remodel like for like; new flooring, cabinets, countertops, backsplash, sinks and facuets. | $140,000 |
| Feb 12, 2021 | Completed final sign-off Mar 2022 | 3622 24th St | Ly Green Construction Inc | in kind window replacements-same openings and operations; all windows front and back; replace exterior siding with cement prepaint, reuse existing trimDetails
in kind window replacements-same openings and operations; all windows front and back; replace exterior siding with cement prepaint, reuse existing trim | $75,000 |
| Feb 1, 2021 | Completed final sign-off Oct 2021 | 1567 Beach St | Ly Green Construction Inc | drywall removal & replacement only. no changes in the layout no stud replacement. valuation includes sheetrock cost. add all new sheetrock at 60" to 12". 800k sqft of sheetrock. no framing work.Details
drywall removal & replacement only. no changes in the layout no stud replacement. valuation includes sheetrock cost. add all new sheetrock at 60" to 12". 800k sqft of sheetrock. no framing work. | $31,600 |
| Nov 13, 2020 | Completed final sign-off May 2021 | 356 Roosevelt Wy | Ly Green Construction Inc | kitchen and bathroom remodeling like for like. no change to layout of walls and openingsDetails
kitchen and bathroom remodeling like for like. no change to layout of walls and openings | $25,000 |
| Oct 30, 2020 | Completed final sign-off Dec 2020 | 360 Fillmore St | Ly Green Construction Inc | emergencey repair of small section of front wall broken by car. some wall framing to be replaced to comply with nov # 202048431Details
emergencey repair of small section of front wall broken by car. some wall framing to be replaced to comply with nov # 202048431 | $27,000 |
| Sep 17, 2020 | Completed final sign-off Jun 2022 | 38 Southwood Dr | Ly Green Construction Inc | legalized existing adu on ground floor, 885 sq ft, including reconfiguring stairs from upstairs to have direct acess to rear yard. new separate furnace & gas tankless water heater.Details
legalized existing adu on ground floor, 885 sq ft, including reconfiguring stairs from upstairs to have direct acess to rear yard. new separate furnace & gas tankless water heater. | $80,000 |
| Sep 16, 2020 | Completed final sign-off Dec 2020 | 381 Elizabeth St | Ly Green Construction Inc | lower unit - remodel 1 kitchen and 1 bathroom in-kind. upper unit - remodel 1 kitchen and 2 bathrooms in-kind. replace 7 windows in back of house. non street visible. all work in-kind, no structural workDetails
lower unit - remodel 1 kitchen and 1 bathroom in-kind. upper unit - remodel 1 kitchen and 2 bathrooms in-kind. replace 7 windows in back of house. non street visible. all work in-kind, no structural work | $150,000 |
| Sep 9, 2020 | Completed final sign-off Aug 2021 | 91 Seward St | Ly Green Construction Inc, Bartley Construction | one kitchen and one bathroom remodeling: kitchen remodeling on 2nd fl like for like. bathroom remodeling on 1st fl like for like. nw lighting shall comply with cec 150.0 (k) 3 & k(5). no walls alterations. no nw wall & no extg wall relocations. all new plumbing fixtures retain in same location.Details
one kitchen and one bathroom remodeling: kitchen remodeling on 2nd fl like for like. bathroom remodeling on 1st fl like for like. nw lighting shall comply with cec 150.0 (k) 3 & k(5). no walls alterations. no nw wall & no extg wall relocations. all new plumbing fixtures retain in same location. | $80,000 |
| Jul 2, 2020 | Completed final sign-off Oct 2020 | 65 Cleary Ct | Ly Green Construction Inc | kitchen remodeling like for like, no changes new flooring cabinets, counter top, backsplash, sink & faucetDetails
kitchen remodeling like for like, no changes new flooring cabinets, counter top, backsplash, sink & faucet | $48,000 |
| Jun 22, 2020 | Completed final sign-off Jun 2022 | 38 Southwood Dr | Ly Green Construction Inc | revision to pa 2019-1218-9873, revised upstairs ktichen layout and new roof framing; infill window openings and door on lower level; addition of landing and steps on north side of property; partial foundation replacement per structural drawingsDetails
revision to pa 2019-1218-9873, revised upstairs ktichen layout and new roof framing; infill window openings and door on lower level; addition of landing and steps on north side of property; partial foundation replacement per structural drawings | $30,000 |
| Dec 26, 2019 | Never finaled issued Jan 2020, no final | 400 Spear St | Ly Green Construction Inc | street spaceDetails
street space | |
| Dec 18, 2019 | Completed final sign-off Jun 2022 | 38 Southwood Dr | Ly Green Construction Inc | complete kitchen remodel on upper floor and rewire. upgrade main panel to 200 a.Details
complete kitchen remodel on upper floor and rewire. upgrade main panel to 200 a. | $50,000 |
| Dec 4, 2019 | Completed final sign-off Jun 2020 | 701 Minnesota St | Ly Green Construction Inc | 1 bathroom remodel like for like.Details
1 bathroom remodel like for like. | $12,000 |