Robert Williamson
- Listed as
- authorized agent-others, contractor
- Firm
- Novo Construction Inc
- Based in
- Menlo Park
- On San Francisco permits
- Aug 2003 to Oct 2026
2,666 permits since 2000 (contractor on 2,665 permits, authorized agent-others on 12 permits): 2,017 completed, 119 in progress, 388 never finaled, 142 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. Their ranked record as a contractor is on their contractor page. How to read these records
Most recent permits
Showing the 100 most recent of 2,666.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 5, 2026 | In progress filed Oct 2026, not yet issued | 667 Mission St | Novo Construction Inc | 1/f: mechanical work at 1st floor for tenant improvement. ref arch # 202606253939Details
1/f: mechanical work at 1st floor for tenant improvement. ref arch # 202606253939 | $95,000 |
| Oct 5, 2026 | In progress filed Oct 2026, not yet issued | 667 Mission St | Novo Construction Inc | mechanical, electrical and structural work for tenant improvement on 4/f. ref arch 202606233694Details
mechanical, electrical and structural work for tenant improvement on 4/f. ref arch 202606233694 | $175,000 |
| Oct 5, 2026 | In progress filed Oct 2026, not yet issued | 667 Mission St | Novo Construction Inc | basement - mech work at basement for ti ref pa 202606253939Details
basement - mech work at basement for ti ref pa 202606253939 | $25,000 |
| Oct 5, 2026 | In progress filed Oct 2026, not yet issued | 657 Mission St | Novo Construction Inc | mechanical, electrical and structural work for tenant improvement on 4/f and roof. ref arch 202606233692Details
mechanical, electrical and structural work for tenant improvement on 4/f and roof. ref arch 202606233692 | $175,000 |
| Sep 28, 2026 | In progress issued Sep 2026 | 400 Howard St | Novo Construction Inc | revision to pa#: 202606183492 to modify mechanical work on the 5th flr and add exterior louver.Details
revision to pa#: 202606183492 to modify mechanical work on the 5th flr and add exterior louver. | |
| Sep 25, 2026 | In progress issued Sep 2026 | 425 Market St | Novo Construction Inc | 3/f: interior non-structural demolition per ab-017.Details
3/f: interior non-structural demolition per ab-017. | $45,000 |
| Sep 25, 2026 | In progress issued Oct 2026 | 400 Howard St | Novo Construction Inc | revision to pa 202605121069 scope includes adding a fire rated corridor wall detail at the existing raised access floor. see ab-05 local equivalency request formDetails
revision to pa 202605121069 scope includes adding a fire rated corridor wall detail at the existing raised access floor. see ab-05 local equivalency request form | $6,000 |
| Sep 24, 2026 | In progress filed Sep 2026, not yet issued | 345 Spear St | Novo Construction Inc | mechanical work for 3rd & 6th floorsDetails
mechanical work for 3rd & 6th floors | $45,000 |
| Sep 16, 2026 | In progress issued Sep 2026 | 240 Stockton St | Novo Construction Inc | 3/f: demolition of (e) non-load bearing interior partitions. ab-017.Details
3/f: demolition of (e) non-load bearing interior partitions. ab-017. | $22,000 |
| Sep 16, 2026 | In progress issued Sep 2026 | 255 California St | Novo Construction Inc | floor reinforcement and anchorage details for atm safe and cash recycler.Details
floor reinforcement and anchorage details for atm safe and cash recycler. | $10,000 |
| Sep 16, 2026 | In progress issued Sep 2026 | 400 Howard St | Novo Construction Inc | 6th fl - mechanical work for tenant improvement ref pa 202605121069Details
6th fl - mechanical work for tenant improvement ref pa 202605121069 | $28,000 |
| Sep 16, 2026 | In progress issued Sep 2026 | 222 Stockton St | Novo Construction Inc | cellar and level 1. demolition of existing non-load bearing partitions, doors and interior equipment ab-017Details
cellar and level 1. demolition of existing non-load bearing partitions, doors and interior equipment ab-017 | $25,000 |
| Sep 15, 2026 | In progress filed Sep 2026, not yet issued | 300 Howard St | Novo Construction Inc | 2/f: tenant improvements: in existing office building. improvements to include, architectural, mechanical, electrical and plumbing to accommodate new tenant build out. mep scope to support kitchen build-out and updated restrooms.Details
2/f: tenant improvements: in existing office building. improvements to include, architectural, mechanical, electrical and plumbing to accommodate new tenant build out. mep scope to support kitchen build-out and updated restrooms. | $8,061,217 |
| Sep 10, 2026 | In progress issued Sep 2026 | 345 Spear St | Novo Construction Inc | ground and 2nd floor: demolition of existing tenant suite on the ground floor and selective demolition on the 2nd floor. no new plumbing fixtures.Details
ground and 2nd floor: demolition of existing tenant suite on the ground floor and selective demolition on the 2nd floor. no new plumbing fixtures. | $22,000 |
| Sep 9, 2026 | In progress issued Sep 2026 | 255 California St | Novo Construction Inc | ste #725 - tenant improvement to include interior demolition. construction of 4 new private offices. modification of existing finishes. no new plumbing fixtures.Details
ste #725 - tenant improvement to include interior demolition. construction of 4 new private offices. modification of existing finishes. no new plumbing fixtures. | $185,000 |
| Sep 1, 2026 | In progress issued Sep 2026 | 600 California St | Novo Construction Inc | 16th and 17th floors: partial demolition to include non-structural partitions. suspended ceilings, finishes etc. ab-017Details
16th and 17th floors: partial demolition to include non-structural partitions. suspended ceilings, finishes etc. ab-017 | $35,000 |
| Aug 24, 2026 | In progress issued Sep 2026 | 300 Howard St | Novo Construction Inc | 14th/f: structural upgrade to accommodate future t.i.Details
14th/f: structural upgrade to accommodate future t.i. | $165,000 |
| Aug 20, 2026 | In progress issued Sep 2026 | 300 Howard St | Novo Construction Inc | 15th f/l: structural upgrades to accomodate future tenant buildout.Details
15th f/l: structural upgrades to accomodate future tenant buildout. | $165,000 |
| Aug 18, 2026 | In progress filed Aug 2026, not yet issued | 425 Market St | Novo Construction Inc | full floor tenant improvement on the 3rd fl. new construction of non strucrtural partitions, new ceilings, finishes, restrooms, mechanical, electrical, plumbingDetails
full floor tenant improvement on the 3rd fl. new construction of non strucrtural partitions, new ceilings, finishes, restrooms, mechanical, electrical, plumbing | $3,200,000 |
| Aug 18, 2026 | In progress issued Sep 2026 | 255 California St | Novo Construction Inc | suite 1350. t.i. to include interior demolition. new demising walls, new interior partitions.Details
suite 1350. t.i. to include interior demolition. new demising walls, new interior partitions. | $600,000 |
| Aug 17, 2026 | In progress issued Sep 2026 | 300 Howard St | Novo Construction Inc | 7th & 8th floors: t.i. including new interior walls, ceiling, milkwork and finishes.Details
7th & 8th floors: t.i. including new interior walls, ceiling, milkwork and finishes. | $15,451,442 |
| Aug 10, 2026 | In progress issued Sep 2026 | 400 Howard St | Novo Construction Inc | plumbing work t.i. on the 5th flr. ref#: 202606183492Details
plumbing work t.i. on the 5th flr. ref#: 202606183492 | $20,000 |
| Aug 10, 2026 | In progress issued Aug 2026 | 400 Howard St | Novo Construction Inc | plumbing work t.i. on the 6th flr. ref#: 202605121069Details
plumbing work t.i. on the 6th flr. ref#: 202605121069 | $20,000 |
| Aug 6, 2026 | In progress issued Sep 2026 | 667 Mission St | Novo Construction Inc | mechanical and electrical work for tenant improvement on the 5th flr. ref#: 202606223612.Details
mechanical and electrical work for tenant improvement on the 5th flr. ref#: 202606223612. | $175,000 |
| Aug 5, 2026 | In progress issued Aug 2026 | 188 The Embarcadero | Novo Construction Inc | roof: equipment anchorage for new hvac units. ref #202605211690Details
roof: equipment anchorage for new hvac units. ref #202605211690 | $15,000 |
| Aug 4, 2026 | In progress issued Aug 2026 | 225 Bush St | Novo Construction Inc | 2nd fl construction and cosmetic finish updates to a 1429 sq ft portion of the e office area (southeastern corner of the floor plate. the work includes demo of 4 phone rooms in place of 2 new offices, and dividing 1 conference room into 2 offices. no new materials or finishes added to the scopeDetails
2nd fl construction and cosmetic finish updates to a 1429 sq ft portion of the e office area (southeastern corner of the floor plate. the work includes demo of 4 phone rooms in place of 2 new offices, and dividing 1 conference room into 2 offices. no new materials or finishes added to the scope | $400,000 |
| Jul 31, 2026 | In progress issued Aug 2026 | 405 Howard St | Novo Construction Inc | 3rd fl - mech work ti ref pa 202607064544Details
3rd fl - mech work ti ref pa 202607064544 | $56,000 |
| Jul 31, 2026 | In progress issued Aug 2026 | 405 Howard St | Novo Construction Inc | 3rd fl - electrical work ti ref pa 202607064544Details
3rd fl - electrical work ti ref pa 202607064544 | $199,000 |
| Jul 28, 2026 | In progress filed Jul 2026, not yet issued | 100 Sansome St | Novo Construction Inc | minor permit to alter: replacement of ground floor non- histroic exterior entry doors.Details
minor permit to alter: replacement of ground floor non- histroic exterior entry doors. | $140,260 |
| Jul 28, 2026 | In progress issued Jul 2026 | 400 Howard St | Novo Construction Inc | 4th floor: electrical work for ti 202604219766. new power and signal dev.Details
4th floor: electrical work for ti 202604219766. new power and signal dev. | $25,000 |
| Jul 28, 2026 | In progress issued Jul 2026 | 400 Howard St | Novo Construction Inc | 6th floor: electrical work for t.i. servery to include new power and signal . new lighting and controls. ref arch. #202605121069Details
6th floor: electrical work for t.i. servery to include new power and signal . new lighting and controls. ref arch. #202605121069 | $275,000 |
| Jul 28, 2026 | In progress issued Jul 2026 | 600 California St | Novo Construction Inc | 19/f & 20/f: interior demolition of non-structural partitions suspended ceiling, lighting, plumbing and finishes. ab-017Details
19/f & 20/f: interior demolition of non-structural partitions suspended ceiling, lighting, plumbing and finishes. ab-017 | $85,000 |
| Jul 28, 2026 | In progress issued Jul 2026 | 400 Howard St | Novo Construction Inc | 6th floor: electrical work for t.i. to include new power and signal devised throughout the space at 6th floor. ref pa #202604219806Details
6th floor: electrical work for t.i. to include new power and signal devised throughout the space at 6th floor. ref pa #202604219806 | $30,000 |
| Jul 28, 2026 | In progress issued Jul 2026 | 400 Howard St | Novo Construction Inc | 5th floor: electrical work for t.i. to include new power and signal devised throughout the space at 5th floor. ref pa #202604219807Details
5th floor: electrical work for t.i. to include new power and signal devised throughout the space at 5th floor. ref pa #202604219807 | $35,000 |
| Jul 23, 2026 | In progress issued Jul 2026 | 400 Howard St | Novo Construction Inc | 6th floor: mechanical work for t.i. ref pa #202604219806Details
6th floor: mechanical work for t.i. ref pa #202604219806 | $125,000 |
| Jul 23, 2026 | In progress issued Jul 2026 | 400 Howard St | Novo Construction Inc | mechanical work for tenant improvement on the 4th floor. ref.202604219766Details
mechanical work for tenant improvement on the 4th floor. ref.202604219766 | $125,000 |
| Jul 23, 2026 | In progress issued Jul 2026 | 400 Howard St | Novo Construction Inc | 5th floor: mechanical work for t.i. ref pa #202604219807Details
5th floor: mechanical work for t.i. ref pa #202604219807 | $125,000 |
| Jul 22, 2026 | In progress issued Jul 2026 | 415 Mission St | Novo Construction Inc | 57th and 58th floors:mechanical upgrades to existing system. add under floor terminal fan units with heating coil. add 2 fire/smoke dampers in passenger elevator lobbies.Details
57th and 58th floors:mechanical upgrades to existing system. add under floor terminal fan units with heating coil. add 2 fire/smoke dampers in passenger elevator lobbies. | $100,000 |
| Jul 15, 2026 | In progress issued Aug 2026 | 555 Mission St | Novo Construction Inc | 29/fl- ti to include (n) conferencing rooms, employee break area and storage spaceDetails
29/fl- ti to include (n) conferencing rooms, employee break area and storage space | $2,790,000 |
| Jul 15, 2026 | In progress issued Aug 2026 | 100 Sansome St | Novo Construction Inc | ground floor: interior tenant improvement, new partitions, finishes & restrooms. installation and seismic anchorage of (8) phone booths. mep deferred. change of use from retail to office.Details
ground floor: interior tenant improvement, new partitions, finishes & restrooms. installation and seismic anchorage of (8) phone booths. mep deferred. change of use from retail to office. | $1,107,603 |
| Jul 15, 2026 | In progress issued Jul 2026 | 655 Montgomery St | Novo Construction Inc | 10th/f ste# 1000: interior t.i. demo of non-structural partitions, new const of non-structural partitions, ceiling & lighting, millwork, and finishes, mep under separated permitDetails
10th/f ste# 1000: interior t.i. demo of non-structural partitions, new const of non-structural partitions, ceiling & lighting, millwork, and finishes, mep under separated permit | $1,800,000 |
| Jul 7, 2026 | In progress issued Jul 2026 | 300 Howard St | Novo Construction Inc | 9/f: structural upgrades to accommodate future tenant buildout.Details
9/f: structural upgrades to accommodate future tenant buildout. | $135,000 |
| Jul 7, 2026 | In progress issued Jul 2026 | 657 Mission St | Novo Construction Inc | mechanical & electrical work for tenant improvement on the 6th fl. ref arch 202606223622Details
mechanical & electrical work for tenant improvement on the 6th fl. ref arch 202606223622 | $700,000 |
| Jul 6, 2026 | In progress issued Aug 2026 | 300 Howard St | Novo Construction Inc | 16th fl: structural upgrades to accommodate future tenant buildoutDetails
16th fl: structural upgrades to accommodate future tenant buildout | $165,000 |
| Jul 6, 2026 | In progress issued Jul 2026 | 405 Howard St | Novo Construction Inc | 3/f: remodel of existing tenant space including demo and construction of non-structural partitions, doors, millwork, and finishes. new phone booths and food service coffee area. mep deferred.Details
3/f: remodel of existing tenant space including demo and construction of non-structural partitions, doors, millwork, and finishes. new phone booths and food service coffee area. mep deferred. | $1,714,000 |
| Jun 29, 2026 | In progress issued Jul 2026 | 505 Brannan St | Novo Construction Inc | selective tenant improvement demolition of non structural partitons and doors. new lighting and finishes for open office on the 4th and 5th fl m/e deferred.Details
selective tenant improvement demolition of non structural partitons and doors. new lighting and finishes for open office on the 4th and 5th fl m/e deferred. | $94,000 |
| Jun 29, 2026 | In progress issued Jun 2026 | 415 Kearny St | Novo Construction Inc | 3/f and 4/f: electrical work for tenant improvement. ref arch permits: 202603137505 (3/f), 202604139310 (3/f), 202603137502 (4/f), 202604109248 (4/f).Details
3/f and 4/f: electrical work for tenant improvement. ref arch permits: 202603137505 (3/f), 202604139310 (3/f), 202603137502 (4/f), 202604109248 (4/f). | $120,000 |
| Jun 29, 2026 | In progress issued Jun 2026 | 415 Kearny St | Novo Construction Inc | 4/f: mechanical work for tenant improvement. ref arch permit 202603137502 and 202604109248.Details
4/f: mechanical work for tenant improvement. ref arch permit 202603137502 and 202604109248. | $75,000 |
| Jun 29, 2026 | In progress issued Jun 2026 | 415 Kearny St | Novo Construction Inc | 3/f: mechanical work for tenant improvement. ref arch permit 202603137505 and 202604139310.Details
3/f: mechanical work for tenant improvement. ref arch permit 202603137505 and 202604139310. | $75,000 |
| Jun 26, 2026 | In progress issued Jul 2026 | 225 Bush St | Novo Construction Inc | 14th floor ti: remodel office spaceincluding break rooms, open and private offices, and conference rooms.new ceilings, 2 new single-user restrooms an new finishes. mep deferredDetails
14th floor ti: remodel office spaceincluding break rooms, open and private offices, and conference rooms.new ceilings, 2 new single-user restrooms an new finishes. mep deferred | $637,369 |
| Jun 25, 2026 | In progress issued Aug 2026 | 667 Mission St | Novo Construction Inc | basement level: interior demolition and construction to create new mailroom and mpoe at basement. new lobby and relocation of trash room at 1st floor. mep under separate permit.Details
basement level: interior demolition and construction to create new mailroom and mpoe at basement. new lobby and relocation of trash room at 1st floor. mep under separate permit. | $1,504,200 |
| Jun 24, 2026 | Completed final sign-off Aug 2026 | 888 Brannan St | Novo Construction Inc | 2nd fl interior tenant improvement to include construction of non structural non rated partition and doorDetails
2nd fl interior tenant improvement to include construction of non structural non rated partition and door | $71,725 |
| Jun 23, 2026 | In progress issued Sep 2026 | 667 Mission St | Novo Construction Inc | 4/f: tenant improvement to include interior demolition and construction of new partitions millwork and ceiling. mep, life safety and fire sprinkler under seperate permit.Details
4/f: tenant improvement to include interior demolition and construction of new partitions millwork and ceiling. mep, life safety and fire sprinkler under seperate permit. | $1,671,340 |
| Jun 23, 2026 | In progress issued Aug 2026 | 300 Howard St | Novo Construction Inc | 2 : structural upgrades to accommodate future tenant buildoutDetails
2 : structural upgrades to accommodate future tenant buildout | $200,000 |
| Jun 23, 2026 | In progress issued Sep 2026 | 657 Mission St | Novo Construction Inc | 4/f: tenant improvement to include interior demolition and construction of new partitions millwork and ceiling. mep, life safety and fire sprinkler under seperate permit.Details
4/f: tenant improvement to include interior demolition and construction of new partitions millwork and ceiling. mep, life safety and fire sprinkler under seperate permit. | $1,671,340 |
| Jun 22, 2026 | In progress issued Aug 2026 | 667 Mission St | Novo Construction Inc | new interconnecting stair between level 4-6Details
new interconnecting stair between level 4-6 | $1,197,277 |
| Jun 22, 2026 | In progress issued Jun 2026 | 657 Mission St | Novo Construction Inc | tenant improvemen on the 6th fl to include interior demolition of drinig fountain guards and storm drain riser. construction of new partition millwork and ceiong. mep under sep.Details
tenant improvemen on the 6th fl to include interior demolition of drinig fountain guards and storm drain riser. construction of new partition millwork and ceiong. mep under sep. | $2,139,556 |
| Jun 22, 2026 | In progress issued Jul 2026 | 657 Mission St | Novo Construction Inc | tenant improvement on the 5th fl to include interior demolition and construction of new partitions, millwork, ceiling. drywall coverage at windows overlooking 667 mission. mep, life safety, and fire sprinkler under sep permit.Details
tenant improvement on the 5th fl to include interior demolition and construction of new partitions, millwork, ceiling. drywall coverage at windows overlooking 667 mission. mep, life safety, and fire sprinkler under sep permit. | $2,929,920 |
| Jun 18, 2026 | In progress issued Jul 2026 | 400 Howard St | Novo Construction Inc | rev to pa# 2026-0421-9807: alteratin includes demo of 2 cofference rooms and existing millwork and construction of a prep room, janitor closet, and new millwork for break room and coffee stationDetails
rev to pa# 2026-0421-9807: alteratin includes demo of 2 cofference rooms and existing millwork and construction of a prep room, janitor closet, and new millwork for break room and coffee station | $19,596 |
| Jun 10, 2026 | Completed final sign-off Jul 2026 | 130 Sutter St | Novo Construction Inc | to obtain final inspection for work approved under pa# 202503273183. all work is complete.Details
to obtain final inspection for work approved under pa# 202503273183. all work is complete. | |
| Jun 8, 2026 | Completed final sign-off Jul 2026 | 77 Geary St | Novo Construction Inc | to obtain final inspection for work approved under pa# 202409060232. all work is complete.Details
to obtain final inspection for work approved under pa# 202409060232. all work is complete. | |
| May 21, 2026 | In progress issued Jul 2026 | 100 Stockton St | Novo Construction Inc | shoring and demo. levels 1-3 interior.Details
shoring and demo. levels 1-3 interior. | $173,545 |
| May 21, 2026 | In progress issued Jun 2026 | 188 The Embarcadero | Novo Construction Inc | removal of e and installation of new mechanical chiller, associated mech equip and modification to the raised grated steel platform and stairs. stuctural mech and electrical included.Details
removal of e and installation of new mechanical chiller, associated mech equip and modification to the raised grated steel platform and stairs. stuctural mech and electrical included. | $2,000,000 |
| May 19, 2026 | Completed final sign-off May 2026 | 69 Green St | Novo Construction Inc | to obtain final inspection for work approved under pa# 202504114212. all work is complete.Details
to obtain final inspection for work approved under pa# 202504114212. all work is complete. | |
| May 14, 2026 | In progress issued May 2026 | 188 The Embarcadero | Novo Construction Inc | this set of docs are for construction of a furniture storage room in the sub-level parking, the scope of work consists of the construction of non bearing partitions, ceilings, door, frames, hardware, and finishes.Details
this set of docs are for construction of a furniture storage room in the sub-level parking, the scope of work consists of the construction of non bearing partitions, ceilings, door, frames, hardware, and finishes. | $55,000 |
| May 12, 2026 | In progress issued Jun 2026 | 400 Howard St | Novo Construction Inc | 6th fl, new dining hall tenant improvement, includes non-structural partitions, doors, lighting, millwork, plumbing, electrical, and finishes. mep deferred.Details
6th fl, new dining hall tenant improvement, includes non-structural partitions, doors, lighting, millwork, plumbing, electrical, and finishes. mep deferred. | $1,965,424 |
| May 5, 2026 | In progress issued Sep 2026 | 350 Bush St | Novo Construction Inc | fl: 4 & 5: installation of 6 (e) phone boots and their associated anchoring.Details
fl: 4 & 5: installation of 6 (e) phone boots and their associated anchoring. | $6,500 |
| Apr 29, 2026 | Completed final sign-off Jun 2026 | 888 Brannan St | Novo Construction Inc | 1/f: electrical work for tenant improvement on the 1st floor storage area. ref arch 202604078996.Details
1/f: electrical work for tenant improvement on the 1st floor storage area. ref arch 202604078996. | $15,000 |
| Apr 29, 2026 | In progress issued May 2026 | 888 Brannan St | Novo Construction Inc | electrical work at 2nd, 3rd, and 4th floors.Details
electrical work at 2nd, 3rd, and 4th floors. | $35,000 |
| Apr 28, 2026 | Completed final sign-off Aug 2026 | 655 Montgomery St | Novo Construction Inc | electrical work for tenant improvement at the 6th and 7th floor. ref arch# 202602065450Details
electrical work for tenant improvement at the 6th and 7th floor. ref arch# 202602065450 | $140,000 |
| Apr 24, 2026 | In progress issued Apr 2026 | 100 01st St | Novo Construction Inc | 6,7,9,14 & 15th fl - installation of 14 new prior booths (3) on floor 5; (4) on floor 6, (2) on floor 7 (1) on the floor 8, (2) on floor 14 and (2) on floor 15Details
6,7,9,14 & 15th fl - installation of 14 new prior booths (3) on floor 5; (4) on floor 6, (2) on floor 7 (1) on the floor 8, (2) on floor 14 and (2) on floor 15 | $50,000 |
| Apr 23, 2026 | In progress issued May 2026 | 259 California St | Novo Construction Inc | ground fl - commercial interior ti. remodel existing cafe space with new service counter, floor & ceiling treatments, finishes, equipment and limited partition changes. enlarge existing bathroom for barrier removal. no structural work. no changes to exterior envelope. mep included.Details
ground fl - commercial interior ti. remodel existing cafe space with new service counter, floor & ceiling treatments, finishes, equipment and limited partition changes. enlarge existing bathroom for barrier removal. no structural work. no changes to exterior envelope. mep included. | $650,000 |
| Apr 21, 2026 | In progress issued May 2026 | 85 02nd St | Novo Construction Inc | 2nd & 3rd fl - ti includes demo of non-structural partitions and bldg new non-structural partitions. all new meps and life safety work will be design build and submitted for permit separately (bldg is fully sprinklered) ref pa 202603278389Details
2nd & 3rd fl - ti includes demo of non-structural partitions and bldg new non-structural partitions. all new meps and life safety work will be design build and submitted for permit separately (bldg is fully sprinklered) ref pa 202603278389 | $1,417,190 |
| Apr 21, 2026 | In progress issued May 2026 | 400 Howard St | Novo Construction Inc | 6th floor. addition of phone booths and work stations to existing office suite. alteration of existing idf room. new drinking fountains.Details
6th floor. addition of phone booths and work stations to existing office suite. alteration of existing idf room. new drinking fountains. | $215,720 |
| Apr 21, 2026 | In progress issued Jun 2026 | 400 Howard St | Novo Construction Inc | 4th floor. addition of phone booths and work stations to (e) suite on the 4th floor, infill of 1 (e) doorway at demising wall.Details
4th floor. addition of phone booths and work stations to (e) suite on the 4th floor, infill of 1 (e) doorway at demising wall. | $235,100 |
| Apr 21, 2026 | In progress issued May 2026 | 400 Howard St | Novo Construction Inc | 5th floor. addition of 58 phone booths and other work stations to existing office suite. alteration of existing idf room. new drinking fountains.Details
5th floor. addition of 58 phone booths and other work stations to existing office suite. alteration of existing idf room. new drinking fountains. | $365,040 |
| Apr 20, 2026 | Completed final sign-off Aug 2026 | 655 Montgomery St | Novo Construction Inc | 6th & 7th floors - mechanical work for ti ref pa 202602065450Details
6th & 7th floors - mechanical work for ti ref pa 202602065450 | $175,000 |
| Apr 16, 2026 | Completed final sign-off Jul 2026 | 1188 Franklin St | Novo Construction Inc | to obtain final inspection for work approved under pa#: 202409050136. all work is completeDetails
to obtain final inspection for work approved under pa#: 202409050136. all work is complete | |
| Apr 13, 2026 | Completed final sign-off Oct 2026 | 415 Kearny St | Novo Construction Inc | revision to bpa #2026.0313.7505 to add work station end panels and layout, elevations add drapery pocket detail, revise lights fixture layout at reception 309. add card readersDetails
revision to bpa #2026.0313.7505 to add work station end panels and layout, elevations add drapery pocket detail, revise lights fixture layout at reception 309. add card readers | |
| Apr 13, 2026 | In progress issued May 2026 | 188 The Embarcadero | Novo Construction Inc | basement - set of document is for construction of an mep equipement platform avoce the existing parking access rampDetails
basement - set of document is for construction of an mep equipement platform avoce the existing parking access ramp | $35,000 |
| Apr 10, 2026 | In progress issued Apr 2026 | 415 Kearny St | Novo Construction Inc | revision to pa#202603137502 to add work station end panels, drapery pocket details, add ceiling to open office 410. addition of card readersDetails
revision to pa#202603137502 to add work station end panels, drapery pocket details, add ceiling to open office 410. addition of card readers | |
| Apr 7, 2026 | Completed final sign-off Jun 2026 | 888 Brannan St | Novo Construction Inc | 1st fl - interior tenant improvement to include selective demo and construction of non-structural partitions and finishes. elect/lighting under separate permitDetails
1st fl - interior tenant improvement to include selective demo and construction of non-structural partitions and finishes. elect/lighting under separate permit | $85,000 |
| Apr 2, 2026 | In progress issued Apr 2026 | 400 Howard St | Novo Construction Inc | 5th & 6th/f men's & women's restroom remodel, floors are currently unoccupied, no changes to mech, sprinkler, or fire alarm system. electrical deferredDetails
5th & 6th/f men's & women's restroom remodel, floors are currently unoccupied, no changes to mech, sprinkler, or fire alarm system. electrical deferred | $741,472 |
| Apr 1, 2026 | Completed final sign-off Aug 2026 | 255 California St | Novo Construction Inc | electrical work for t.i. on the 11th floor. ref 202603248142Details
electrical work for t.i. on the 11th floor. ref 202603248142 | $7,000 |
| Mar 30, 2026 | In progress issued Apr 2026 | 199 Fremont St | Novo Construction Inc | floor 1,3, 8, 11, 12, 17, 18, 20, 21, 22. interior non-strucutural demo of (e) unoccupied floors include removal of walls, ceilings, millworks, finishes, doors, light fixture per ab-017.Details
floor 1,3, 8, 11, 12, 17, 18, 20, 21, 22. interior non-strucutural demo of (e) unoccupied floors include removal of walls, ceilings, millworks, finishes, doors, light fixture per ab-017. | $1,500,000 |
| Mar 27, 2026 | In progress issued Mar 2026 | 85 02nd St | Novo Construction Inc | 2nd & 3rd fl - ti including demo of non-structural partitions (bldg is fully sprinklered). existing ceiling. ceiling work to remain. no sprinkler work needed (ab017)Details
2nd & 3rd fl - ti including demo of non-structural partitions (bldg is fully sprinklered). existing ceiling. ceiling work to remain. no sprinkler work needed (ab017) | $106,000 |
| Mar 27, 2026 | In progress issued Mar 2026 | 85 02nd St | Novo Construction Inc | 1st fl - ti including demo of non-structural partitions (bldg is fully sprinklered). existing ceiling work to remain. no sprinkler work needed (ab017). improvement for build back under separate permitDetails
1st fl - ti including demo of non-structural partitions (bldg is fully sprinklered). existing ceiling work to remain. no sprinkler work needed (ab017). improvement for build back under separate permit | $50,000 |
| Mar 24, 2026 | In progress issued Mar 2026 | 255 California St | Novo Construction Inc | 11/f suite 1100: interior tenant improvement. installation of (4) new furniture pods. structural anchoring and reinforcement.Details
11/f suite 1100: interior tenant improvement. installation of (4) new furniture pods. structural anchoring and reinforcement. | $15,000 |
| Mar 16, 2026 | In progress issued Mar 2026 | 199 Fremont St | Novo Construction Inc | 4,5,9,14,15,16 f/l - interior non-structural demo of (e) unoccupied floors include removal of walls, ceilings, millwork, finishes, doors, light fixtures per ab-017.Details
4,5,9,14,15,16 f/l - interior non-structural demo of (e) unoccupied floors include removal of walls, ceilings, millwork, finishes, doors, light fixtures per ab-017. | $1,000,000 |
| Mar 13, 2026 | In progress issued Mar 2026 | 415 Kearny St | Novo Construction Inc | 4th fl - tenant improvement to include open office, phone rooms, break areaDetails
4th fl - tenant improvement to include open office, phone rooms, break area | $286,000 |
| Mar 13, 2026 | In progress issued Mar 2026 | 415 Kearny St | Novo Construction Inc | 3rd fl - tenant improvement to include millwork, doors, frames, sidelights, ceiling tiles. mep under separate pertmiDetails
3rd fl - tenant improvement to include millwork, doors, frames, sidelights, ceiling tiles. mep under separate pertmi | $353,000 |
| Mar 9, 2026 | Completed final sign-off May 2026 | 300 Mission St | Novo Construction Inc | 22nd floor: minor interior t.i. new partitions and finishesDetails
22nd floor: minor interior t.i. new partitions and finishes | $157,680 |
| Feb 24, 2026 | Completed final sign-off Jun 2026 | 888 Brannan St | Novo Construction Inc | 4th fl ref pa #2026-0107-3338: deferred electricalDetails
4th fl ref pa #2026-0107-3338: deferred electrical | $15,000 |
| Feb 18, 2026 | Completed final sign-off Apr 2026 | 555 Mission St | Novo Construction Inc | 17th fl, ste 1750 - mech & elec work for ti ref pa 202601083478Details
17th fl, ste 1750 - mech & elec work for ti ref pa 202601083478 | $55,000 |
| Feb 17, 2026 | Completed final sign-off Jun 2026 | 888 Brannan St | Novo Construction Inc | 4th fl - mechanical work for ti ref pa 202601073338Details
4th fl - mechanical work for ti ref pa 202601073338 | $60,000 |
| Feb 10, 2026 | In progress issued Feb 2026 | 415 Kearny St | Novo Construction Inc | 3rd fl - selective demo of interior office space to remove millwork, doors, frames, side lights, lighting and ceiling ab-017Details
3rd fl - selective demo of interior office space to remove millwork, doors, frames, side lights, lighting and ceiling ab-017 | $34,000 |
| Feb 6, 2026 | Completed final sign-off Aug 2026 | 655 Montgomery St | Novo Construction Inc | 6/f and 7/f: interior t.i. removal and construction of non-structural partitions, door assemblies, light fixtures, plumbing fixtures, millwork, electrical outlets, and new finishes. mep, fire life safety is deferred.Details
6/f and 7/f: interior t.i. removal and construction of non-structural partitions, door assemblies, light fixtures, plumbing fixtures, millwork, electrical outlets, and new finishes. mep, fire life safety is deferred. | $2,000,000 |
| Feb 5, 2026 | In progress issued Feb 2026 | 415 Kearny St | Novo Construction Inc | 4/f: selective demolition of interior office space to remove millwork, doors, frames,side lights, lighting and ceilings. ab017.Details
4/f: selective demolition of interior office space to remove millwork, doors, frames,side lights, lighting and ceilings. ab017. | $34,000 |
| Feb 3, 2026 | In progress issued Feb 2026 | 500 Terry A Francois Bl | Novo Construction Inc | 3rd/f revision to 202507029993: revised phone pod locationsDetails
3rd/f revision to 202507029993: revised phone pod locations | |
| Feb 3, 2026 | In progress issued Feb 2026 | 500 Terry A Francois Bl | Novo Construction Inc | level 2 revision to pa#: 202506269604. revised (e) phone pod locations.Details
level 2 revision to pa#: 202506269604. revised (e) phone pod locations. |