Mohamad Sadrieh
- Listed as
- architect, designer, engineer
- Firm
- Mohamad Sadrieh Architects
- Based in
- Sausalito
- On San Francisco permits
- Dec 2004 to Jul 2026
14 permits since 2000 (architect on 12 permits, designer on 1 permit, engineer on 1 permit): 7 completed, 3 in progress, 2 never finaled, 2 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 31, 2026 | In progress issued Aug 2026 | 631 Folsom St | revision to pa # 202509235881 - 20 and 21st floor - reconfiguration of powder rm & mech rm. switch location of sink and counter top on island, switch tub, shower, change doors and addition of tub in master bedroom, reconfiguration of closet, vanity, toilet and shower. change door in bedroom 3.Details
revision to pa # 202509235881 - 20 and 21st floor - reconfiguration of powder rm & mech rm. switch location of sink and counter top on island, switch tub, shower, change doors and addition of tub in master bedroom, reconfiguration of closet, vanity, toilet and shower. change door in bedroom 3. | $5,000 | |
| May 20, 2026 | In progress issued Jul 2026 | 2001 Union St | Westek Systems Inc | 5/f: adding 273 sf from ste 540 to 550. adding 11 sf from hallway to ste 550. creating a new office and operatory in ste 550. changing an (e) office into a lunch room in ste 550.Details
5/f: adding 273 sf from ste 540 to 550. adding 11 sf from hallway to ste 550. creating a new office and operatory in ste 550. changing an (e) office into a lunch room in ste 550. | $30,000 |
| Oct 29, 2025 | Completed final sign-off Jul 2026 | 3878 21st St | D3 Construction | new fence and gate for side yard entrance.Details
new fence and gate for side yard entrance. | $4,000 |
| Oct 16, 2025 | Completed final sign-off Jul 2026 | 3878 21st St | D3 Construction | reconfigure 3rd fl. bathroom wall to relocate vanity reinstate permit # 2023-0872-4905Details
reconfigure 3rd fl. bathroom wall to relocate vanity reinstate permit # 2023-0872-4905 | $2,000 |
| Sep 23, 2025 | In progress issued Feb 2026 | 631 Folsom St | 20th & 21st/ relocation of partitions on 20 th and 2st level. new kitchen and bathroom and media rooms. nnew flooring thruout.Details
20th & 21st/ relocation of partitions on 20 th and 2st level. new kitchen and bathroom and media rooms. nnew flooring thruout. | $90,000 | |
| Mar 27, 2025 | Expired or cancelled expired Jul 2026 | 3878 21st St | D3 Construction | replace existing windows front facade with clad windows raising sills to existing windows. replace rear windows.Details
replace existing windows front facade with clad windows raising sills to existing windows. replace rear windows. | $25,000 |
| Apr 11, 2019 | Completed final sign-off Sep 2019 | 1431 Polk St | Evan Palmer | revistion to pa 201807053743. accessible ramp at entry to storeDetails
revistion to pa 201807053743. accessible ramp at entry to store | |
| Jul 5, 2018 | Completed final sign-off Sep 2019 | 1431 Polk St | Evan Palmer | removal of storefront door & windows,removal of all (e) equipment & builtins,removal of several non load bearing partitions,removal of all flooring except bathroom adding (n) doors & windows,buildins (n) office, install cooler frame mezz,slab,new elec,mech,plumb,new tile flr,new equip & counterDetails
removal of storefront door & windows,removal of all (e) equipment & builtins,removal of several non load bearing partitions,removal of all flooring except bathroom adding (n) doors & windows,buildins (n) office, install cooler frame mezz,slab,new elec,mech,plumb,new tile flr,new equip & counter | $246,000 |
| Dec 9, 2016 | Never finaled issued Dec 2016, no final | 454 Clipper St | C L Construction | revision to app#201611142618. replace a planter in front of house.Details
revision to app#201611142618. replace a planter in front of house. | $6,000 |
| Feb 24, 2015 | Completed final sign-off Sep 2017 | 1 Rosewood Dr | lower fl: change (e) 850 s.f. crawl space into living space, (n) doors, windows, refurbish (e) living space. 1/f: remodel kitchen, expand kitchen into pantry, new staircase. 2/f: remodel master bath, closet & childrens bath. no work outside bldg envelope.Details
lower fl: change (e) 850 s.f. crawl space into living space, (n) doors, windows, refurbish (e) living space. 1/f: remodel kitchen, expand kitchen into pantry, new staircase. 2/f: remodel master bath, closet & childrens bath. no work outside bldg envelope. | $220,000 | |
| Oct 15, 2013 | Completed final sign-off Nov 2014 | 2742 Pierce St | new powder room in e closet, remove partition between closet and master bath, new larger master bath. remove wall betwen 2 rear bedrooms, install beams, posts,footings to replace wall. remove wall section on lower floor near stairs. new casework. reduction of fr. dr. @Details
new powder room in e closet, remove partition between closet and master bath, new larger master bath. remove wall betwen 2 rear bedrooms, install beams, posts,footings to replace wall. remove wall section on lower floor near stairs. new casework. reduction of fr. dr. @ | $72,000 | |
| May 23, 2005 | Expired or cancelled expired Aug 2007 | 2740 Filbert St | Legacy Bulders | relocate some interior walls,revision to appl#200404080828 no exterior changes.Details
relocate some interior walls,revision to appl#200404080828 no exterior changes. | |
| Apr 6, 2005 | Completed final sign-off Jul 2005 | 2505 19th St | On-Site Maintenance | install electric space heating top floor unit per plan.Details
install electric space heating top floor unit per plan. | $750 |
| Dec 7, 2004 | Never finaled issued Dec 2004, no final | 2503 19th St | On-Site Maintenance | installation of electric space heating upper floor, addition to permit 200411129000Details
installation of electric space heating upper floor, addition to permit 200411129000 | $750 |