Roberto Cortez
- Listed as
- architect, engineer
- Firm
- Monarch Engineers
- On San Francisco permits
- Dec 2015 to Oct 2025
8 permits since 2000 (engineer on 6 permits, architect on 2 permits): 4 completed, 2 in progress, 1 never finaled, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 6, 2025 | In progress issued Oct 2025 | 1332 10th Av | retrofit wall to support the fire escape structure on the 2/f & 3/f. add an extra bolt to comply with current load requirements.Details
retrofit wall to support the fire escape structure on the 2/f & 3/f. add an extra bolt to comply with current load requirements. | $10,000 | |
| Dec 30, 2022 | In progress issued Jan 2024 | 3253 Mission St | Ocho 5 Custom Home Builders & Asphalt Pa | prop h.new commercial kitchen,install(n)exhaust hood & fan,install(n)makeup air unit,(n)lighting in the kitchen & back room,(n)exit signs,install to surface mounted grease traps,install 2 fls sinks & additional sewer lines connected to(e)lateral,(n)wall finish @ the kitchen & back room.Details
prop h.new commercial kitchen,install(n)exhaust hood & fan,install(n)makeup air unit,(n)lighting in the kitchen & back room,(n)exit signs,install to surface mounted grease traps,install 2 fls sinks & additional sewer lines connected to(e)lateral,(n)wall finish @ the kitchen & back room. | $187,988 |
| Nov 6, 2020 | Completed final sign-off Apr 2024 | 3151 24th St | comply w/ accessible business entrance ordinance program 51-16. install power door opener and grid entrance walk way to eliminate excesive changes in grade at transition point to sidewalk. abe# 201911158253Details
comply w/ accessible business entrance ordinance program 51-16. install power door opener and grid entrance walk way to eliminate excesive changes in grade at transition point to sidewalk. abe# 201911158253 | $3,000 | |
| Oct 14, 2020 | Completed final sign-off May 2022 | 655 10th Av | Terence Mcmahon Construction | basement: remodel (e) basement, demo & (n) construction. (n) millworks. 1/f kitchen: demo & (n) construction. (n) plumbing, cabinetry, lighting, & finishes. 1/f powder rm: demo & (n) construction. (n) plumbing, lighting, & finishes. 1/f sun rm: (n) cabinetry. 1/f living rm: refinish (e) fireplace.Details
basement: remodel (e) basement, demo & (n) construction. (n) millworks. 1/f kitchen: demo & (n) construction. (n) plumbing, cabinetry, lighting, & finishes. 1/f powder rm: demo & (n) construction. (n) plumbing, lighting, & finishes. 1/f sun rm: (n) cabinetry. 1/f living rm: refinish (e) fireplace. | $100,000 |
| Dec 22, 2017 | Expired or cancelled expired Sep 2023 | 623 Clement St | Mark Scott Construction Inc | repair (e) restaurant due to fire damage. the resubmittal will address t-bar finishes, mep changes per inspector notes & current code. scope of work: replace all damage floor/ceiling/rafters & studs, match (e). replace all damaged equipments & ductwork. replace electrical wirings, fixtures panelsDetails
repair (e) restaurant due to fire damage. the resubmittal will address t-bar finishes, mep changes per inspector notes & current code. scope of work: replace all damage floor/ceiling/rafters & studs, match (e). replace all damaged equipments & ductwork. replace electrical wirings, fixtures panels | $140,000 |
| Nov 2, 2017 | Completed final sign-off Feb 2018 | 820 Laguna St | Mark Scott Construction Inc | revision to pa#201708255933, replace studs, sheathing and stucco at 2/f & 3/f. n/a ordinance #155-13Details
revision to pa#201708255933, replace studs, sheathing and stucco at 2/f & 3/f. n/a ordinance #155-13 | $5,000 |
| Aug 25, 2017 | Completed final sign-off Feb 2018 | 820 Laguna St | Mark Scott Construction Inc | comply with nov 201795291 - vehicle impact like in kind - vehicle impact into building, damage to framing, stucco, utility closet. interior finishes, replace like in kind of approx.170 sq.ft.of walls & utility closet cover.Details
comply with nov 201795291 - vehicle impact like in kind - vehicle impact into building, damage to framing, stucco, utility closet. interior finishes, replace like in kind of approx.170 sq.ft.of walls & utility closet cover. | $25,700 |
| Dec 18, 2015 | Never finaled filed Dec 2015, never issued | 8 Steuart St | Hood Exhibits | kitchen bars - food trucks. for super bowl event.Details
kitchen bars - food trucks. for super bowl event. |