Scott Arnold
- Listed as
- engineer
- Firm
- Fyfe Engineering
- On San Francisco permits
- Dec 2022 to Mar 2026
4 permits since 2000 (engineer on 4 permits): 1 completed, 2 in progress, 1 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 11, 2026 | In progress issued Jun 2026 | 185 Berry St | Hathaway Dinwiddie Co. | ti for sierra located on levels 1, 5 & 6. selective demo of portion of (e) floor slabs at levels 5 & 6 to create 3 story, interconnected volume intended for "all-hands" assembly gatherings, work also includes construction of stadium-styled seating & associated stairs between level 4, 5 & communicatiDetails
ti for sierra located on levels 1, 5 & 6. selective demo of portion of (e) floor slabs at levels 5 & 6 to create 3 story, interconnected volume intended for "all-hands" assembly gatherings, work also includes construction of stadium-styled seating & associated stairs between level 4, 5 & communicati | $2,350,400 |
| Oct 11, 2024 | Completed final sign-off Apr 2026 | 340 Fell St | Gci, Inc | install frp at concrete columns for reinforcement of (e) conditions and as part of seismic upgrade. frp and associated engineered drawings are being submitted as part of a deferred permit called out in architectural drawings. ref 202212289303.Details
install frp at concrete columns for reinforcement of (e) conditions and as part of seismic upgrade. frp and associated engineered drawings are being submitted as part of a deferred permit called out in architectural drawings. ref 202212289303. | $35,000 |
| Jun 23, 2023 | In progress issued Mar 2024 | 414 Brannan St | Principal Builders Inc. | seismic retrofit of 3-story + basement, commercial building. interior remodel including restroom, elevator & path of travel upgrades. no exterior workDetails
seismic retrofit of 3-story + basement, commercial building. interior remodel including restroom, elevator & path of travel upgrades. no exterior work | $1,125,000 |
| Dec 5, 2022 | Never finaled issued Aug 2023, no final | 192 Utah St | Rod Heisler Construction | deferred submittal for fiber reinforced polymer (frp) as shown on the approved seismic strengthening drawings (bpa# 202209092150)Details
deferred submittal for fiber reinforced polymer (frp) as shown on the approved seismic strengthening drawings (bpa# 202209092150) | $500,000 |