Paul Belotti
- Listed as
- architect, engineer
- Firm
- Paul Belotti Architect
- On San Francisco permits
- Oct 2010 to Mar 2025
16 permits since 2000 (architect on 15 permits, engineer on 1 permit): 11 completed, 1 in progress, 3 never finaled, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 27, 2025 | In progress issued May 2025 | 332 Douglass St | Kieran Collins Construction | renovation of roughly 940 conditioned sf. remodel of kitchen; 2 full batthrooms, (e) staircase; adding (1) half bath & stair to garage; all new like for like windows; converting (e) living room into a bedroom; work room in garageDetails
renovation of roughly 940 conditioned sf. remodel of kitchen; 2 full batthrooms, (e) staircase; adding (1) half bath & stair to garage; all new like for like windows; converting (e) living room into a bedroom; work room in garage | $520,000 |
| Dec 14, 2022 | Completed final sign-off Apr 2026 | 354 Douglass St | G&C Construction Services Inc. | this project involves a 44 sf addition (26 sf "fill-in" on the main fl and a 18 sf lightwell infill on the 2/f). roughly, 1100 sf interior remodel. 180 sf 30" rear deck like for like wood window replacement, widen garage door to 8'.Details
this project involves a 44 sf addition (26 sf "fill-in" on the main fl and a 18 sf lightwell infill on the 2/f). roughly, 1100 sf interior remodel. 180 sf 30" rear deck like for like wood window replacement, widen garage door to 8'. | $410,000 |
| Feb 8, 2019 | Expired or cancelled cancelled Jan 2026 | 1901 California St | replacement of e non structural stair on grade work includes. demo concrete, metal rebar, and guardrailDetails
replacement of e non structural stair on grade work includes. demo concrete, metal rebar, and guardrail | $9,500 | |
| Jun 5, 2017 | Completed final sign-off May 2018 | 1714 08th Av | Quick Connect Electric Co | finish (e) rough plumbed bathroom, remove stair and turn into office, add 47 sq.ft. on 2/f & 3/f for a total of 94 s.f. addition in lightwell, remodel 2 baths on 3/f and add laundry on 2/f, provide exterior staircase.Details
finish (e) rough plumbed bathroom, remove stair and turn into office, add 47 sq.ft. on 2/f & 3/f for a total of 94 s.f. addition in lightwell, remodel 2 baths on 3/f and add laundry on 2/f, provide exterior staircase. | $164,000 |
| Jun 28, 2016 | Completed final sign-off Nov 2016 | 1330 Waller St | Cal - Bay Craftsmen Inc | for administrative use - detail of patio rebar & footing for future work ref - 2014-0212-8421.Details
for administrative use - detail of patio rebar & footing for future work ref - 2014-0212-8421. | |
| Jun 19, 2015 | Never finaled issued Mar 2016, no final | 246 Corbett Av | Cal - Bay Craftsmen Inc, Andrew Mark Construction Inc | complete interior renovation & remodel of (e) dwelling work to include: concrete work, framing, plumbing, electrical, hvac, carpentry & painting.Details
complete interior renovation & remodel of (e) dwelling work to include: concrete work, framing, plumbing, electrical, hvac, carpentry & painting. | $268,000 |
| Mar 25, 2015 | Completed final sign-off Jan 2017 | 389 27th St | Cal - Bay Craftsmen Inc, Capomastro Group:Acalifornia Corp. | 3rd floor addition (80 sf) to existing master bedroom.Details
3rd floor addition (80 sf) to existing master bedroom. | $20,000 |
| Feb 24, 2015 | Completed final sign-off Sep 2016 | 389 27th St | Cal - Bay Craftsmen Inc, Capomastro Group:Acalifornia Corp. | renovation and repairs due to poor construction on previous remodel of (e) dwelling. work proposed: new parapet, flashing, water damage repair, exterior siding, re-install windows, roofing, painting, elec & plumbingDetails
renovation and repairs due to poor construction on previous remodel of (e) dwelling. work proposed: new parapet, flashing, water damage repair, exterior siding, re-install windows, roofing, painting, elec & plumbing | $70,000 |
| Jul 24, 2014 | Never finaled issued Sep 2014, no final | 1330 Waller St | Cal - Bay Craftsmen Inc | modification of ext 3 unit bldg from 2 extg units on floor 2 and 1 unit on floor 3 to 1 unit on ground floor and one unit on floor 2 and one unit on floor 3.Details
modification of ext 3 unit bldg from 2 extg units on floor 2 and 1 unit on floor 3 to 1 unit on ground floor and one unit on floor 2 and one unit on floor 3. | $22,000 |
| Jun 12, 2014 | Completed final sign-off Jun 2015 | 121 States St | The Sustainable Cbo Inc Dba Oliver Macki | renovation of 452 sq.ft. office and storage into home office space. relocation of (e) wash & dry. expand (e) deck @ 18th above grade.Details
renovation of 452 sq.ft. office and storage into home office space. relocation of (e) wash & dry. expand (e) deck @ 18th above grade. | $65,000 |
| Feb 12, 2014 | Never finaled issued Feb 2014, no final | 1330 Waller St | Cal - Bay Craftsmen Inc | revision to appl #2013.09.04.5958 - lower existing floor in rear section, modify wall location at family room/garage location.Details
revision to appl #2013.09.04.5958 - lower existing floor in rear section, modify wall location at family room/garage location. | $10,000 |
| Sep 4, 2013 | Completed final sign-off Nov 2016 | 1330 Waller St | Cal - Bay Craftsmen Inc | renovation & remodel of (e) garage into 2 car garage , storage & tv/family room & new bath, includes renovation of wash/dry area. infill ground floor lightwells (2 total).Details
renovation & remodel of (e) garage into 2 car garage , storage & tv/family room & new bath, includes renovation of wash/dry area. infill ground floor lightwells (2 total). | $130,000 |
| Aug 31, 2012 | Completed final sign-off May 2013 | 121 States St | comply with nov# 201195668 (ces)-addition & renovation to an (e) deck & stairsDetails
comply with nov# 201195668 (ces)-addition & renovation to an (e) deck & stairs | $15,000 | |
| Sep 15, 2011 | Completed final sign-off Aug 2012 | 93 Carmel St | Cal - Bay Craftsmen Inc | renovate & remodel (e) residence, expand garage & laundry room in lower level. 27 sf addition to main level & remodeled kitchen & bath, renovate (e) bedrooms, remodel (e) master bath & add one new bathroom on top floor.Details
renovate & remodel (e) residence, expand garage & laundry room in lower level. 27 sf addition to main level & remodeled kitchen & bath, renovate (e) bedrooms, remodel (e) master bath & add one new bathroom on top floor. | $380,000 |
| Aug 10, 2011 | Completed final sign-off May 2012 | 1750 Taylor St | Cal - Bay Craftsmen Inc | 13th floor floor #1303 - remodel of existing condo including remodel bathrooms, replace (e) glazing, new electrical, plumbing, mech, cabinets & finishes.Details
13th floor floor #1303 - remodel of existing condo including remodel bathrooms, replace (e) glazing, new electrical, plumbing, mech, cabinets & finishes. | $300,000 |
| Oct 18, 2010 | Completed final sign-off Mar 2012 | 1188 Lombard St | Cal - Bay Craftsmen Inc | minor renovation of (e) residence. new windows, 2 new rooftop terraces, remodeled mater bath, new kitchen appliances, new kit counter top and splash, interior painting, lighting in master bath bedroom.Details
minor renovation of (e) residence. new windows, 2 new rooftop terraces, remodeled mater bath, new kitchen appliances, new kit counter top and splash, interior painting, lighting in master bath bedroom. | $90,000 |