Oscar Lescano
- Listed as
- authorized agent-others, contractor
- Firm
- L E C A Construction Llc
- Based in
- San Mateo
- On San Francisco permits
- Dec 2012 to Jun 2026
44 permits since 2000 (contractor on 44 permits, authorized agent-others on 1 permit): 33 completed, 6 in progress, 3 never finaled, 2 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. Their ranked record as a contractor is on their contractor page. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 5, 2026 | In progress issued Sep 2026 | 906 Broadway | L E C A Construction Llc | conditional use authorization per 2024-002799prj, converting a vacant church from an institutional use to event space. cou to general entertainment. scope includes removal of (e) non conforming rr at rear yard, add of n rrs in basement remoce e stair from rear yard to basement, add n int stairDetails
conditional use authorization per 2024-002799prj, converting a vacant church from an institutional use to event space. cou to general entertainment. scope includes removal of (e) non conforming rr at rear yard, add of n rrs in basement remoce e stair from rear yard to basement, add n int stair | $220,000 |
| May 28, 2026 | In progress issued Jun 2026 | 943 South Van Ness Av | L E C A Construction Llc | replacing 4 bedroom windows to meet sill ht & eero requipments. window sizes and materials to match similar existing windows on 3rd floor.Details
replacing 4 bedroom windows to meet sill ht & eero requipments. window sizes and materials to match similar existing windows on 3rd floor. | $18,000 |
| May 22, 2026 | In progress issued May 2026 | 943 South Van Ness Av | L E C A Construction Llc | multi family residence remodel/repair area 4675 sqft. includes exterior dryrot removal at marked areas, complete exterior repainting. removal of abandoned exterior electrical wiring/piping, low voltage.Details
multi family residence remodel/repair area 4675 sqft. includes exterior dryrot removal at marked areas, complete exterior repainting. removal of abandoned exterior electrical wiring/piping, low voltage. | $93,000 |
| Feb 12, 2026 | Completed final sign-off Mar 2026 | 1454 Union St | L E C A Construction Llc | to obtain final inspection for work approved under pa# 202211045954. all work is complete.Details
to obtain final inspection for work approved under pa# 202211045954. all work is complete. | |
| Feb 12, 2026 | Completed final sign-off Mar 2026 | 1454 Union St | L E C A Construction Llc | to obtain final inspection for work approved under pa# 202012171264. all work is complete.Details
to obtain final inspection for work approved under pa# 202012171264. all work is complete. | |
| Feb 12, 2026 | Completed final sign-off Mar 2026 | 1454 Union St | L E C A Construction Llc | to obtain final inspection for work approved under pa# 202009154231. all work is complete.Details
to obtain final inspection for work approved under pa# 202009154231. all work is complete. | |
| Feb 12, 2026 | Completed final sign-off Mar 2026 | 1454 Union St | L E C A Construction Llc | to obtain final inspection for work approved under pa# 202305238433. all work is complete.Details
to obtain final inspection for work approved under pa# 202305238433. all work is complete. | |
| Nov 14, 2025 | In progress issued Jul 2026 | 69 Sharon St | L E C A Construction Llc | interior remodel to include kitchen, bathroom, addition of a bathroom & bedroom. in kind replacements & hydronic heatDetails
interior remodel to include kitchen, bathroom, addition of a bathroom & bedroom. in kind replacements & hydronic heat | $60,000 |
| Oct 31, 2025 | In progress issued Jul 2026 | 67 Sharon St | L E C A Construction Llc | scope of work is an interor remodel to include kitchen, bathroom, and replace doors to rear yard and addition of 2 (n) skylights. windows replaced in kind. no change to front facade .Details
scope of work is an interor remodel to include kitchen, bathroom, and replace doors to rear yard and addition of 2 (n) skylights. windows replaced in kind. no change to front facade . | $65,000 |
| Oct 27, 2025 | In progress issued Jul 2026 | 71 Sharon St | L E C A Construction Llc | interior renovation to 71 sharon st including a kitchen remodel, bathroom addition, laundry room relocation, and expanded building envelope under (e) soffit. seismic strengthening at the ground floor.Details
interior renovation to 71 sharon st including a kitchen remodel, bathroom addition, laundry room relocation, and expanded building envelope under (e) soffit. seismic strengthening at the ground floor. | $64,000 |
| Aug 27, 2024 | Completed final sign-off May 2025 | 4350 Kirkham St | L E C A Construction Llc | window replacement(87 total) for top 3 levels of building. cutting 4-6 inch of stucco around (e) windows to repair. replace plywood as needed for dryrot. remove (e) stucco and replace on 48th side of building. using marvin essential brand windows like to like. same size, locations, max u-factor0.3.Details
window replacement(87 total) for top 3 levels of building. cutting 4-6 inch of stucco around (e) windows to repair. replace plywood as needed for dryrot. remove (e) stucco and replace on 48th side of building. using marvin essential brand windows like to like. same size, locations, max u-factor0.3. | $187,000 |
| May 30, 2024 | Completed final sign-off Aug 2024 | 1702 Fell St | L E C A Construction Llc | common area: rear stairway railing repair in-kind. less than 50%Details
common area: rear stairway railing repair in-kind. less than 50% | $35,000 |
| Mar 21, 2024 | Completed final sign-off Mar 2026 | 1454 Union St | L E C A Construction Llc | revision 202303244318- addition of new trench for underground water line for sprkinler on ground levelDetails
revision 202303244318- addition of new trench for underground water line for sprkinler on ground level | $3,100 |
| May 23, 2023 | Never finaled issued Jul 2023, no final | 1454 Union St | L E C A Construction Llc | revision to pa# 202009154231, revise adu units for existing conditions & associated structural at gridline g at first flDetails
revision to pa# 202009154231, revise adu units for existing conditions & associated structural at gridline g at first fl | $5,000 |
| Apr 27, 2023 | Completed final sign-off Oct 2025 | 4350 Kirkham St | L E C A Construction Llc | add six new accessory dwelling units to the ground floor of the bldg under ordinance 162-16 and planning code section 207(c)(4)Details
add six new accessory dwelling units to the ground floor of the bldg under ordinance 162-16 and planning code section 207(c)(4) | $716,872 |
| Nov 4, 2022 | Never finaled issued Nov 2022, no final | 1454 Union St | L E C A Construction Llc | front building: revision to permit 202009154231. additional structural details to address the site conditions.Details
front building: revision to permit 202009154231. additional structural details to address the site conditions. | |
| Sep 22, 2022 | Completed final sign-off May 2024 | 1330 Quesada Av | L E C A Construction Llc | minor interior remodel of units including kitchens & bathrooms, rooring material replacement,replace windows @ front facade w/wood frame or aluminium wood clad, single/double hung. in-kind window replacement of new window & door at rear.Details
minor interior remodel of units including kitchens & bathrooms, rooring material replacement,replace windows @ front facade w/wood frame or aluminium wood clad, single/double hung. in-kind window replacement of new window & door at rear. | $50,000 |
| Jul 19, 2021 | Completed final sign-off Aug 2021 | 1702 Fell St | L E C A Construction Llc | open (e) wall at 2 bathrooms and add 2 new windows at bathrooms -Details
open (e) wall at 2 bathrooms and add 2 new windows at bathrooms - | $2,000 |
| Jun 25, 2021 | Completed final sign-off Jan 2022 | 1702 Fell St | L E C A Construction Llc | unit 1 -add laundry room -hallway closet converted to laundry closet, stackable gas machines. ref pa 201903215929Details
unit 1 -add laundry room -hallway closet converted to laundry closet, stackable gas machines. ref pa 201903215929 | $6,000 |
| Jun 16, 2021 | Completed final sign-off Jan 2022 | 1702 Fell St | L E C A Construction Llc | in kind remodel of bathroom, retile shower, new cabinet, replace toilet, repaint, plumbing and electrical for in kind bathroom remdodel. like for like, no moving walls/changes.Details
in kind remodel of bathroom, retile shower, new cabinet, replace toilet, repaint, plumbing and electrical for in kind bathroom remdodel. like for like, no moving walls/changes. | $12,000 |
| Apr 1, 2021 | Completed final sign-off Aug 2021 | 1702 Fell St | L E C A Construction Llc | existing bathroom remodel in-kindDetails
existing bathroom remodel in-kind | $17,000 |
| Dec 17, 2020 | Expired or cancelled expired Mar 2026 | 1454 Union St | L E C A Construction Llc | rear bldg - add 1 adus at ground floor parking and storage per ordinance 162-16. soft story under separate permit # 2016.0414.4795Details
rear bldg - add 1 adus at ground floor parking and storage per ordinance 162-16. soft story under separate permit # 2016.0414.4795 | $25,000 |
| Sep 15, 2020 | Expired or cancelled expired Mar 2026 | 1454 Union St | L E C A Construction Llc | front bldg- add 3 adu's at ground floor parking & storage areas within existing envelope per ordinance 162-16.soft story under separate permit #201604144795. the 4th adu is on a separate permit,Details
front bldg- add 3 adu's at ground floor parking & storage areas within existing envelope per ordinance 162-16.soft story under separate permit #201604144795. the 4th adu is on a separate permit, | $150,000 |
| Jan 2, 2020 | Never finaled issued Jan 2020, no final | 2350 Union St | L E C A Construction Llc | revision to 201706028289 to provide sprinkler protection per sf is eg -05 at doors and windows at proposed unit d in lieu of 45 min rated opening protectionDetails
revision to 201706028289 to provide sprinkler protection per sf is eg -05 at doors and windows at proposed unit d in lieu of 45 min rated opening protection | |
| Oct 7, 2019 | Completed final sign-off Dec 2020 | 308 Jessie St | L E C A Construction Llc | 1st, 2nd & 3rd flrs. office tenant improvement. interior remodel. removal of non-compliant entry gate. no facade work. fully sprinklered building. no structural work.Details
1st, 2nd & 3rd flrs. office tenant improvement. interior remodel. removal of non-compliant entry gate. no facade work. fully sprinklered building. no structural work. | $489,888 |
| Sep 4, 2019 | Completed final sign-off Nov 2019 | 880 Oak St | L E C A Construction Llc | relocate a front door t0 adu at front of basement. adu constructed under sep permit 201703292659.Details
relocate a front door t0 adu at front of basement. adu constructed under sep permit 201703292659. | $5,000 |
| Jul 17, 2019 | Completed final sign-off Dec 2020 | 2350 Union St | L E C A Construction Llc | revision to 201710060622 soft story retrofit per 2016 cebc appx a-4: shear walls changes (2)Details
revision to 201710060622 soft story retrofit per 2016 cebc appx a-4: shear walls changes (2) | |
| Jul 10, 2019 | Completed final sign-off Sep 2019 | 1567 Grove St | L E C A Construction Llc | remove aprox 30 sq ft of drywall. ( to maintain 1 hour fire reated wall). install new sound proof insulation, reinstall type "x" 5/8 drywall. new water proof electrical outlet, new gas outlet on deck. call inspector before work.Details
remove aprox 30 sq ft of drywall. ( to maintain 1 hour fire reated wall). install new sound proof insulation, reinstall type "x" 5/8 drywall. new water proof electrical outlet, new gas outlet on deck. call inspector before work. | $10,000 |
| Jul 10, 2019 | Completed final sign-off Sep 2019 | 1569 Grove St | L E C A Construction Llc | remove aprox 30 sq ft of drywall. ( to maintain 1 hour fire reated wall). install new sound proof insulation, reinstall type "x" 5/8 drywall. new water proof electrical outlet, new gas outlet on deck. replace existing window trim in kind. work not visible from street. call inspector before work.Details
remove aprox 30 sq ft of drywall. ( to maintain 1 hour fire reated wall). install new sound proof insulation, reinstall type "x" 5/8 drywall. new water proof electrical outlet, new gas outlet on deck. replace existing window trim in kind. work not visible from street. call inspector before work. | $10,000 |
| Mar 21, 2019 | Completed final sign-off Sep 2019 | 1702 Fell St | L E C A Construction Llc | unit #1: demo of non-load bearing wall between (e) kitchen & dining, also includes (n) replacement cabinetsDetails
unit #1: demo of non-load bearing wall between (e) kitchen & dining, also includes (n) replacement cabinets | $20,000 |
| Mar 14, 2019 | Completed final sign-off Jan 2022 | 2775 Market St | L E C A Construction Llc | adding (6) additional dwelling units to (e) garage space per ordinance 162-17.Details
adding (6) additional dwelling units to (e) garage space per ordinance 162-17. | $350,000 |
| Mar 11, 2019 | Completed final sign-off Sep 2020 | 519 Hamilton St | Valex Construction, L E C A Construction Llc | new bedroom, 3 fixture bath and family room addition at lower level and minor alteration to (e) kitchen wall @ upper level. also includes new deck at rear yardDetails
new bedroom, 3 fixture bath and family room addition at lower level and minor alteration to (e) kitchen wall @ upper level. also includes new deck at rear yard | $60,000 |
| Apr 13, 2018 | Completed final sign-off Jul 2018 | 1702 Fell St | L E C A Construction Llc | in-kind replacement of windows at the front of the building. wood frame - vinylclad "marvin" or similar. u-factor = 0.32max. maintain emergency/rescue window requirement at bedrooms.Details
in-kind replacement of windows at the front of the building. wood frame - vinylclad "marvin" or similar. u-factor = 0.32max. maintain emergency/rescue window requirement at bedrooms. | $20,000 |
| Feb 6, 2018 | Completed final sign-off Mar 2021 | 2346 Union St | L E C A Construction Llc | separate rear building, change of use from carport to add two new accessory dwelling units to detached existing rear garage structure per ord 162-16.Details
separate rear building, change of use from carport to add two new accessory dwelling units to detached existing rear garage structure per ord 162-16. | $20,000 |
| Nov 6, 2017 | Completed final sign-off Dec 2019 | 880 Oak St | L E C A Construction Llc | soft story retrofit per sfebc ch 4d 2016 cebc app a4Details
soft story retrofit per sfebc ch 4d 2016 cebc app a4 | $40,000 |
| Aug 7, 2017 | Completed final sign-off Sep 2017 | 123 Steiner St | L E C A Construction Llc | 3rd fl: hook up gas for new fire place, drywall work, replace electrical ceiling light. prime & paint. no floor penetrationDetails
3rd fl: hook up gas for new fire place, drywall work, replace electrical ceiling light. prime & paint. no floor penetration | $10,500 |
| Jun 2, 2017 | Completed final sign-off Mar 2021 | 2350 Union St | L E C A Construction Llc | front building. add 3 new accessory dwelling units to the rear portion of the ground floor per ordinance 162-16.Details
front building. add 3 new accessory dwelling units to the rear portion of the ground floor per ordinance 162-16. | $125,000 |
| Mar 29, 2017 | Completed final sign-off Dec 2019 | 880 Oak St | L E C A Construction Llc | add one new accessory dwelling unit to the front portion of basement per ordinance no 162-16.Details
add one new accessory dwelling unit to the front portion of basement per ordinance no 162-16. | $25,000 |
| Mar 4, 2014 | Completed final sign-off Aug 2014 | 332 Frederick St | L E C A Construction Llc | replace existing windows on the front facade of the building. same size, no new openings. new windows to be woodframe to match exising style. ogge glazing profile double pane double hung & fix. also replace 2 existing front doors to wood doors. provide sfaety glazing where applicable.Details
replace existing windows on the front facade of the building. same size, no new openings. new windows to be woodframe to match exising style. ogge glazing profile double pane double hung & fix. also replace 2 existing front doors to wood doors. provide sfaety glazing where applicable. | $14,200 |
| Oct 4, 2013 | Completed final sign-off Aug 2014 | 332 Frederick St | L E C A Construction Llc | replace double glazed double hung 6 window on east alley. no change in design.Details
replace double glazed double hung 6 window on east alley. no change in design. | $10,000 |
| Aug 23, 2013 | Completed final sign-off Feb 2014 | 121 Steiner St | L E C A Construction Llc | install new furnace, remove existing furnace at different location in the building.Details
install new furnace, remove existing furnace at different location in the building. | $6,000 |
| Jun 5, 2013 | Completed final sign-off Feb 2014 | 121 Steiner St | L E C A Construction Llc | to comply with report of physical inspection application cc-7108Details
to comply with report of physical inspection application cc-7108 | $15,200 |
| May 9, 2013 | Completed final sign-off Aug 2014 | 332 Frederick St | L E C A Construction Llc | remodeling of kitchens and bath. installing new heating systems, insulating & installing dbl glazed windows at rear. no change in design.Details
remodeling of kitchens and bath. installing new heating systems, insulating & installing dbl glazed windows at rear. no change in design. | $300,000 |
| Dec 13, 2012 | Completed final sign-off Dec 2013 | 3790 16th St | L E C A Construction Llc | replacement of front entry stairs & entry porch landing ( common area to both units) units are condos.Details
replacement of front entry stairs & entry porch landing ( common area to both units) units are condos. | $12,000 |