Scott Sullivan
- Listed as
- architect
- Firm
- Relativity Architects
- Based in
- Los Angeles
- On San Francisco permits
- Apr 2021 to Jun 2023
3 permits since 2000 (architect on 3 permits): 2 completed, 1 in progress.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 5, 2023 | In progress issued Apr 2026 | 501 Post St | Landmark Restorations Ltd | provide 2 accessible vehicle pull-up space with passenger drop-off & loading zone. upgrade and provide accessible path of travel from the public site walk and vehicle drop-off & loading zones to the building lobby. new concrete paving. new accessible ramp. new accessible curb cut ramp. new stripingDetails
provide 2 accessible vehicle pull-up space with passenger drop-off & loading zone. upgrade and provide accessible path of travel from the public site walk and vehicle drop-off & loading zones to the building lobby. new concrete paving. new accessible ramp. new accessible curb cut ramp. new striping | $8,000 |
| Jan 13, 2023 | Completed final sign-off Jan 2024 | 750 Sutter St | Landmark Restorations Ltd | 7 units to be upgraded for accessbility standard. 12 units to be upgraded for person w/hearing & visual impairmants. (e) common areas on 1st fl to be updated. no catering/ no shared kitchen.Details
7 units to be upgraded for accessbility standard. 12 units to be upgraded for person w/hearing & visual impairmants. (e) common areas on 1st fl to be updated. no catering/ no shared kitchen. | $185,000 |
| Apr 21, 2021 | Completed final sign-off Sep 2021 | 333 Fulton St | Landmark Restorations Ltd | barrier removal: 3 units to be upgraded to have mobility features per accessibility standards. upgrade to include new kitchen and bathroom layouts, replace/relocate kitchen appliances, replace/relocate plumbing fixtures, new low voc paint, new bathroom/kitchen finishes and new flooring.Details
barrier removal: 3 units to be upgraded to have mobility features per accessibility standards. upgrade to include new kitchen and bathroom layouts, replace/relocate kitchen appliances, replace/relocate plumbing fixtures, new low voc paint, new bathroom/kitchen finishes and new flooring. | $118,082 |