Saul Cristobal Velasquez Varga Vargas
- Listed as
- authorized agent-others, contractor
- Firm
- Venova Construction Inc
- Based in
- Rodeo
- On San Francisco permits
- Jul 2021 to Jan 2022
3 permits since 2000 (contractor on 3 permits, authorized agent-others on 1 permit): 2 completed, 1 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. Their ranked record as a contractor is on their contractor page. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jan 10, 2022 | Completed final sign-off Jan 2023 | 2655 Bush St | Venova Construction Inc | unit 306. kitchen remodel like for like. interior paint all house. finish carpentry interior throughout house. bathroom vanity removal and install new. reinstall ceiling lights, switch, and outlets/cover plates.Details
unit 306. kitchen remodel like for like. interior paint all house. finish carpentry interior throughout house. bathroom vanity removal and install new. reinstall ceiling lights, switch, and outlets/cover plates. | $15,000 |
| Jan 10, 2022 | Completed final sign-off Apr 2023 | 2655 Bush St | Venova Construction Inc | unit 408. kitchen: install pantry cabinet, second bathroom remodel like for like. finish carpentry throughout interior house. interior paint throughout house. reinstall ceiling lights, switches, outlets, cover plates. reinstall missing floor tile at laundry and second bath.Details
unit 408. kitchen: install pantry cabinet, second bathroom remodel like for like. finish carpentry throughout interior house. interior paint throughout house. reinstall ceiling lights, switches, outlets, cover plates. reinstall missing floor tile at laundry and second bath. | $15,000 |
| Jul 8, 2021 | Never finaled issued Jul 2021, no final | 2655 Bush St | Venova Construction Inc | unit 308: install new circuit 12 gauge wire with 15 amp breaker for (4) ceiling lights @ living room & (4) ceiling lights @ guest bedroom #1. remove shower tub & replace w/tile @ 1/fDetails
unit 308: install new circuit 12 gauge wire with 15 amp breaker for (4) ceiling lights @ living room & (4) ceiling lights @ guest bedroom #1. remove shower tub & replace w/tile @ 1/f | $1,100 |