Nilgun A. Wolpe
- Listed as
- architect, engineer
- Firm
- N.Y. Engineering
- Based in
- San Francisco
- On San Francisco permits
- Mar 2006 to Oct 2026
44 permits since 2000 (engineer on 40 permits, architect on 4 permits): 28 completed, 5 in progress, 5 never finaled, 6 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 2, 2026 | In progress filed Oct 2026, not yet issued | 248 Whitney St | remove (e) closet partitions and doors at 2nd floor primary bedroom. provide framing per structural plans.Details
remove (e) closet partitions and doors at 2nd floor primary bedroom. provide framing per structural plans. | $3,000 | |
| Jun 29, 2026 | In progress issued Jul 2026 | 246 Bocana St | Ava Jamshidnejad | revision to permit 202504295406. new foundation at gridline 2 and b.Details
revision to permit 202504295406. new foundation at gridline 2 and b. | |
| Feb 9, 2026 | Completed final sign-off Jun 2026 | 3210 Gough St | Flores General Building | unit 102: renovations - new kitchen and bathroom locations. new bedroom. new bedroom egress window facing gough st. associated structural, mechanical, electrical, and plumbing. no changes to habitable area.Details
unit 102: renovations - new kitchen and bathroom locations. new bedroom. new bedroom egress window facing gough st. associated structural, mechanical, electrical, and plumbing. no changes to habitable area. | $40,000 |
| Dec 22, 2025 | Expired or cancelled withdrawn Dec 2025 | 1834 Gough St | Bergquist Builders | revision to permit 202505055790. lowering of the basement floor levl with new footing and stem wall. basement laundry room and bathroom remodel.Details
revision to permit 202505055790. lowering of the basement floor levl with new footing and stem wall. basement laundry room and bathroom remodel. | $38,000 |
| Sep 15, 2025 | Completed final sign-off Sep 2026 | 2655 Broderick St | Fontana Construction, Inc. | revision to pa#202508294203. remodel of the primary bedroom and bathroom at 3rd floor. replace primary bathroom window sash. new bathroom layout with shower and tub. replace interior wood doors at 3rd fl. remodel of guest bathroom & laundry room at 3rd fl. install new electric subpanel & installDetails
revision to pa#202508294203. remodel of the primary bedroom and bathroom at 3rd floor. replace primary bathroom window sash. new bathroom layout with shower and tub. replace interior wood doors at 3rd fl. remodel of guest bathroom & laundry room at 3rd fl. install new electric subpanel & install | $70,000 |
| Jun 26, 2025 | In progress filed Jun 2025, not yet issued | 179 Judson Av | Hung's General Construction | beam support & cross from garage door to new living area. support upstair (no beam to floor @ garage) revision to 201806040882-s1Details
beam support & cross from garage door to new living area. support upstair (no beam to floor @ garage) revision to 201806040882-s1 | $5,000 |
| Dec 19, 2024 | In progress issued Sep 2025 | 241 Mississippi St | R & D Construction Co Inc | revision to pa#202205134234 to include the following: 1) sistering new retaining wall to extg retaining wall. 2) restore extg wooden deck at the front and at the breezeway. 3)excavating the front patio for new pavers on slab.Details
revision to pa#202205134234 to include the following: 1) sistering new retaining wall to extg retaining wall. 2) restore extg wooden deck at the front and at the breezeway. 3)excavating the front patio for new pavers on slab. | $16,000 |
| Nov 27, 2023 | In progress filed Nov 2023, not yet issued | 2500 Broadway | revision to permit 202306150227. changes include updated work in the public right of way and associated work on the property.Details
revision to permit 202306150227. changes include updated work in the public right of way and associated work on the property. | ||
| Sep 14, 2023 | Completed final sign-off Nov 2024 | 38 Elsie St | Mcguinness Mccann Group | revision of permit 202306260841. construction to add 4 x 10's at grid line a and b at 2/f, 1 & 3 @ 2/fDetails
revision of permit 202306260841. construction to add 4 x 10's at grid line a and b at 2/f, 1 & 3 @ 2/f | |
| Jun 6, 2023 | Completed final sign-off Dec 2024 | 639 Castro St | J5 Real Estate Development Co | approx. 17.5 linear feet of reinforcing retaining wall that spans the east (rear) property line and will be anchored to the existing retaining wall.Details
approx. 17.5 linear feet of reinforcing retaining wall that spans the east (rear) property line and will be anchored to the existing retaining wall. | $45,000 |
| May 24, 2023 | Never finaled issued May 2023, no final | 636 Hyde St | Bashaw Construction | unit 101: remove moldy sheetrock replace with new insulation possiply. bath & kitchen remodel.Details
unit 101: remove moldy sheetrock replace with new insulation possiply. bath & kitchen remodel. | $50,000 |
| Mar 9, 2023 | Completed final sign-off Dec 2023 | 1308 Diamond St | Mcdp Dba Geothersun Construction | remodel and existing balcony with new staircaseDetails
remodel and existing balcony with new staircase | $10,000 |
| Sep 12, 2022 | Completed final sign-off Nov 2023 | 1308 Diamond St | Mcdp Dba Geothersun Construction | interior remodel of e bedrooms in lower level and addition of a full bathroom. new entry design with model of e staircase. new window to match e in kind.Details
interior remodel of e bedrooms in lower level and addition of a full bathroom. new entry design with model of e staircase. new window to match e in kind. | $60,000 |
| Sep 2, 2020 | Completed final sign-off Jul 2025 | 3953 Geary Bl | comply w/ complaint #202041921 (interior/exterior demo) & pln2020-00651prl (window replacement): change of use at 2nd floor from office to residential dwelling unit.Details
comply w/ complaint #202041921 (interior/exterior demo) & pln2020-00651prl (window replacement): change of use at 2nd floor from office to residential dwelling unit. | $60,000 | |
| Jul 26, 2019 | Completed final sign-off Dec 2022 | 216 Yerba Buena Av | K 2 Builders Inc | convert extg garage into habitable space, excavation at the rear, replace foundation and slab, renovate extg 2nd level.Details
convert extg garage into habitable space, excavation at the rear, replace foundation and slab, renovate extg 2nd level. | $220,971 |
| Feb 28, 2019 | Completed final sign-off Jan 2020 | 445 Banks St | The Carpenter With Class | remove (e) interior window for (n) wider doorDetails
remove (e) interior window for (n) wider door | $2,000 |
| Jun 4, 2018 | Never finaled issued Feb 2019, no final | 179 Judson Av | Hung's General Construction | (2) story rear addition & (n) conditioned living area @ (e) 1st floor garage spaceDetails
(2) story rear addition & (n) conditioned living area @ (e) 1st floor garage space | $300,000 |
| Mar 7, 2018 | Completed final sign-off Jun 2018 | 528 Bryant St | Tri Point Mprovements | bldg shell upgrades. new street & roof side alum. storefront system. removal of exg window, removal of annex appendage at roof. beam at 2nd floor. new cement plaster exterior at front facade & rear, roof side facade. parapet resolution. n/a for maher.Details
bldg shell upgrades. new street & roof side alum. storefront system. removal of exg window, removal of annex appendage at roof. beam at 2nd floor. new cement plaster exterior at front facade & rear, roof side facade. parapet resolution. n/a for maher. | $45,000 |
| Feb 5, 2018 | Expired or cancelled withdrawn Aug 2025 | 639 Teresita Bl | replace dryrot ground level deck and build a new rear deck and stairs to support existing deck. modify previous scope.Details
replace dryrot ground level deck and build a new rear deck and stairs to support existing deck. modify previous scope. | $52,000 | |
| Dec 21, 2017 | Completed final sign-off Feb 2019 | 535 Dolores St | Stay Covered Builders Inc | interior renovations, kitchen and 2 & 1/2 baths, 2 bedrooms, new windows, sidingDetails
interior renovations, kitchen and 2 & 1/2 baths, 2 bedrooms, new windows, siding | $150,000 |
| Nov 1, 2017 | Completed final sign-off Jun 2018 | 44 Cervantes Bl | Vector Construction Inc. | soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4 n/a for maherDetails
soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4 n/a for maher | $40,000 |
| Sep 11, 2017 | Completed final sign-off Oct 2017 | 3098 California St | Sft Construction Corp | soft story retrofit for revision to app#201612144932 steel strong wall (height and width) changes.Details
soft story retrofit for revision to app#201612144932 steel strong wall (height and width) changes. | |
| Nov 3, 2016 | Expired or cancelled suspend Aug 2017 | 4068 Folsom St | Stay Covered Builders Inc | voluntary foundation strengthening within building envelope per plan. soft demolition of non-bearing walls, floos, finishes, baths and kitchens.Details
voluntary foundation strengthening within building envelope per plan. soft demolition of non-bearing walls, floos, finishes, baths and kitchens. | $100,000 |
| Jan 29, 2016 | Completed final sign-off Jan 2018 | 544 Central Av | Elliott Build Remodel Llc | kitchen remodeling & powder room addition.Details
kitchen remodeling & powder room addition. | $100,000 |
| May 28, 2015 | Completed final sign-off Aug 2015 | 47 Ford St | Jerimiah F Deasy/General Contractor | replace partial foundation (same area) as in kind. "work in common"Details
replace partial foundation (same area) as in kind. "work in common" | $10,000 |
| May 8, 2015 | Completed final sign-off Mar 2016 | 20 Lenox Wy | Fog Horn Builders Inc | ground fl remodel to include bedroom, family room, office, full bath. 2nd fl open wall at kitchen, add 1/2 bathDetails
ground fl remodel to include bedroom, family room, office, full bath. 2nd fl open wall at kitchen, add 1/2 bath | $50,000 |
| Nov 20, 2014 | Expired or cancelled withdrawn Nov 2015 | 3660 Folsom St | revision appl 201410158964 to show new retaining wall at line 2 per detail 17/s-4 and 18/s-4.Details
revision appl 201410158964 to show new retaining wall at line 2 per detail 17/s-4 and 18/s-4. | ||
| Nov 20, 2014 | Expired or cancelled cancelled Jan 2026 | 2275 Francisco St | seismic soft story per sfbc chapter 34b-2012 iebc appendix a-4;maher n/aDetails
seismic soft story per sfbc chapter 34b-2012 iebc appendix a-4;maher n/a | $60,000 | |
| Sep 29, 2014 | Completed final sign-off Apr 2015 | 3801 Market St | Vector Construction Inc. | seismic soft story 2012 iebc chapter 34bDetails
seismic soft story 2012 iebc chapter 34b | $45,000 |
| Sep 10, 2014 | Never finaled issued Sep 2014, no final | 1088 Rhode Island St | Kendu Construction | revision to 201406249392. new conditioned bedroom at front lower level. lowered floor line. also with added full bathDetails
revision to 201406249392. new conditioned bedroom at front lower level. lowered floor line. also with added full bath | $40,000 |
| Aug 29, 2014 | Completed final sign-off Feb 2015 | 696 Guerrero St | mandatory tier 4, seismic soft story upgrade. new foundations at shearwalls at ecisting 1st fl retail and service spaces. soft story retrofit per sfbc ch 34 b 2012 iebc appendixDetails
mandatory tier 4, seismic soft story upgrade. new foundations at shearwalls at ecisting 1st fl retail and service spaces. soft story retrofit per sfbc ch 34 b 2012 iebc appendix | $30,000 | |
| Aug 27, 2014 | Completed final sign-off Dec 2014 | 170 Downey St | Vector Construction Inc. | mandated tier iii seismic soft story upgrade, new foundations & shearwalls at (e) 1st floor service spaces. soft story retrofit per sfbc chapter 34b 2012 iebc appendix a-4.Details
mandated tier iii seismic soft story upgrade, new foundations & shearwalls at (e) 1st floor service spaces. soft story retrofit per sfbc chapter 34b 2012 iebc appendix a-4. | $30,000 |
| Aug 25, 2014 | Completed final sign-off Dec 2015 | 410 Bartlett St | revision/modification pa #2014.0305.9906 (soft story retrofit) - there was no existing foundation, the new footing is added. minor changes according to (e) job site condition.Details
revision/modification pa #2014.0305.9906 (soft story retrofit) - there was no existing foundation, the new footing is added. minor changes according to (e) job site condition. | ||
| Jul 13, 2012 | Completed final sign-off Sep 2012 | 61 Glover St | Peak General Contractors Inc | remove partition wall and rearrange closet. rearrange closets between e bedroom and e office. remove one bathroom and one kitchen. replace windows, not visible from the street.Details
remove partition wall and rearrange closet. rearrange closets between e bedroom and e office. remove one bathroom and one kitchen. replace windows, not visible from the street. | $30,000 |
| Dec 11, 2008 | Expired or cancelled expired Mar 2010 | 234 Guerrero St | bathroom remodel at 2nd floor, add toilet,pedestal sink. closet under existing stair, minor modification to two interior nonload bearing walls.Details
bathroom remodel at 2nd floor, add toilet,pedestal sink. closet under existing stair, minor modification to two interior nonload bearing walls. | $8,000 | |
| Nov 7, 2008 | Completed final sign-off Oct 2009 | 2306 Geary Bl | Hing Wah Construction Inc | per plan: seismic upgrade entire house: lower basement by 2'-0". 2-storage/laundry & 1/2 bath. remodel 2nd. flr.: add stairs to 3rd. flr. remodel 1st. flr.: add full bath convert attic to 3rd. flr. add full bath & bedrm.Details
per plan: seismic upgrade entire house: lower basement by 2'-0". 2-storage/laundry & 1/2 bath. remodel 2nd. flr.: add stairs to 3rd. flr. remodel 1st. flr.: add full bath convert attic to 3rd. flr. add full bath & bedrm. | $160,000 |
| Sep 29, 2008 | Completed final sign-off Jan 2009 | 18 Topaz Wy | enclose existing rear deck and upper levelDetails
enclose existing rear deck and upper level | $15,000 | |
| Sep 17, 2008 | Completed final sign-off Jun 2009 | 239 Grant Av | Peak General Contractors Inc | work on 3rd fl.to comply w/n.o.v. 200851116500 - change of use from office to personal service/hair salon & sink to comply w/handicap.Details
work on 3rd fl.to comply w/n.o.v. 200851116500 - change of use from office to personal service/hair salon & sink to comply w/handicap. | $2,000 |
| Nov 13, 2007 | Never finaled issued Nov 2007, no final | 3319 Divisadero St | revision to appl. #2007.09.25.3645. delete improvement on ground floor - (e) to remain. replace existing windows as in kind with wood frame - dual glazing. reduce window size in kitchen area.Details
revision to appl. #2007.09.25.3645. delete improvement on ground floor - (e) to remain. replace existing windows as in kind with wood frame - dual glazing. reduce window size in kitchen area. | ||
| Nov 13, 2007 | Completed final sign-off Mar 2008 | 3319 Divisadero St | 2nd floor - remodel kitchen: replace cabinet, flooring in same location. remodel two bathroom - replace fixture and flooring. work on unit #3319.Details
2nd floor - remodel kitchen: replace cabinet, flooring in same location. remodel two bathroom - replace fixture and flooring. work on unit #3319. | $15,000 | |
| Sep 25, 2007 | Never finaled issued Sep 2007, no final | 2720 Hyde St | revision to appl. #200508150318 & #200703125938. open another window @ rear of building on ground floor commercial side (#2272a).Details
revision to appl. #200508150318 & #200703125938. open another window @ rear of building on ground floor commercial side (#2272a). | $1,500 | |
| Oct 4, 2006 | Completed final sign-off Mar 2008 | 541 Divisadero St | remodel existing kitchen and baths, frame for new closet at bedrooms.Details
remodel existing kitchen and baths, frame for new closet at bedrooms. | $70,000 | |
| May 18, 2006 | Completed final sign-off Sep 2006 | 2941 Gough St | convert kchn and breakfast to study room/convert closet to kchn. 2nd floor unit #3Details
convert kchn and breakfast to study room/convert closet to kchn. 2nd floor unit #3 | $18,000 | |
| Mar 29, 2006 | Completed final sign-off Jul 2006 | 9 Idora Av | horizontal addition- deck addition at rear of existing building.Details
horizontal addition- deck addition at rear of existing building. | $12,000 |