Robert Tranter
- Listed as
- architect, designer
- Firm
- Formed Architecture
- Based in
- Sonoma
- On San Francisco permits
- Nov 2023 to Apr 2026
6 permits since 2000 (architect on 5 permits, designer on 1 permit): 4 completed, 2 in progress.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 1, 2026 | Completed final sign-off Jun 2026 | 218 10th Av | Cairn Construction | replace existing front stair and landing with natural stone treads and risers. refinish existing front metal handrail and guardrail.Details
replace existing front stair and landing with natural stone treads and risers. refinish existing front metal handrail and guardrail. | $15,000 |
| Mar 10, 2026 | In progress issued Mar 2026 | 16 Presidio Tr | Cairn Construction | revision to pa 202508072496 exterior: replace (e) brick w/brick in-kind; replace siding and trim with new siding in-kind; replace (e) entry brick in-kind; replace (e) brick on north elevationn, with stucco window revisions. remove 2 private trees w/in house; replace retaining wall w/brick in-kindDetails
revision to pa 202508072496 exterior: replace (e) brick w/brick in-kind; replace siding and trim with new siding in-kind; replace (e) entry brick in-kind; replace (e) brick on north elevationn, with stucco window revisions. remove 2 private trees w/in house; replace retaining wall w/brick in-kind | $15,000 |
| Sep 16, 2025 | Completed final sign-off Feb 2026 | 324 03rd Av | North Bay Construction | revision to pa #202502069809. front step material change. front railing material change. two lights added for garage.Details
revision to pa #202502069809. front step material change. front railing material change. two lights added for garage. | |
| Aug 18, 2025 | In progress issued Jan 2026 | 16 Presidio Tr | Cairn Construction | int: reno at each floor, lowering slab on grade -1' at level 0. (e) & (n) stair revisions and (n) elevator struct revisions, along w/seismic upgrade as needed throughout. ext: new window openings at side and rear. no change to front. (n) deck @ rear. sliding doors and trim details replaced.Details
int: reno at each floor, lowering slab on grade -1' at level 0. (e) & (n) stair revisions and (n) elevator struct revisions, along w/seismic upgrade as needed throughout. ext: new window openings at side and rear. no change to front. (n) deck @ rear. sliding doors and trim details replaced. | $2,500,000 |
| Feb 6, 2025 | Completed final sign-off Feb 2026 | 324 03rd Av | North Bay Construction | front exterior replace stair finishes with terrazzo guardrail, handrail & stoop flooring in-kind. install siding in kind over (e) stucco at the stairs and stair lighting. perform maintenance painting on the facade. replace garage door in kind. rear exterior: demo existing deck & replace with (n)deckDetails
front exterior replace stair finishes with terrazzo guardrail, handrail & stoop flooring in-kind. install siding in kind over (e) stucco at the stairs and stair lighting. perform maintenance painting on the facade. replace garage door in kind. rear exterior: demo existing deck & replace with (n)deck | $180,000 |
| Nov 17, 2023 | Completed final sign-off Oct 2024 | 559 02nd Av | G Landscape Division Llc | backyard: new deck on posts below 10', fire wall, new deck patio below 3', stairs, gas line to fireplace & future heaters, built-in seating, and planter. house: repaint front and back, repair damaged siding in kind, replace back door, repair or replace in kind front door, replace front handrail.Details
backyard: new deck on posts below 10', fire wall, new deck patio below 3', stairs, gas line to fireplace & future heaters, built-in seating, and planter. house: repaint front and back, repair damaged siding in kind, replace back door, repair or replace in kind front door, replace front handrail. | $300,000 |