Robert Antonio Razzo
- Listed as
- architect
- Firm
- R Razzo Architect
- Based in
- Sf
- On San Francisco permits
- Jul 2024 to May 2026
7 permits since 2000 (architect on 7 permits): 3 completed, 4 in progress.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 12, 2026 | In progress issued May 2026 | 11 Mars St | Umlaut Interiors Llc | revision to permit 202502180547 at existing 3rd floor balcony. add new tempered glass guard rail and ancillary wood rail.Details
revision to permit 202502180547 at existing 3rd floor balcony. add new tempered glass guard rail and ancillary wood rail. | $3,000 |
| Oct 31, 2025 | Completed final sign-off Sep 2026 | 11 Mars St | Umlaut Interiors Llc | revision to pa # 2024-1115-5113: at (e) 3rd fl door/window openings, remove and replace (e) structural posts & beams with new. replace (e) roof-supporting beam. replace (e) window headers. alter ceiling framing to accomodate new kitchen vent- see structural drawingsDetails
revision to pa # 2024-1115-5113: at (e) 3rd fl door/window openings, remove and replace (e) structural posts & beams with new. replace (e) roof-supporting beam. replace (e) window headers. alter ceiling framing to accomodate new kitchen vent- see structural drawings | $4,200 |
| Jun 20, 2025 | Completed final sign-off Jun 2026 | 22 Gennessee St | revision pa # 202407186837 1st fl: bedroom/study- remove (e) window & wall framing. reframe wall and install new replacement window. 2nd fl: kitchen/stair- apply two layers 5/8 type x gwb to north wallDetails
revision pa # 202407186837 1st fl: bedroom/study- remove (e) window & wall framing. reframe wall and install new replacement window. 2nd fl: kitchen/stair- apply two layers 5/8 type x gwb to north wall | ||
| Jun 12, 2025 | In progress issued Feb 2026 | 2667 22nd Av | 1st floor - selected demolition of existing walls, interior and exterior doors, windows and ceilings at rear of first door. remodeling of existing space to include replacment bathroom, new walls, doors, ceilings, lighting, plumbing. new exterior windows and doors including new structural work.Details
1st floor - selected demolition of existing walls, interior and exterior doors, windows and ceilings at rear of first door. remodeling of existing space to include replacment bathroom, new walls, doors, ceilings, lighting, plumbing. new exterior windows and doors including new structural work. | $142,530 | |
| Mar 13, 2025 | In progress filed Mar 2025, not yet issued | 530 18th Av | adding a ground floor living unit. demolish existing exterior stairway and selected doors. remove portions of existing floor slabs in preparation for new replacement slab. remove and replace existing garage door, construct new bathroom and kitchen, install new partitions, fire-rated walls and new doDetails
adding a ground floor living unit. demolish existing exterior stairway and selected doors. remove portions of existing floor slabs in preparation for new replacement slab. remove and replace existing garage door, construct new bathroom and kitchen, install new partitions, fire-rated walls and new do | $181,971 | |
| Mar 11, 2025 | Completed final sign-off Aug 2025 | 281 Turk St | Golden Vector Stars Corporation | ground floor- ti (e) 1386sf institutional community use to create 3 private offices. reconfgiure staff break area and improve ventitation. modify (e) disabled access features to enchance accessibility. continuatin of (e) use with no change in use or occupancy. no chamges to facade, except toDetails
ground floor- ti (e) 1386sf institutional community use to create 3 private offices. reconfgiure staff break area and improve ventitation. modify (e) disabled access features to enchance accessibility. continuatin of (e) use with no change in use or occupancy. no chamges to facade, except to | $45,000 |
| Jul 18, 2024 | In progress issued Oct 2024 | 22 Gennessee St | Alvarado & Son Construction Inc | demolish portions of g/f and 2/f. construct new small closet addition at 2/f entry. interior work includes new walls, doors, windows. relocate stairway, new kitchen, upgrade bathrooms, add new skylights. install new hvac and water heater. expand g/f primary suite.Details
demolish portions of g/f and 2/f. construct new small closet addition at 2/f entry. interior work includes new walls, doors, windows. relocate stairway, new kitchen, upgrade bathrooms, add new skylights. install new hvac and water heater. expand g/f primary suite. | $267,350 |