Nicholas Reid
- Listed as
- engineer
- Based in
- Sam Francisco
- On San Francisco permits
- Dec 2021 to Mar 2024
3 permits since 2000 (engineer on 3 permits): 2 completed, 1 in progress.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 19, 2024 | In progress filed Mar 2024, not yet issued | 278 Post St | Rudolph Commercial Interiors Inc, Rci | replacement of (e) fluid cooler, condenser water pumps, heating hot water boiler, heating hot water pumps and associated piping and appertenances. replace of existing rooftop existing rooftop emergency generatorDetails
replacement of (e) fluid cooler, condenser water pumps, heating hot water boiler, heating hot water pumps and associated piping and appertenances. replace of existing rooftop existing rooftop emergency generator | $190,000 |
| Oct 23, 2023 | Completed final sign-off Oct 2024 | 190 Post St | Rudolph Commercial Interiors Inc, Rci | basement, 1st & 2nd - shell emising includes demo of non-structural partitions and building non structural partitions. all new or revised meps and life safety work will be design build and submitted for permit separately (building is fully sprinklered). structural work elevator pitDetails
basement, 1st & 2nd - shell emising includes demo of non-structural partitions and building non structural partitions. all new or revised meps and life safety work will be design build and submitted for permit separately (building is fully sprinklered). structural work elevator pit | $425,000 |
| Dec 29, 2021 | Completed final sign-off Apr 2024 | 180 Post St | Alten Construction Inc | voluntary seismic strengthening to add two moment frames.Details
voluntary seismic strengthening to add two moment frames. | $500,000 |