Paul Ferbrache
- Listed as
- engineer
- Firm
- South Coast Engineering Group
- Based in
- Calabasas
- On San Francisco permits
- Mar 2018 to Dec 2023
11 permits since 2000 (engineer on 11 permits): 6 completed, 1 in progress, 2 never finaled, 2 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 5, 2023 | In progress filed Dec 2023, not yet issued | 333 Battery St | revision to permit 202306230780. relocation of new mechanical unit mua-1 to basement level a, new fsds and reconfiguration of ductwork associated w/ the relocation. added new condensing unit cu-2. revisions to exhaust duct velocity schedule on sheet m0.2. ref permit 202309146603Details
revision to permit 202306230780. relocation of new mechanical unit mua-1 to basement level a, new fsds and reconfiguration of ductwork associated w/ the relocation. added new condensing unit cu-2. revisions to exhaust duct velocity schedule on sheet m0.2. ref permit 202309146603 | ||
| Jun 6, 2023 | Completed final sign-off Apr 2024 | 333 Battery St | Centric Construction Inc | basement: conversion of (e) back of house space to new offices/changing rooms, new partitions, finishes & lightingDetails
basement: conversion of (e) back of house space to new offices/changing rooms, new partitions, finishes & lighting | $20,000 |
| May 2, 2023 | Completed final sign-off May 2024 | 333 Battery St | Centric Construction Inc | basement l/a, l/1 and l/2: scope includes new wine storage condensing unit on basement level a, renovation of (e) restaurant and bar on l/1, new partitions, finishes, and lighting, new kitchen with new partitions, finishes, lighting, & equipment. new boh restaurant prep area on l/2.Details
basement l/a, l/1 and l/2: scope includes new wine storage condensing unit on basement level a, renovation of (e) restaurant and bar on l/1, new partitions, finishes, and lighting, new kitchen with new partitions, finishes, lighting, & equipment. new boh restaurant prep area on l/2. | $1,000,000 |
| Dec 13, 2022 | Completed final sign-off Dec 2023 | 333 Battery St | Centric Construction Inc | the project scope include: level 3. renovation of (e) public restrooms, renovation of (e) restaurant and bar, (n) reception louge and coffee bar. renovation of (e) outdoor patio with (n) outdoor bar, concrete planter, trellis.Details
the project scope include: level 3. renovation of (e) public restrooms, renovation of (e) restaurant and bar, (n) reception louge and coffee bar. renovation of (e) outdoor patio with (n) outdoor bar, concrete planter, trellis. | $1,775,000 |
| May 27, 2022 | Never finaled filed May 2022, never issued | 5 Embarcadero Center | addition of 30 guestrooms to the existing hotel by establishing 2 new guestrooms per floor on floor 2-17 via the conversion of 2 areas on either side of the elevator. total guestroom count after construction will be 851. scope includes (n) entry door, walls, lighting and finishes. replace (e)windowsDetails
addition of 30 guestrooms to the existing hotel by establishing 2 new guestrooms per floor on floor 2-17 via the conversion of 2 areas on either side of the elevator. total guestroom count after construction will be 851. scope includes (n) entry door, walls, lighting and finishes. replace (e)windows | $1,100,000 | |
| Jan 22, 2021 | Completed final sign-off Apr 2021 | 335 Powell St | Trainor Commercial Construction Inc. | rev pa 202008292929: food service equip rev to electrical per food service equip, rev to hood assemby details on arch and mech drawings, mnor rev to interior elevations.Details
rev pa 202008292929: food service equip rev to electrical per food service equip, rev to hood assemby details on arch and mech drawings, mnor rev to interior elevations. | |
| Mar 14, 2019 | Expired or cancelled withdrawn Oct 2019 | 747 Market St | deferred mechanical submittal associated with ti pa# 2019/02/27/3938.Details
deferred mechanical submittal associated with ti pa# 2019/02/27/3938. | $50,000 | |
| Jul 19, 2018 | Completed final sign-off Apr 2020 | 55 04th St | Hathaway Dinwiddie Co. | renovate non-accessible guestrooms on 4th & 5th fl. includes n finishes & fixtures, tub to shower conversion, n illuminated mirror, hvac & lighting e to remain. two n outlets. renovate to e corridors including new finishes only. only ffe sconces are replaced in kind. all other lighting e to remain.Details
renovate non-accessible guestrooms on 4th & 5th fl. includes n finishes & fixtures, tub to shower conversion, n illuminated mirror, hvac & lighting e to remain. two n outlets. renovate to e corridors including new finishes only. only ffe sconces are replaced in kind. all other lighting e to remain. | $825,000 |
| May 17, 2018 | Expired or cancelled withdrawn Feb 2019 | 2620 Jones St | lobby: demo staff offices/restrms, kitch, market, dining area, confer rm. construt staff offi/restrms, kitch & sales office/gallery. renov/upgrade public restrms. garage a&b: demo storage, boh, mech rm, restrm. const boh office, storage, break rm, laundry, restrm, add 2 exit to e stairwells. replaceDetails
lobby: demo staff offices/restrms, kitch, market, dining area, confer rm. construt staff offi/restrms, kitch & sales office/gallery. renov/upgrade public restrms. garage a&b: demo storage, boh, mech rm, restrm. const boh office, storage, break rm, laundry, restrm, add 2 exit to e stairwells. replace | $800,000 | |
| May 17, 2018 | Never finaled issued Dec 2018, no final | 2620 Jones St | Smc Constracting Inc | corridors: remove & replace e wall sconces & recessed light fixtures in (e) soffits. guestrms: demo e entry door & hardware. install secondary acoustical window at bay st side rms. convert 1 typical guestroom to acces. suite. elec/linen closets: patch & repair e opening in 1hr & 2hr fire rated wallsDetails
corridors: remove & replace e wall sconces & recessed light fixtures in (e) soffits. guestrms: demo e entry door & hardware. install secondary acoustical window at bay st side rms. convert 1 typical guestroom to acces. suite. elec/linen closets: patch & repair e opening in 1hr & 2hr fire rated walls | $650,000 |
| Mar 15, 2018 | Completed final sign-off Sep 2019 | 180 Sansome St | Crane Construction Company Inc. | grnd flr & mezzanine - new fitness club. new fixtures, finishes, equipment, bathrooms, kitchenette, mep. no exterior work. fire protections under sep permit maher naDetails
grnd flr & mezzanine - new fitness club. new fixtures, finishes, equipment, bathrooms, kitchenette, mep. no exterior work. fire protections under sep permit maher na | $900,000 |