Milton Enrique Avila
- Listed as
- authorized agent-others, contractor, designer
- Firm
- The Frame Construction
- Based in
- Vallejo
- On San Francisco permits
- Feb 2021 to Jul 2026
32 permits since 2000 (contractor on 32 permits, designer on 2 permits, authorized agent-others on 1 permit): 24 completed, 5 in progress, 3 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. Their ranked record as a contractor is on their contractor page. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 21, 2026 | In progress issued Jul 2026 | 300 16th Av | The Frame Construction | apt #403: remodel kitchen and bathroom like for like rewire apartment, new copper lines in apt.Details
apt #403: remodel kitchen and bathroom like for like rewire apartment, new copper lines in apt. | $65,000 |
| Mar 12, 2026 | In progress issued Mar 2026 | 333 Bush St | The Frame Construction | 40/f - unit 4005: remodel kitchen and master bath in kind, no layout change. adding steam unit, change tub to shower in master bathroom. hallway bathroom remodel in kind, no layout change. replace tiles in balcony. update hvac to current code.Details
40/f - unit 4005: remodel kitchen and master bath in kind, no layout change. adding steam unit, change tub to shower in master bathroom. hallway bathroom remodel in kind, no layout change. replace tiles in balcony. update hvac to current code. | $140,000 |
| Jan 23, 2026 | Completed final sign-off Feb 2026 | 1700 Broadway | The Frame Construction | unit# 606. replace kitchen cabinets. replace kitchen sink, replacing outlets in kitchen.Details
unit# 606. replace kitchen cabinets. replace kitchen sink, replacing outlets in kitchen. | $25,000 |
| Dec 19, 2025 | Completed final sign-off Apr 2026 | 1595 Greenwich St | The Frame Construction | unit 20: remodel kitchen and bathroom, repair walls due to water damage. like for like.Details
unit 20: remodel kitchen and bathroom, repair walls due to water damage. like for like. | $65,000 |
| Nov 7, 2025 | In progress issued Nov 2025 | 1383 Revere Av | The Frame Construction | in kind bathroom and kitchen remodel upper unitDetails
in kind bathroom and kitchen remodel upper unit | $60,000 |
| Aug 20, 2025 | Completed final sign-off Dec 2025 | 4354 20th St | The Frame Construction | to comply with nov 202541607: replace cabinets in kitchen, replace tile walls, floors, faucets in two bathrooms. bathroom and kitchen remodel.Details
to comply with nov 202541607: replace cabinets in kitchen, replace tile walls, floors, faucets in two bathrooms. bathroom and kitchen remodel. | $40,000 |
| Aug 19, 2025 | Completed final sign-off Dec 2025 | 1745 Beach St | The Frame Construction | unit 15: remodel kitchen and bathroom. no removal of walls.Details
unit 15: remodel kitchen and bathroom. no removal of walls. | $60,000 |
| Jul 25, 2025 | Completed final sign-off Nov 2025 | 1700 Broadway | The Frame Construction | unit #602: remodel kitchen and bathroom.Details
unit #602: remodel kitchen and bathroom. | $60,000 |
| May 5, 2025 | Completed final sign-off Jul 2025 | 1640 Kirkham St | The Frame Construction | unit #17 - remodel kitchen, bathroom, painting, floors, plumbing, and electrical. kitchen and bathroom remodel in kind. no moving walls. kitchen approx. 48 sq ft. bathroom approx. 35 sq ft.Details
unit #17 - remodel kitchen, bathroom, painting, floors, plumbing, and electrical. kitchen and bathroom remodel in kind. no moving walls. kitchen approx. 48 sq ft. bathroom approx. 35 sq ft. | $60,000 |
| May 5, 2025 | Completed final sign-off Jul 2025 | 1640 Kirkham St | The Frame Construction | unit #7 - remodel kitchen, bathroom, painting, floors, plumbing, and electrical. kitchen and bathroom remodel in kind. no moving walls. kitchen approx. 48 sq ft. bathroom approx. 35 sq ft.Details
unit #7 - remodel kitchen, bathroom, painting, floors, plumbing, and electrical. kitchen and bathroom remodel in kind. no moving walls. kitchen approx. 48 sq ft. bathroom approx. 35 sq ft. | $60,000 |
| Dec 27, 2024 | Completed final sign-off Mar 2025 | 1700 Broadway | The Frame Construction | apt #603: remodel kitchen & bathroom. paint apartment. no removal of wallsDetails
apt #603: remodel kitchen & bathroom. paint apartment. no removal of walls | $80,000 |
| Dec 27, 2024 | Completed final sign-off Apr 2025 | 300 16th Av | The Frame Construction | apt #304: remodel kitchen & bathroom. paint apartment. no removal of wallsDetails
apt #304: remodel kitchen & bathroom. paint apartment. no removal of walls | $80,000 |
| Nov 25, 2024 | In progress issued Jul 2025 | 1383 Revere Av | The Frame Construction | 1) install 2nd dwelling unit, which was initally existing per 3-r report prior to january 30th. 2)convert existing bedrm to kitchen & living at 2nd fl. 3)convert extg living & kitchen to bedrm at 2nd fl.4)rahb. existg bathrm. 5)convert extg bedrm to living @1st fl.6)install kitchen @ walkin closetDetails
1) install 2nd dwelling unit, which was initally existing per 3-r report prior to january 30th. 2)convert existing bedrm to kitchen & living at 2nd fl. 3)convert extg living & kitchen to bedrm at 2nd fl.4)rahb. existg bathrm. 5)convert extg bedrm to living @1st fl.6)install kitchen @ walkin closet | $90,000 |
| Oct 9, 2024 | Completed final sign-off Jun 2025 | 43 Sussex St | The Frame Construction | unit#a: kitchen and bathroom remodel plus paint apartment and refinish floors. unit#b: kitchen and bathroom remodel plus paint and floors. unit#c: kitchen and bathroom remodel plus paint and floors.Details
unit#a: kitchen and bathroom remodel plus paint apartment and refinish floors. unit#b: kitchen and bathroom remodel plus paint and floors. unit#c: kitchen and bathroom remodel plus paint and floors. | $80,000 |
| Aug 12, 2024 | Completed final sign-off Sep 2024 | 1520 Leavenworth St | The Frame Construction | violation corrections complaint number#202426427. floor joists damaged/cut while performing plumbing work. repair inkind ~(6) joistsDetails
violation corrections complaint number#202426427. floor joists damaged/cut while performing plumbing work. repair inkind ~(6) joists | $5,000 |
| Mar 15, 2024 | In progress issued Mar 2024 | 966 Oak St | The Frame Construction | repair concrete sog in garage install underound pipe. fire bell in garage. patch and paint holes for sprinklers after installation under separate permit.patch & repiar all penetration as result of sprinkler installation.Details
repair concrete sog in garage install underound pipe. fire bell in garage. patch and paint holes for sprinklers after installation under separate permit.patch & repiar all penetration as result of sprinkler installation. | $6,000 |
| Jan 9, 2024 | Completed final sign-off Feb 2024 | 300 16th Av | The Frame Construction | unit 501. demo existing kitchen and paint apartment. install cabinets and tile kitchen and bathroom.Details
unit 501. demo existing kitchen and paint apartment. install cabinets and tile kitchen and bathroom. | $18,000 |
| Oct 5, 2023 | Completed final sign-off Feb 2024 | 964 Oak St | The Frame Construction | voluntary seismic strengthening in garage story- new plywood shear wall.Details
voluntary seismic strengthening in garage story- new plywood shear wall. | $17,500 |
| Aug 17, 2023 | Completed final sign-off Sep 2023 | 731 11th Av | The Frame Construction | revision of pa202305016800. remove walls between bathroom & closet and kitchen.Details
revision of pa202305016800. remove walls between bathroom & closet and kitchen. | |
| Aug 16, 2023 | Completed final sign-off Apr 2024 | 434 07th Av | The Frame Construction | revision to 202306029114. remove wall in bathroom adding new bathroom in closet. non structural.Details
revision to 202306029114. remove wall in bathroom adding new bathroom in closet. non structural. | $60,000 |
| Jul 25, 2023 | Completed final sign-off Oct 2023 | 1700 Broadway | The Frame Construction | unit# 305: remodel kitchen and bathroom.Details
unit# 305: remodel kitchen and bathroom. | $60,000 |
| Jun 2, 2023 | Completed final sign-off Apr 2024 | 434 07th Av | The Frame Construction | remodel one kitchen and one bathroom. non structural.Details
remodel one kitchen and one bathroom. non structural. | $25,000 |
| May 1, 2023 | Completed final sign-off Sep 2023 | 731 11th Av | The Frame Construction | remodel (1) kitchen and (1) bathroom in kind.Details
remodel (1) kitchen and (1) bathroom in kind. | $30,000 |
| Jan 19, 2023 | Completed final sign-off May 2024 | 2027 Market St | The Frame Construction | unit 12: removal/replacement of (e) loft, to be larger, new ladder stairs & railing. interior work only.Details
unit 12: removal/replacement of (e) loft, to be larger, new ladder stairs & railing. interior work only. | $20,000 |
| Oct 6, 2022 | Never finaled issued Oct 2022, no final | 1350 20th Av | The Frame Construction | remodel kitchen, bathroom and laundry in kindDetails
remodel kitchen, bathroom and laundry in kind | $70,000 |
| Aug 17, 2022 | Completed final sign-off Aug 2022 | 690 34th Av | The Frame Construction | repair to dry rotted threads, risers and landings. replace all itms in kind, no structural work, less than 50% replacement. stairs not visible from the street.Details
repair to dry rotted threads, risers and landings. replace all itms in kind, no structural work, less than 50% replacement. stairs not visible from the street. | $2,000 |
| Aug 2, 2022 | Completed final sign-off Aug 2022 | 590 08th Av | The Frame Construction | voluntary installation of footing @ (e) patio stair structure to remain in place. also replace 5 dryrot damaged treads/rising & 1 damaged stringer. replace in-kind. less than 50% replacement. invisibe from st.Details
voluntary installation of footing @ (e) patio stair structure to remain in place. also replace 5 dryrot damaged treads/rising & 1 damaged stringer. replace in-kind. less than 50% replacement. invisibe from st. | $2,000 |
| Apr 14, 2022 | Completed final sign-off Apr 2022 | 1885 Jackson St | The Frame Construction | unit 301: relocate door and shelves. add a laundry room.Details
unit 301: relocate door and shelves. add a laundry room. | $4,000 |
| Nov 19, 2021 | Completed final sign-off Dec 2021 | 1 Edward St | The Frame Construction | to address nov #202183013, repair plumbing, electrical, repair sewage line. removal of possible undocumented unit in basement.Details
to address nov #202183013, repair plumbing, electrical, repair sewage line. removal of possible undocumented unit in basement. | $1,000 |
| Oct 28, 2021 | Never finaled issued Oct 2021, no final | 1400 48th Av | The Frame Construction | remodel one kitchen and one bathroom paint exterior or building repplace 40sqft of hand railDetails
remodel one kitchen and one bathroom paint exterior or building repplace 40sqft of hand rail | $40,000 |
| Feb 17, 2021 | Never finaled issued Feb 2021, no final | 474 08th Av | The Frame Construction | remodel kitchen & bathroom. refinish wood floors. interior paint. all work in kind.Details
remodel kitchen & bathroom. refinish wood floors. interior paint. all work in kind. | $30,000 |
| Feb 17, 2021 | Completed final sign-off Jan 2022 | 641 Central Av | The Frame Construction | remodel kitchen & bathroom in kind. new floor & paint.Details
remodel kitchen & bathroom in kind. new floor & paint. | $30,000 |