Robert Chiang
- Listed as
- authorized agent-others, contractor
- Firm
- Chiang C M Construction Inc.
- Based in
- San Francisco
- On San Francisco permits
- Sep 2000 to Sep 2026
106 permits since 2000 (contractor on 106 permits, authorized agent-others on 2 permits): 69 completed, 9 in progress, 15 never finaled, 13 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. Their ranked record as a contractor is on their contractor page. How to read these records
Most recent permits
Showing the 100 most recent of 106.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 10, 2026 | In progress filed Sep 2026, not yet issued | 1100 Van Ness Av | Chiang C M Construction Inc. | revision to pa# 202601153928. remove sloping walk and door handles.Details
revision to pa# 202601153928. remove sloping walk and door handles. | $1,000 |
| Feb 24, 2026 | In progress issued Jun 2026 | 1100 Van Ness Av | Chiang C M Construction Inc. | suite 201:: t.i. for daycare including children less than 3 years old. provide counter with sink, storage cabinets, lighting, hvac & electrical.Details
suite 201:: t.i. for daycare including children less than 3 years old. provide counter with sink, storage cabinets, lighting, hvac & electrical. | $125,000 |
| Jul 31, 2025 | Completed final sign-off Aug 2025 | 1206 15th Av | Chiang C M Construction Inc. | to obtain a final inspection for work approved under pa # 200605111391. all work is complete.Details
to obtain a final inspection for work approved under pa # 200605111391. all work is complete. | |
| Jul 23, 2025 | Completed final sign-off Sep 2025 | 354 23rd Av | Chiang C M Construction Inc. | in kind remodel of (2) bathrooms. replace kitchen cabinets.Details
in kind remodel of (2) bathrooms. replace kitchen cabinets. | $20,000 |
| Jun 3, 2025 | Completed final sign-off Jan 2026 | 4750 Geary Bl | Chiang C M Construction Inc. | revision to pa # 202411145039: a) seal and restripe existing parking lot. b) construction of new blended transition ramp for accessible path of travel and accessible entrance. c)new accessible entrance to manager unit.Details
revision to pa # 202411145039: a) seal and restripe existing parking lot. b) construction of new blended transition ramp for accessible path of travel and accessible entrance. c)new accessible entrance to manager unit. | |
| Apr 15, 2025 | Completed final sign-off Jul 2025 | 27 Van Ness Av | Chiang C M Construction Inc. | revision to pa 202207138394, install a new door actuator, card reader and video intercom at the base of column to serve the public entry doors and related elec workDetails
revision to pa 202207138394, install a new door actuator, card reader and video intercom at the base of column to serve the public entry doors and related elec work | $4,000 |
| Mar 28, 2025 | In progress issued Aug 2025 | 33 Marne Av | Chiang C M Construction Inc. | install structural for ceiling mounted hoist at upper levelDetails
install structural for ceiling mounted hoist at upper level | $10,000 |
| Nov 14, 2024 | Completed final sign-off Jan 2026 | 4750 Geary Bl | Chiang C M Construction Inc. | seal and restripe existing parking lot, construt new curb ramp for accessible path of travel and accessible entrance, new accessible entrance to managers unitDetails
seal and restripe existing parking lot, construt new curb ramp for accessible path of travel and accessible entrance, new accessible entrance to managers unit | $21,500 |
| Jun 11, 2024 | Completed final sign-off Aug 2024 | 356 23rd Av | Chiang C M Construction Inc. | remodel 1 kitchen and 2 bathrooms in kind. no removal of wallsDetails
remodel 1 kitchen and 2 bathrooms in kind. no removal of walls | $16,000 |
| May 6, 2024 | Completed final sign-off May 2024 | 1206 15th Av | Chiang C M Construction Inc. | to obtain final inspection. 201104083728. all work is complete.Details
to obtain final inspection. 201104083728. all work is complete. | |
| May 2, 2024 | In progress issued Jun 2025 | 2401 Keith St | Chiang C M Construction Inc. | tenant improvment of southeast health center 2401 keith st clinic building. interior scope includes modified partitions, finishes, improvements to mechanical, electrical, plumbing, fire protection/alarm systems, glazing replacement and modifications to sidewalk landscape area along armstrong av.Details
tenant improvment of southeast health center 2401 keith st clinic building. interior scope includes modified partitions, finishes, improvements to mechanical, electrical, plumbing, fire protection/alarm systems, glazing replacement and modifications to sidewalk landscape area along armstrong av. | $8,950,000 |
| Feb 29, 2024 | In progress issued Feb 2024 | 322 30th Av | Chiang C M Construction Inc. | revision to pa# 2016-1222-5772 new kitchen layout, install and relocate new gas meter and electrical meter. new wall for storage area. new ceiling layout. new windows in the rearDetails
revision to pa# 2016-1222-5772 new kitchen layout, install and relocate new gas meter and electrical meter. new wall for storage area. new ceiling layout. new windows in the rear | $40,000 |
| Feb 13, 2024 | Completed final sign-off Apr 2024 | 354 23rd Av | Chiang C M Construction Inc. | replace 2 furnaces in kind. same location in garage. ductwork for replacement of furnace.Details
replace 2 furnaces in kind. same location in garage. ductwork for replacement of furnace. | $800 |
| Jan 25, 2024 | Completed final sign-off Jul 2024 | 555 Hyde St | Chiang C M Construction Inc. | repair / restore 3 of the total 7 windows on the south-east corner of the building with same design as existing 3 windows on the 2/f only. fixed glass. same size, same locations, max u-factor 0.30.Details
repair / restore 3 of the total 7 windows on the south-east corner of the building with same design as existing 3 windows on the 2/f only. fixed glass. same size, same locations, max u-factor 0.30. | $2,380 |
| Jan 22, 2024 | In progress issued Jan 2024 | 322 30th Av | Chiang C M Construction Inc. | to obtain finalinspection for work approved under pa# 202009013194 and 202101192913Details
to obtain finalinspection for work approved under pa# 202009013194 and 202101192913 | |
| Jan 22, 2024 | In progress issued Jan 2024 | 322 30th Av | Chiang C M Construction Inc. | to complete work and obtain final inspection for pa#2016-1222-5772 and pa# 202102084271Details
to complete work and obtain final inspection for pa#2016-1222-5772 and pa# 202102084271 | $70,000 |
| Dec 5, 2023 | Completed final sign-off Mar 2025 | 2238 41st Av | Chiang C M Construction Inc. | replace (2) front facade windows w/ alum clad wood windoows in same openings. uf<0.3. 2nd story.Details
replace (2) front facade windows w/ alum clad wood windoows in same openings. uf<0.3. 2nd story. | $7,000 |
| Nov 17, 2023 | In progress issued Dec 2024 | 623 09th Av | Chiang C M Construction Inc. | horizontal addition. construct new adu under government code section 65852.2 - state program ; 1st/f: attached adu approx 886 sqft. 2nd/f: new deck above ground floor extension rear bay window alterations interior remodeling3rd/f: new deck. rear bay window alteration. interior remodeling.Details
horizontal addition. construct new adu under government code section 65852.2 - state program ; 1st/f: attached adu approx 886 sqft. 2nd/f: new deck above ground floor extension rear bay window alterations interior remodeling3rd/f: new deck. rear bay window alteration. interior remodeling. | $10,000 |
| Nov 16, 2023 | Completed final sign-off Mar 2025 | 2238 41st Av | Chiang C M Construction Inc. | 2nd floor kitchen and bathroom remodel. replace all windows, not the windows at the front facade.Details
2nd floor kitchen and bathroom remodel. replace all windows, not the windows at the front facade. | $140,000 |
| Nov 2, 2023 | Completed final sign-off Jan 2025 | 600 41st Av | Chiang C M Construction Inc. | to obtain final inspection for work approved under pa201709138037. all work is complete.Details
to obtain final inspection for work approved under pa201709138037. all work is complete. | |
| Nov 2, 2023 | In progress issued Nov 2023 | 600 41st Av | Chiang C M Construction Inc. | recommencement and completion of work approved under 201803234437.Details
recommencement and completion of work approved under 201803234437. | $46,000 |
| Oct 31, 2023 | Completed final sign-off Aug 2025 | 866 Valencia St | Chiang C M Construction Inc. | interior remodel of ground floor space for new private daycare / preschool tenant. new finishes, new plumbing fixtures, new ada toilet room, new mechanical system, new lighting. also includes alteration to front facade for new exit corridor.Details
interior remodel of ground floor space for new private daycare / preschool tenant. new finishes, new plumbing fixtures, new ada toilet room, new mechanical system, new lighting. also includes alteration to front facade for new exit corridor. | $150,000 |
| Oct 27, 2023 | Completed final sign-off Dec 2023 | 1000 North Point St | Chiang C M Construction Inc. | unit #1206: replace flooring and fixtures in bathroom in kind. replace countertop and appliances in kitchen in kind. relocate electrical panel.Details
unit #1206: replace flooring and fixtures in bathroom in kind. replace countertop and appliances in kitchen in kind. relocate electrical panel. | $10,000 |
| Jul 27, 2023 | Completed final sign-off Mar 2024 | 1845 Irving St | Chiang C M Construction Inc. | convert (e) restroom into ada restroom. barrier removalDetails
convert (e) restroom into ada restroom. barrier removal | $18,000 |
| Jun 29, 2023 | Completed final sign-off Jun 2024 | 1845 Irving St | Chiang C M Construction Inc. | abe compliance per ord no 51-16. remove portion of exist conc to create 2% slope to entry. 2 new entry doors. new signage for ada abe 202206241210Details
abe compliance per ord no 51-16. remove portion of exist conc to create 2% slope to entry. 2 new entry doors. new signage for ada abe 202206241210 | $12,000 |
| May 4, 2023 | Never finaled issued May 2023, no final | 33 Marne Av | Chiang C M Construction Inc. | interior remodel to provide accessiblity upgrades to existing single family dwelling including kitchen, bathroom, and stairs. associated electrical and plumbing works. interior workDetails
interior remodel to provide accessiblity upgrades to existing single family dwelling including kitchen, bathroom, and stairs. associated electrical and plumbing works. interior work | $140,289 |
| Apr 20, 2023 | Completed final sign-off Apr 2024 | 1250 Hyde St | Chiang C M Construction Inc. | apt#1: revision amendments to pa# 201706300866, interior layout changes, interior layout change from (1) bathroom to (2) bathrooms. relocate garage man door , show 2nd stairs in courtyard, remmove non-bearing walls in living rm, reome (2) south facing windows in lightwell, enlarge windowDetails
apt#1: revision amendments to pa# 201706300866, interior layout changes, interior layout change from (1) bathroom to (2) bathrooms. relocate garage man door , show 2nd stairs in courtyard, remmove non-bearing walls in living rm, reome (2) south facing windows in lightwell, enlarge window | $10,000 |
| Apr 14, 2023 | Completed final sign-off Apr 2024 | 1250 Hyde St | Chiang C M Construction Inc. | to obtain final inspection for work approved under pa# 201706300866. all work is complete.Details
to obtain final inspection for work approved under pa# 201706300866. all work is complete. | |
| Apr 11, 2023 | Expired or cancelled expired Nov 2025 | 322 30th Av | Chiang C M Construction Inc. | replace & add n concrete footing at garage & lobby. due to e footing sill plate is below grade replace 20 ft e footing w/ n concrete footing within the property line. ref 201611042016 & 202102084271.Details
replace & add n concrete footing at garage & lobby. due to e footing sill plate is below grade replace 20 ft e footing w/ n concrete footing within the property line. ref 201611042016 & 202102084271. | $5,000 |
| Nov 17, 2022 | Completed final sign-off Nov 2023 | 1551 Hyde St | Chiang C M Construction Inc. | to renew expired permit#: 201905160811. all work are completed. for final inspection onlyDetails
to renew expired permit#: 201905160811. all work are completed. for final inspection only | |
| Sep 27, 2022 | Completed final sign-off Mar 2023 | 2018 Laguna St | Chiang C M Construction Inc. | in-kind (1) kitchen & (1) bath remodel, addition of recessed lights with 1 hr rated housing, convert bathtub to shower.Details
in-kind (1) kitchen & (1) bath remodel, addition of recessed lights with 1 hr rated housing, convert bathtub to shower. | $30,000 |
| Jul 13, 2022 | Completed final sign-off Jul 2025 | 27 Van Ness Av | Chiang C M Construction Inc. | tenant improvement of 27 van ness suite with demolition and construction scope for wall partitions, flooring, ceilings, finishes, as well as related mechanical, plumbing, fire protection, and electrical work.Details
tenant improvement of 27 van ness suite with demolition and construction scope for wall partitions, flooring, ceilings, finishes, as well as related mechanical, plumbing, fire protection, and electrical work. | $1,750,000 |
| Jun 27, 2022 | Never finaled issued Jun 2023, no final | 218 Sadowa St | Chiang C M Construction Inc. | relocation portion of front wall of (218 sadowa st) (e) rear bldg. see pa# 202105059852 for detail.Details
relocation portion of front wall of (218 sadowa st) (e) rear bldg. see pa# 202105059852 for detail. | |
| Jun 17, 2022 | Never finaled issued Jun 2022, no final | 1507 California St | Chiang C M Construction Inc. | revision to pa# 202108096080 structural plan sheeet 1 was incorrect, replacing sheet 1 with revised structural planDetails
revision to pa# 202108096080 structural plan sheeet 1 was incorrect, replacing sheet 1 with revised structural plan | |
| May 26, 2022 | Expired or cancelled expired Oct 2024 | 1206 15th Av | Chiang C M Construction Inc. | to obtain a final inspection for work approved under previous permit 200605111391. all work is complete.Details
to obtain a final inspection for work approved under previous permit 200605111391. all work is complete. | |
| Jan 12, 2022 | Completed final sign-off Oct 2023 | 327 Vernon St | Chiang C M Construction Inc. | in-kind remodeling of 1 bathroom(s) in 2nd fl with 0 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in 2nd fl with 0 shower pan(s). | $13,500 |
| Aug 9, 2021 | Completed final sign-off Oct 2022 | 1507 California St | Chiang C M Construction Inc. | revision to 201504234504. install remedial measures per vrap(dph). install new in-line fan & air filter system @ roof top. connecting (e) vertical pipe termination @ roof. to comply w/ dph letter. install and connect seismic support and cables. electrical and plumbing under separated permitsDetails
revision to 201504234504. install remedial measures per vrap(dph). install new in-line fan & air filter system @ roof top. connecting (e) vertical pipe termination @ roof. to comply w/ dph letter. install and connect seismic support and cables. electrical and plumbing under separated permits | $5,000 |
| Aug 5, 2021 | Expired or cancelled cancelled Jan 2026 | 600 41st Av | Chiang C M Construction Inc. | change hvac from gas furnace to heat pump. ref app#201803234437Details
change hvac from gas furnace to heat pump. ref app#201803234437 | $15,000 |
| May 5, 2021 | Never finaled issued Jun 2023, no final | 218 Sadowa St | Chiang C M Construction Inc. | add a new 3-story, no basement, type v-b, adu per ordinance no. 95-17. provide 93 sq. sf. landscape area and 207 sq. ft. permeable paver area in front yard.Details
add a new 3-story, no basement, type v-b, adu per ordinance no. 95-17. provide 93 sq. sf. landscape area and 207 sq. ft. permeable paver area in front yard. | $250,000 |
| Feb 8, 2021 | Expired or cancelled expired Nov 2025 | 322 30th Av | Chiang C M Construction Inc. | revision to pa# 201611042016. relocate moment frame and shear walls.Details
revision to pa# 201611042016. relocate moment frame and shear walls. | |
| Jan 19, 2021 | Never finaled issued May 2021, no final | 322 30th Av | Chiang C M Construction Inc. | rev to pa202009013194: revised retaining wall and footing in the 1/f.Details
rev to pa202009013194: revised retaining wall and footing in the 1/f. | |
| Nov 9, 2020 | Completed final sign-off Jun 2022 | 1040 Geary St | Chiang C M Construction Inc. | tenant improvement for day care. adult restrooms, child restrooms, coffee counter, (n) lighting & hvacDetails
tenant improvement for day care. adult restrooms, child restrooms, coffee counter, (n) lighting & hvac | $300,000 |
| Nov 8, 2019 | Completed final sign-off Sep 2022 | 1508 Taylor St | Chiang C M Construction Inc. | legalization of dwelling unit installed without a permit. legalization of existing unauthorized dwelling unit under ordinance 43-14. nfpa 13 fire sprinkler permit to be deferred per cbc 107.2.fs-05Details
legalization of dwelling unit installed without a permit. legalization of existing unauthorized dwelling unit under ordinance 43-14. nfpa 13 fire sprinkler permit to be deferred per cbc 107.2.fs-05 | $30,000 |
| Oct 24, 2019 | Completed final sign-off Dec 2019 | 2315 Mission St | Chiang C M Construction Inc. | apt 201: replace existing damage cabinets, countertop, bath tile and shower.Details
apt 201: replace existing damage cabinets, countertop, bath tile and shower. | $8,200 |
| Sep 13, 2019 | Completed final sign-off Dec 2019 | 1571 09th Av | Chiang C M Construction Inc. | remove all (e) kitchen cabinets & replace w/ new. (n) counter top, sink & faucet, electrical outlets, floors. change bathroom bathtub & faucet, replace tile all in same location.Details
remove all (e) kitchen cabinets & replace w/ new. (n) counter top, sink & faucet, electrical outlets, floors. change bathroom bathtub & faucet, replace tile all in same location. | $18,000 |
| May 16, 2019 | Expired or cancelled expired Nov 2023 | 1551 Hyde St | Chiang C M Construction Inc. | seismic upgrade to comply soft-story retrofit per sfebc chapter 4d, 2016 cebc appendix a4Details
seismic upgrade to comply soft-story retrofit per sfebc chapter 4d, 2016 cebc appendix a4 | $18,800 |
| May 24, 2018 | Completed final sign-off Jan 2019 | 801 Geary St | Chiang C M Construction Inc. | soft demo only to (e) basement and first floor tenant space.originally a massage business per abo-17. no demolition for structured elements, no electrical and plumbing work. no demo for fire sprinkler.Details
soft demo only to (e) basement and first floor tenant space.originally a massage business per abo-17. no demolition for structured elements, no electrical and plumbing work. no demo for fire sprinkler. | $3,000 |
| May 11, 2018 | Never finaled issued Jan 2020, no final | 821 Jackson St | Chiang C M Construction Inc. | relocate existing gas meters, & construct a meter cabinet at street spaceDetails
relocate existing gas meters, & construct a meter cabinet at street space | $20,000 |
| Apr 2, 2018 | Completed final sign-off Jan 2019 | 37 Waverly Pl | Chiang C M Construction Inc. | to comply with notice of violation 201768884. fire damge repair of floors, walls, & ceilings in kitchen, bathrooms, bedrooms, and stirways. reinstall kitchen cabinets, electrical and plumbing work. no structural damage and no structural work. all repair to be in-kind.Details
to comply with notice of violation 201768884. fire damge repair of floors, walls, & ceilings in kitchen, bathrooms, bedrooms, and stirways. reinstall kitchen cabinets, electrical and plumbing work. no structural damage and no structural work. all repair to be in-kind. | $68,500 |
| Mar 23, 2018 | Never finaled issued Sep 2019, no final | 600 41st Av | Chiang C M Construction Inc., Kong Lai Construction | add units per ord #162-16. in 1st floor: convert existing garage space to have 2 adu unts per ord 162-16.Details
add units per ord #162-16. in 1st floor: convert existing garage space to have 2 adu unts per ord 162-16. | $80,000 |
| Sep 13, 2017 | Expired or cancelled expired Jan 2025 | 600 41st Av | Chiang C M Construction Inc. | soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4Details
soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4 | $100,000 |
| Aug 11, 2017 | Completed final sign-off Apr 2018 | 41 Waverly Pl | Chiang C M Construction Inc. | 3rd fl: construct & renovate common bath & toilet on 3rd floor. new lighting, exhaust fan in remodeled area. sprinkler deferred; fire alarm deferred if required.Details
3rd fl: construct & renovate common bath & toilet on 3rd floor. new lighting, exhaust fan in remodeled area. sprinkler deferred; fire alarm deferred if required. | $35,000 |
| Aug 4, 2017 | Completed final sign-off Apr 2018 | 41 Waverly Pl | Chiang C M Construction Inc. | 3rd fl only: construct a temporary tenant relocation room for apt repair work. modify (e) heating duct to new temporary room. modify kitchen cabinets & sink in common kitchen. provide lighting, outlets. sprinkler modifications and fire alarm on separate permit.Details
3rd fl only: construct a temporary tenant relocation room for apt repair work. modify (e) heating duct to new temporary room. modify kitchen cabinets & sink in common kitchen. provide lighting, outlets. sprinkler modifications and fire alarm on separate permit. | $3,800 |
| Jun 30, 2017 | Expired or cancelled expired Oct 2025 | 1250 Hyde St | Chiang C M Construction Inc. | expand (e) garage opening from 8'-0" to 10'-0" expand (e) garage & second floor via partial lightwell infillDetails
expand (e) garage opening from 8'-0" to 10'-0" expand (e) garage & second floor via partial lightwell infill | $20,000 |
| Feb 24, 2017 | Completed final sign-off Feb 2022 | 1250 Hyde St | Chiang C M Construction Inc. | soft story retrofit to comply with sfbc chapter 34b based on iebc 2012 appx a4 calcsDetails
soft story retrofit to comply with sfbc chapter 34b based on iebc 2012 appx a4 calcs | $60,000 |
| Dec 22, 2016 | Never finaled issued Dec 2020, no final | 322 30th Av | Chiang C M Construction Inc. | convert storage space into (1) adu for a total of 7 units. (n) unit to be 2 bdrm, 1 bath. (n) unit under ordinance 162-16. refer to pa #2016-1104-2016 for soft story retrofit.Details
convert storage space into (1) adu for a total of 7 units. (n) unit to be 2 bdrm, 1 bath. (n) unit under ordinance 162-16. refer to pa #2016-1104-2016 for soft story retrofit. | $20,000 |
| Oct 28, 2016 | Completed final sign-off Oct 2017 | 631 Grant Av | Chiang C M Construction Inc. | repair wall stucco dry rock inside of existing dumbwaiter shaft.Details
repair wall stucco dry rock inside of existing dumbwaiter shaft. | $1,000 |
| Oct 25, 2016 | Completed final sign-off Apr 2018 | 41 Waverly Pl | Chiang C M Construction Inc. | construct & renovate common bath & toilets on the 4th floor. new lighting, exhaust fans at remodel area.Details
construct & renovate common bath & toilets on the 4th floor. new lighting, exhaust fans at remodel area. | $20,000 |
| Oct 18, 2016 | Completed final sign-off Aug 2017 | 1234 Divisadero St | Chiang C M Construction Inc. | project proposes new non structural wall and door within e officeDetails
project proposes new non structural wall and door within e office | $30,000 |
| Sep 1, 2016 | Never finaled issued Sep 2016, no final | 1650 Mission St | Chiang C M Construction Inc. | revision to app#201510079157. change location of fuel port.Details
revision to app#201510079157. change location of fuel port. | |
| Jun 24, 2016 | Never finaled issued Jun 2016, no final | 743 20th Av | Chiang C M Construction Inc. | repair building hardee board sing to south side of building. repair/replace in-kind near rear. not visiable from street.Details
repair building hardee board sing to south side of building. repair/replace in-kind near rear. not visiable from street. | $2,500 |
| Feb 24, 2016 | Completed final sign-off Jul 2016 | 133 Waverly Pl | Chiang C M Construction Inc. | replace restroom wood door. remove restroom non structural bearing partition wall. install new ceramic tile. paint restroom.Details
replace restroom wood door. remove restroom non structural bearing partition wall. install new ceramic tile. paint restroom. | $2,000 |
| Oct 7, 2015 | Completed final sign-off Aug 2017 | 1650 Mission St | Chiang C M Construction Inc. | installation of emergency generator & fuel tank, 4 hour rated enclosure, vestibule, exhaust duct to roof.maher ordinance - extended ordinance no.155-13 not requiredDetails
installation of emergency generator & fuel tank, 4 hour rated enclosure, vestibule, exhaust duct to roof.maher ordinance - extended ordinance no.155-13 not required | |
| Apr 3, 2015 | Never finaled issued May 2015, no final | 100 Larkin St | Chiang C M Construction Inc. | interior signage upgrade maher - not req'dDetails
interior signage upgrade maher - not req'd | $95,000 |
| Mar 3, 2015 | Completed final sign-off Mar 2015 | 2315 Mission St | Chiang C M Construction Inc. | comply with nov 201523241 - repair dryrot wood at rear stairwell, at the had rials and some loose deck boards on the 2nd level landing and at the bottom treads. less than 15% stair replace. repair and change window panel and hardware. check smoke detectors. repair ceiling panelsDetails
comply with nov 201523241 - repair dryrot wood at rear stairwell, at the had rials and some loose deck boards on the 2nd level landing and at the bottom treads. less than 15% stair replace. repair and change window panel and hardware. check smoke detectors. repair ceiling panels | $1,000 |
| Dec 31, 2014 | Completed final sign-off Mar 2015 | 555 Hyde St | Chiang C M Construction Inc. | to comply with nov# 20140558. in kind repair back stairway to comply with sf housing code. less than 50% stair replace vent pipe in back stairwell.Details
to comply with nov# 20140558. in kind repair back stairway to comply with sf housing code. less than 50% stair replace vent pipe in back stairwell. | $2,000 |
| Oct 21, 2014 | Completed final sign-off May 2015 | 733 Kearny St | Chiang C M Construction Inc. | revision to ap #2013.1127.2982 - revisions include additional grade beam rebar, landscape wall layout, downspouts, access panel locations. n/a maher ordinanceDetails
revision to ap #2013.1127.2982 - revisions include additional grade beam rebar, landscape wall layout, downspouts, access panel locations. n/a maher ordinance | $5,000 |
| Jul 28, 2014 | Never finaled issued Sep 2014, no final | 821 Jackson St | Chiang C M Construction Inc. | 1)t.i. work on 1st floor and basement. 2)accessibel toilet and stairway. 3) front entry modification for accessible compliance. 4)new hvac and lighting.Details
1)t.i. work on 1st floor and basement. 2)accessibel toilet and stairway. 3) front entry modification for accessible compliance. 4)new hvac and lighting. | $275,600 |
| Jun 30, 2014 | Completed final sign-off Sep 2014 | 772 Commercial St | Chiang C M Construction Inc. | 2nd floor unit: to comply with n.o.v. # 201474753. remove (3) existing windows to change back to original wood double hung windows sash and paint. remove two exhaust termination vent.Details
2nd floor unit: to comply with n.o.v. # 201474753. remove (3) existing windows to change back to original wood double hung windows sash and paint. remove two exhaust termination vent. | $1,000 |
| Jan 23, 2014 | Completed final sign-off Apr 2015 | 1650 Mission St | Chiang C M Construction Inc. | #312- t.i. (e) office space, demo 1 office/partition to form (n) reception area, (n) wall/door for 2 new offices, move door & patch old door location, (n) window/door for meeting room, remove carpet/base. elec, restroom, drinking fountain & parking area upgrade, new sign as needed.Details
#312- t.i. (e) office space, demo 1 office/partition to form (n) reception area, (n) wall/door for 2 new offices, move door & patch old door location, (n) window/door for meeting room, remove carpet/base. elec, restroom, drinking fountain & parking area upgrade, new sign as needed. | $124,696 |
| Jan 10, 2014 | Completed final sign-off Mar 2014 | 39 Fell St | Chiang C M Construction Inc. | continue application 201207235456. add non bearing partitions on 2nd fl office space for tenant improvement. compliance with ordinance #155-13 not required. excavation <50 cu yd.Details
continue application 201207235456. add non bearing partitions on 2nd fl office space for tenant improvement. compliance with ordinance #155-13 not required. excavation <50 cu yd. | $45,000 |
| Dec 20, 2013 | Completed final sign-off Feb 2014 | 39 Fell St | Chiang C M Construction Inc. | alteration extg hvac system for 2nd floor. bldg app#201212246797. compliance with ordinance no. 155-13 not required.Details
alteration extg hvac system for 2nd floor. bldg app#201212246797. compliance with ordinance no. 155-13 not required. | $15,000 |
| Jan 9, 2013 | Completed final sign-off Aug 2013 | 1750 Mcallister St | Chiang C M Construction Inc. | revision to 200909217316. minor revision to site retaining wall for site exposed condition.Details
revision to 200909217316. minor revision to site retaining wall for site exposed condition. | |
| Nov 2, 2012 | Completed final sign-off Aug 2017 | 1234 Divisadero St | Chiang C M Construction Inc. | repair and replace 1'x10' curve exterior wood siding in the front of building to match existing. all work in kind.Details
repair and replace 1'x10' curve exterior wood siding in the front of building to match existing. all work in kind. | $12,500 |
| Oct 24, 2012 | Never finaled issued Nov 2012, no final | 445 Grant Av | Chiang C M Construction Inc. | construction of new i.t. room about 136 sq ft, non structural tenant improvement. interior walls, ceilings, door flooring.Details
construction of new i.t. room about 136 sq ft, non structural tenant improvement. interior walls, ceilings, door flooring. | $11,000 |
| Oct 24, 2012 | Completed final sign-off Jan 2013 | 827 Pacific Av | Chiang C M Construction Inc. | fire dept approval of emergency evacuation signs (5). only ref app#201008309805.Details
fire dept approval of emergency evacuation signs (5). only ref app#201008309805. | $3,000 |
| Aug 28, 2012 | Completed final sign-off Jun 2014 | 827 Pacific Av | Chiang C M Construction Inc. | revision to bpa#2012-0326-6881 & 201008309805. a change from wood stairs to metal stairs, as constructed. prior permits show wood stairsDetails
revision to bpa#2012-0326-6881 & 201008309805. a change from wood stairs to metal stairs, as constructed. prior permits show wood stairs | |
| May 3, 2012 | Completed final sign-off May 2012 | 291 10th St | Chiang C M Construction Inc. | change 9 (e) damage window with aluminum window at light well, not visable from street, 5' from property line.Details
change 9 (e) damage window with aluminum window at light well, not visable from street, 5' from property line. | $7,500 |
| Mar 26, 2012 | Completed final sign-off Dec 2012 | 827 Pacific Av | Chiang C M Construction Inc. | revision to 2010-08-30-9805. revision to foundation & exterior wall seismic & structural strenethening. modification/relocation of interior partitions. construction of interior partitions, hvac, mep on 2nd floor.Details
revision to 2010-08-30-9805. revision to foundation & exterior wall seismic & structural strenethening. modification/relocation of interior partitions. construction of interior partitions, hvac, mep on 2nd floor. | $760,000 |
| Sep 8, 2011 | Completed final sign-off Jul 2012 | 550 Leavenworth St | Chiang C M Construction Inc. | revision to appl #201106107848: proposes additional repair work throughout bldg includes interior work in kitchens, bathrooms, closets & bedrooms in apartment units. additoinal plbg, elec, lighting & mech work to be design/build under separate permit.Details
revision to appl #201106107848: proposes additional repair work throughout bldg includes interior work in kitchens, bathrooms, closets & bedrooms in apartment units. additoinal plbg, elec, lighting & mech work to be design/build under separate permit. | $30,000 |
| Jun 20, 2011 | Completed final sign-off Jun 2012 | 827 Pacific Av | Chiang C M Construction Inc. | interior demo of non struc walls and ceiling, and limited work of hazardous material ( asbestos and lead paint) abatement. ab-017. pa# 2010.08.30.9805 for change of use is currently under reviewDetails
interior demo of non struc walls and ceiling, and limited work of hazardous material ( asbestos and lead paint) abatement. ab-017. pa# 2010.08.30.9805 for change of use is currently under review | $50,000 |
| Jun 10, 2011 | Completed final sign-off Jun 2012 | 550 Leavenworth St | Chiang C M Construction Inc. | fire damage repair incl. common area, facades, window replacement, plumbing, light fixture, partial roof, replace smoke detectors. fire alarm and sprinkler under separate permit, replace windows, drywall, plumbing,light fixts. & partial roof, fire alarm & sprinkler under separate permit.Details
fire damage repair incl. common area, facades, window replacement, plumbing, light fixture, partial roof, replace smoke detectors. fire alarm and sprinkler under separate permit, replace windows, drywall, plumbing,light fixts. & partial roof, fire alarm & sprinkler under separate permit. | $425,000 |
| Apr 8, 2011 | Expired or cancelled expired May 2024 | 1206 15th Av | Chiang C M Construction Inc. | clarification of height (as measured from curb) based on approved plans & site permit. refer to appl.#2006-0511-1391.Details
clarification of height (as measured from curb) based on approved plans & site permit. refer to appl.#2006-0511-1391. | |
| Sep 15, 2010 | Completed final sign-off Feb 2012 | 4800 03rd St | Chiang C M Construction Inc. | 1st time tenant improvement, existing retail space, e underground plumbing and slab, e stub ducting for type 1 hood. space to be converted into full service restaurant, new partition walls, new toilets, new kitchen & dining area. chang of occupancy from b-retail to an a occupancy restaurantDetails
1st time tenant improvement, existing retail space, e underground plumbing and slab, e stub ducting for type 1 hood. space to be converted into full service restaurant, new partition walls, new toilets, new kitchen & dining area. chang of occupancy from b-retail to an a occupancy restaurant | $387,500 |
| Aug 30, 2010 | Completed final sign-off Dec 2012 | 827 Pacific Av | Chiang C M Construction Inc. | renovate exist 2 stories& bsmt commercial bldg for offices & storage. seismic upgrade (foundation & structure). mechanical & electrical systems, compliance with ada by building new front entry, stairs, elevator and bathrooms.Details
renovate exist 2 stories& bsmt commercial bldg for offices & storage. seismic upgrade (foundation & structure). mechanical & electrical systems, compliance with ada by building new front entry, stairs, elevator and bathrooms. | $1,740,000 |
| Apr 19, 2010 | Completed final sign-off Apr 2011 | 42 Beaumont Av | Chiang C M Construction Inc. | to obtain final inspection for work approved under pa 200711158286; all work is completeDetails
to obtain final inspection for work approved under pa 200711158286; all work is complete | |
| Sep 21, 2009 | Completed final sign-off Aug 2013 | 1750 Mcallister St | Chiang C M Construction Inc. | site retaining wall replacement at rear proeprty line (total length = 170' long - 10' high).Details
site retaining wall replacement at rear proeprty line (total length = 170' long - 10' high). | $210,000 |
| Sep 2, 2009 | Completed final sign-off Jul 2013 | 5735 Mission St | Chiang C M Construction Inc. | add to (e) 2 story building converting it to a 3 story senior care home, 1st floor has: multipurpose room, offices, kitchen, h.c. toilets, elevator & machine rooms. 2nd floor has 11 double occupancy bedrooms with bedrooms & staff room.lounge area. 3rd floor has double occupancy bedroom, bathDetails
add to (e) 2 story building converting it to a 3 story senior care home, 1st floor has: multipurpose room, offices, kitchen, h.c. toilets, elevator & machine rooms. 2nd floor has 11 double occupancy bedrooms with bedrooms & staff room.lounge area. 3rd floor has double occupancy bedroom, bath | $1,500,000 |
| Dec 23, 2008 | Completed final sign-off Apr 2009 | 1351 24th Av | Chiang C M Construction Inc. | to obtain final inspection for work approved under pa 200502155564, all work is completeDetails
to obtain final inspection for work approved under pa 200502155564, all work is complete | |
| Dec 10, 2008 | Completed final sign-off Mar 2009 | 1 South Van Ness Av | Chiang C M Construction Inc. | interior demolition of partition walls, finishes, fixtures, and equipment on 6th fl, and partial basement enant space, to comply w/ ab-017. ref pa #200807146652.Details
interior demolition of partition walls, finishes, fixtures, and equipment on 6th fl, and partial basement enant space, to comply w/ ab-017. ref pa #200807146652. | $22,989 |
| Jun 16, 2008 | Completed final sign-off Apr 2009 | 1351 24th Av | Chiang C M Construction Inc. | revision to application 2005021155564-r-1. exterior: add new ada ramp. interior: modify toilet layout, new counter, opening to registration, new partitions at 2nd floor. (barrier removal work).Details
revision to application 2005021155564-r-1. exterior: add new ada ramp. interior: modify toilet layout, new counter, opening to registration, new partitions at 2nd floor. (barrier removal work). | $72,250 |
| Aug 14, 2006 | Completed final sign-off Oct 2006 | 138 06th St | Chiang C M Construction Inc. | for final inspection pa#200406297634.Details
for final inspection pa#200406297634. | |
| Aug 14, 2006 | Completed final sign-off Oct 2006 | 132 06th St | Chiang C M Construction Inc. | for final inspection pa#200406297634.Details
for final inspection pa#200406297634. | |
| Jan 23, 2006 | Completed final sign-off Oct 2006 | 132 06th St | Chiang C M Construction Inc. | to reconnect existing fire service to new copper line with ts fabrication flange revision to 200406297625Details
to reconnect existing fire service to new copper line with ts fabrication flange revision to 200406297625 | |
| Jun 9, 2005 | Completed final sign-off Jun 2005 | 56 Julian Av | Chiang C M Construction Inc. | renew 200411159148, 200410257666, 200408050776, 200309185134Details
renew 200411159148, 200410257666, 200408050776, 200309185134 | |
| Jun 29, 2004 | Expired or cancelled expired Mar 2007 | 138 06th St | Chiang C M Construction Inc. | concrete retaining wall under sidewalkDetails
concrete retaining wall under sidewalk | $35,000 |
| Jun 29, 2004 | Expired or cancelled expired Mar 2007 | 132 06th St | Chiang C M Construction Inc. | construction concrete retaining wallDetails
construction concrete retaining wall | $25,000 |
| Dec 30, 2003 | Never finaled issued Dec 2003, no final | 1235 Mission St | Chiang C M Construction Inc. | for final inspection only of app#200009190985Details
for final inspection only of app#200009190985 | |
| Dec 30, 2003 | Never finaled issued Dec 2003, no final | 1235 Mission St | Chiang C M Construction Inc. | for final inspection only of app#9804940,9812566,9926921Details
for final inspection only of app#9804940,9812566,9926921 | |
| Sep 12, 2003 | Expired or cancelled expired Oct 2005 | 878 Jamestown Av | Chiang C M Construction Inc. | extend proposed retainig wall down by 3' - 0", rev. to pa#2003/04/08/1738 permit #998526Details
extend proposed retainig wall down by 3' - 0", rev. to pa#2003/04/08/1738 permit #998526 | $1,500 |