Michael Joseph Lewis
- Listed as
- authorized agent-others, contractor
- Firm
- Bbc Construction Inc.
- Based in
- San Rafael
- On San Francisco permits
- Jan 2002 to Sep 2026
214 permits since 2000 (contractor on 214 permits, authorized agent-others on 7 permits): 190 completed, 2 in progress, 10 never finaled, 12 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. Their ranked record as a contractor is on their contractor page. How to read these records
Most recent permits
Showing the 100 most recent of 214.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 4, 2026 | In progress issued Sep 2026 | 2150 Jackson St | Bbc Construction Inc. | p/a to respond to complaint 2026-61242 for non-structural work performed in a common area laundry room: paint walls, install fake ceiling, 25 sqft of tiles on wall. like for like remodel. no wall stud demolition, no wall stud construction, no change in plumbing fixture count.Details
p/a to respond to complaint 2026-61242 for non-structural work performed in a common area laundry room: paint walls, install fake ceiling, 25 sqft of tiles on wall. like for like remodel. no wall stud demolition, no wall stud construction, no change in plumbing fixture count. | $10,000 |
| Sep 17, 2025 | Completed final sign-off Dec 2025 | 3323 Clay St | Bbc Construction Inc. | master bedroom - replace 2 windows in like kind - rear of property - not visible from the street. ground floor - replace tub & tile, lav - no change to location of walls or fixtures in existing bathroom.Details
master bedroom - replace 2 windows in like kind - rear of property - not visible from the street. ground floor - replace tub & tile, lav - no change to location of walls or fixtures in existing bathroom. | $25,000 |
| Jun 26, 2025 | Completed final sign-off Oct 2025 | 2919 Fillmore St | Bbc Construction Inc. | repair and replace (e) siding at front of home. (street facing). add flashing at windows. in kind like for like. cedar shingleDetails
repair and replace (e) siding at front of home. (street facing). add flashing at windows. in kind like for like. cedar shingle | $6,000 |
| May 28, 2025 | Completed final sign-off Dec 2025 | 1732 Hayes St | Bbc Construction Inc. | replace (4) casement windows on front elevation. in like kind.Details
replace (4) casement windows on front elevation. in like kind. | $7,500 |
| May 28, 2025 | Completed final sign-off Dec 2025 | 1730 Hayes St | Bbc Construction Inc. | replace (4) casement windows on front elevation. in like kind.Details
replace (4) casement windows on front elevation. in like kind. | $7,500 |
| Apr 8, 2025 | Completed final sign-off Dec 2025 | 555 Clay St | Bbc Construction Inc. | demolition of select interior partitions(non-structural), relocation of idf equip. 4168 sq ft. interior renovation on basement, ground floor and 2nd floor(partial). one new rated partition, relocation of extg non-rated partitions + doors, in kind. new plumbing/electrical fixtures,Details
demolition of select interior partitions(non-structural), relocation of idf equip. 4168 sq ft. interior renovation on basement, ground floor and 2nd floor(partial). one new rated partition, relocation of extg non-rated partitions + doors, in kind. new plumbing/electrical fixtures, | $908,624 |
| Dec 17, 2024 | Completed final sign-off Jul 2026 | 761 Kansas St | Bbc Construction Inc. | (n) 246 sf roof deck. (n) 45 sf headhouse to provide an enclosed stair access to the roof deck. new 42" glass guardrail @ perimeterDetails
(n) 246 sf roof deck. (n) 45 sf headhouse to provide an enclosed stair access to the roof deck. new 42" glass guardrail @ perimeter | $350,000 |
| Dec 3, 2024 | Completed final sign-off Mar 2025 | 2529 Union St | Bbc Construction Inc. | to obtain final inspection for work approved under pa #202210255156, 202212017493, 202307263049. all work is complete.Details
to obtain final inspection for work approved under pa #202210255156, 202212017493, 202307263049. all work is complete. | |
| Jul 18, 2024 | In progress issued Nov 2025 | 461 Pacific Av | Two Bricks Design Build, Bbc Construction Inc. | interior work only. replacement of (e) non-compliant stairs. removal of (e) non-bearing interior walls. 1 hour fire rated stair enclousureDetails
interior work only. replacement of (e) non-compliant stairs. removal of (e) non-bearing interior walls. 1 hour fire rated stair enclousure | $138,000 |
| Oct 25, 2023 | Completed final sign-off Jan 2024 | 134 Juanita Wy | Bbc Construction Inc. | replace window on side of house, patch stucco around window.Details
replace window on side of house, patch stucco around window. | $3,500 |
| Jul 26, 2023 | Expired or cancelled expired Mar 2025 | 2529 Union St | Bbc Construction Inc. | temporary support of excavation for pa# 202212017493.Details
temporary support of excavation for pa# 202212017493. | $10,000 |
| Jun 13, 2023 | Completed final sign-off Sep 2023 | 1555 Francisco St | Bbc Construction Inc. | replace 2 patio doors, repair patio tile on second story balconyDetails
replace 2 patio doors, repair patio tile on second story balcony | $7,500 |
| Jun 13, 2023 | Completed final sign-off Jan 2024 | 134 Juanita Wy | Bbc Construction Inc. | replace g/f window at back of house.Details
replace g/f window at back of house. | $2,500 |
| Apr 20, 2023 | Completed final sign-off Aug 2023 | 65 Homestead St | Bbc Construction Inc. | repairs to rear decking and deck boards as needed- less than 50%. no change to size or shape, in like kind.Details
repairs to rear decking and deck boards as needed- less than 50%. no change to size or shape, in like kind. | $8,000 |
| Jan 3, 2023 | Completed final sign-off Aug 2023 | 27 Scott St | Bbc Construction Inc. | bathroom remodel in kind, remove/replace fixtures, no floor layout changes. no structral work. no additions.Details
bathroom remodel in kind, remove/replace fixtures, no floor layout changes. no structral work. no additions. | $20,000 |
| Jan 3, 2023 | Completed final sign-off Mar 2023 | 5 Jennings Ct | Bbc Construction Inc. | bathroom remodel in kind, remove/replace fixtures, no floor layout changes. no structral work. no additions.Details
bathroom remodel in kind, remove/replace fixtures, no floor layout changes. no structral work. no additions. | $25,000 |
| Dec 1, 2022 | Expired or cancelled expired Mar 2025 | 2529 Union St | Bbc Construction Inc. | replacement of existing and new rear yard retaining walls. new exterior stair and railing.Details
replacement of existing and new rear yard retaining walls. new exterior stair and railing. | $40,000 |
| Oct 25, 2022 | Expired or cancelled cancelled Jan 2026 | 2529 Union St | Bbc Construction Inc. | non structural interior of finishes and caseworkDetails
non structural interior of finishes and casework | $5,000 |
| Oct 25, 2022 | Expired or cancelled expired Mar 2025 | 2529 Union St | Bbc Construction Inc. | kitchen remodel, no sturctural work. in kindDetails
kitchen remodel, no sturctural work. in kind | $65,000 |
| Sep 28, 2022 | Completed final sign-off Feb 2023 | 5 Jennings Ct | Bbc Construction Inc. | bathroom remodel in kind, remove/replace fixtures. no floor layout changes, no structural work.Details
bathroom remodel in kind, remove/replace fixtures. no floor layout changes, no structural work. | $43,000 |
| Sep 26, 2022 | Completed final sign-off Sep 2022 | 3063 Laguna St | Bbc Construction Inc. | to obtain final inspection for work approved under pa# 201809211003, all work is complete.Details
to obtain final inspection for work approved under pa# 201809211003, all work is complete. | |
| Sep 26, 2022 | Completed final sign-off Sep 2022 | 3063 Laguna St | Bbc Construction Inc. | to obtain final inspection for work approved under pa# 201612144995, 201708245789, 201808066478. all work is complete.Details
to obtain final inspection for work approved under pa# 201612144995, 201708245789, 201808066478. all work is complete. | |
| Jul 25, 2022 | Completed final sign-off Sep 2023 | 761 Kansas St | Bbc Construction Inc. | new ships ladder and roof hatch to access roof & (e) penthouse.stucturual strentehing of roof framing for an anitcipated future roof deck between gridlines a8&f.(future roof deck omitted)partrial demo of (e) penthouse and rerouging of utilities as required to achive 3ft clearance width at ladder.Details
new ships ladder and roof hatch to access roof & (e) penthouse.stucturual strentehing of roof framing for an anitcipated future roof deck between gridlines a8&f.(future roof deck omitted)partrial demo of (e) penthouse and rerouging of utilities as required to achive 3ft clearance width at ladder. | $30,000 |
| Mar 4, 2022 | Completed final sign-off Sep 2022 | 280 Spear St | Bbc Construction Inc. | commercial space 1a: t.i. for new optometry: 3 exam rooms, lab,pantry and retail. electrical, life/safety,mechanical, plumbing and sprinkler work under sep permit.Details
commercial space 1a: t.i. for new optometry: 3 exam rooms, lab,pantry and retail. electrical, life/safety,mechanical, plumbing and sprinkler work under sep permit. | $175,000 |
| Oct 28, 2021 | Completed final sign-off Sep 2023 | 761 Kansas St | Bbc Construction Inc. | master bathroom remodel on level 3: relocation and replacement of fixtures and lighting (n) closet from hallway. new pocketdoor. no change to exterior facade.Details
master bathroom remodel on level 3: relocation and replacement of fixtures and lighting (n) closet from hallway. new pocketdoor. no change to exterior facade. | $70,000 |
| Aug 4, 2021 | Completed final sign-off May 2022 | 2425 Polk St | Bbc Construction Inc. | remove & replace (e) fixtures, fittings, & tile fixtures at existing bathroom. new tile. replace window glazing at tub window with safety glass. lighting comply with cec 150.0(k)Details
remove & replace (e) fixtures, fittings, & tile fixtures at existing bathroom. new tile. replace window glazing at tub window with safety glass. lighting comply with cec 150.0(k) | $20,000 |
| Jun 17, 2021 | Completed final sign-off Oct 2021 | 2720 Taylor St | Bbc Construction Inc. | voluntary accessibility upgrades to extg non conforming restroom element tenant spaces vacant.Details
voluntary accessibility upgrades to extg non conforming restroom element tenant spaces vacant. | $7,900 |
| Jun 16, 2021 | Completed final sign-off Feb 2023 | 1960 Vallejo St | Bbc Construction Inc. | at the entrace of the bldg, extend the existing brick landing to accommodate the swing of the proposed new security gate. match brick szie, grout color and basket weave pattern to that of the existing brick courtyard. provide pipe per plan and gap at the left side planter, for drainage from behindDetails
at the entrace of the bldg, extend the existing brick landing to accommodate the swing of the proposed new security gate. match brick szie, grout color and basket weave pattern to that of the existing brick courtyard. provide pipe per plan and gap at the left side planter, for drainage from behind | $15,000 |
| Mar 8, 2021 | Completed final sign-off Mar 2025 | 2529 Union St | Bbc Construction Inc. | new ground level horizontal expansion (145 sf added), new 3rd story horizontal expansion of an existing penthouse (315 sf added), addition of a 3rd story roof deck (350 sf), demo of existing rear yard spiral stair and addition of new interior stair connecting 2nd and 3rd stories, demo of existing chDetails
new ground level horizontal expansion (145 sf added), new 3rd story horizontal expansion of an existing penthouse (315 sf added), addition of a 3rd story roof deck (350 sf), demo of existing rear yard spiral stair and addition of new interior stair connecting 2nd and 3rd stories, demo of existing ch | $500,000 |
| Feb 4, 2021 | Completed final sign-off Jun 2021 | 1820 Union St | Bbc Construction Inc. | unit 103: in kind bathroom remodel, new fixtures.Details
unit 103: in kind bathroom remodel, new fixtures. | $16,000 |
| Feb 4, 2021 | Completed final sign-off Jun 2021 | 1820 Union St | Bbc Construction Inc. | unit 104: in kind bathroom remodel, new fixtures.Details
unit 104: in kind bathroom remodel, new fixtures. | $16,000 |
| Feb 4, 2021 | Completed final sign-off Jun 2021 | 1820 Union St | Bbc Construction Inc. | unit 105: in kind bathroom remodel, new fixtures.Details
unit 105: in kind bathroom remodel, new fixtures. | $16,000 |
| Jan 29, 2021 | Completed final sign-off Mar 2021 | 1731 Grove St | Bbc Construction Inc. | repair rear deck, new membrane, guardrail at 42". no change to size of deck. lass than 50%Details
repair rear deck, new membrane, guardrail at 42". no change to size of deck. lass than 50% | $5,000 |
| Jan 29, 2021 | Completed final sign-off Mar 2021 | 1729 Grove St | Bbc Construction Inc. | repair rear deck, new membrane, guardrail at 42". no change to size of deck. lass than 50%Details
repair rear deck, new membrane, guardrail at 42". no change to size of deck. lass than 50% | $5,000 |
| Nov 18, 2020 | Completed final sign-off Mar 2021 | 141 Fairmount St | Bbc Construction Inc. | remove all (e) kitchen cabinets and counters. replace in-kind. remove pantry closet and contstruct walls & door for new 1/2 bathroom. two new plumbing fixtures, toilet & handsink. all new finishes. no newly conditioned spaceDetails
remove all (e) kitchen cabinets and counters. replace in-kind. remove pantry closet and contstruct walls & door for new 1/2 bathroom. two new plumbing fixtures, toilet & handsink. all new finishes. no newly conditioned space | $45,000 |
| Oct 30, 2020 | Completed final sign-off Dec 2021 | 1914 Webster St | Bbc Construction Inc. | widen (e) garage door.Details
widen (e) garage door. | $17,000 |
| Aug 6, 2020 | Completed final sign-off Apr 2021 | 2326 Union St | Bbc Construction Inc. | kitchen cabinet replacement. remove bearing wall seperating kitchen/living/dining room. install posts and beams.Details
kitchen cabinet replacement. remove bearing wall seperating kitchen/living/dining room. install posts and beams. | $125,000 |
| Jun 9, 2020 | Completed final sign-off Apr 2021 | 387 Arlington St | Bbc Construction Inc. | conversion of unenclosed storage space. fill in gaps in (e) walls on ground floor to form a new room. install patio door, new 1/2 bathroom. 1 kw wall heater in bathroom, (n) heating duct connect to (e) house system. no modification of lateral or gravity system, new topping slab.Details
conversion of unenclosed storage space. fill in gaps in (e) walls on ground floor to form a new room. install patio door, new 1/2 bathroom. 1 kw wall heater in bathroom, (n) heating duct connect to (e) house system. no modification of lateral or gravity system, new topping slab. | $15,000 |
| Jan 8, 2020 | Completed final sign-off May 2020 | 2776 Jackson St | Bbc Construction Inc. | replace existing 5' x 6'8" french doors with new 5' x 6'8" french doors at top floor office. not visible from street. same size, same locationDetails
replace existing 5' x 6'8" french doors with new 5' x 6'8" french doors at top floor office. not visible from street. same size, same location | $4,000 |
| Nov 19, 2019 | Expired or cancelled cancelled Jan 2026 | 55 San Andreas Wy | Bbc Construction Inc. | replace existing wood sash @ misc. windows with identical sash configuration and material living room, dining room, breakfast and master bedroom.Details
replace existing wood sash @ misc. windows with identical sash configuration and material living room, dining room, breakfast and master bedroom. | $25,000 |
| Oct 24, 2019 | Completed final sign-off Sep 2022 | 3063 Laguna St | Bbc Construction Inc. | improvements includes: replace (e) exterior front stairs leading ot (e) 2nd floor dwelling unit. 1-hr rated wall at property line.(n) roof covering at front door landing; (n) storage below replacement stairs.Details
improvements includes: replace (e) exterior front stairs leading ot (e) 2nd floor dwelling unit. 1-hr rated wall at property line.(n) roof covering at front door landing; (n) storage below replacement stairs. | $20,000 |
| Oct 22, 2019 | Completed final sign-off Jan 2020 | 55 San Andreas Wy | Bbc Construction Inc. | powder room 4'8', remove and replace (e) vanity sink and toilet in (e) location. relocate light, add gfi outlets and fan & switch, replace flooring.Details
powder room 4'8', remove and replace (e) vanity sink and toilet in (e) location. relocate light, add gfi outlets and fan & switch, replace flooring. | $9,000 |
| Aug 22, 2019 | Completed final sign-off Feb 2020 | 2206 Steiner St | Bbc Construction Inc. | repairs sue to plumbing flood damage master bath, upstairs hallway, kitchen, garage lvel replace insulation , drywall, cabients, finishes. relocate washer dryer in garage to side wall, install washer dryer 2nd fl all walls to remaain as is locationDetails
repairs sue to plumbing flood damage master bath, upstairs hallway, kitchen, garage lvel replace insulation , drywall, cabients, finishes. relocate washer dryer in garage to side wall, install washer dryer 2nd fl all walls to remaain as is location | $40,000 |
| Aug 16, 2019 | Completed final sign-off Oct 2020 | 100 Alta St | Bbc Construction Inc. | interior alterations of 2 units, apartment d & g. removal of 2 fire places. new interior stairs between level 2 & 3. structural upgrades. lighting updates and add tub.Details
interior alterations of 2 units, apartment d & g. removal of 2 fire places. new interior stairs between level 2 & 3. structural upgrades. lighting updates and add tub. | $75,000 |
| Jul 19, 2019 | Completed final sign-off Sep 2019 | 1820 Union St | Bbc Construction Inc. | remove (e) t-111 siding at west wall of building and replace w/ 5/8" denshield and hardi panels. not visible from street. 10x50Details
remove (e) t-111 siding at west wall of building and replace w/ 5/8" denshield and hardi panels. not visible from street. 10x50 | $5,000 |
| Jun 24, 2019 | Completed final sign-off Aug 2024 | 725 Greenwich St | Bbc Construction Inc. | #300: demo only - non-bearing partition walls & half walls only. (e) t-bar ceiling & (e) lighting to remain.Details
#300: demo only - non-bearing partition walls & half walls only. (e) t-bar ceiling & (e) lighting to remain. | $3,000 |
| Jun 18, 2019 | Completed final sign-off Sep 2020 | 3063 Laguna St | Bbc Construction Inc. | to obtain final inspection for work approved under pa # 201711022982, 201703201869, and 201702078830. all work is completeDetails
to obtain final inspection for work approved under pa # 201711022982, 201703201869, and 201702078830. all work is complete | |
| May 24, 2019 | Completed final sign-off Sep 2019 | 1820 Union St | Bbc Construction Inc. | remove (e) t-111 siding at rear of building that has deteriorated and replace with (n) hardiplank siding. this includes all areas at the middle courtyard - approximately 1000 sq ftDetails
remove (e) t-111 siding at rear of building that has deteriorated and replace with (n) hardiplank siding. this includes all areas at the middle courtyard - approximately 1000 sq ft | $15,000 |
| May 24, 2019 | Completed final sign-off Sep 2019 | 2 Portola Dr | Bbc Construction Inc. | remodel existing kitchen - new appliances, cabinets. no walls relocatedDetails
remodel existing kitchen - new appliances, cabinets. no walls relocated | $20,000 |
| Apr 9, 2019 | Expired or cancelled cancelled Jan 2026 | 3063 Laguna St | Bbc Construction Inc. | rebuild front entry stairs with new solid stairs (stone)Details
rebuild front entry stairs with new solid stairs (stone) | $12,000 |
| Jan 11, 2019 | Completed final sign-off May 2019 | 2712 Webster St | Bbc Construction Inc. | to obtain final inspection for work approved under pa # 201409035324. all work is completeDetails
to obtain final inspection for work approved under pa # 201409035324. all work is complete | |
| Jan 3, 2019 | Completed final sign-off Feb 2019 | 2100 Pacific Av | Bbc Construction Inc. | 6a: repalce cabinets and lightings in entry hallDetails
6a: repalce cabinets and lightings in entry hall | $30,000 |
| Dec 6, 2018 | Completed final sign-off Feb 2019 | 2100 Webster St | Bbc Construction Inc. | small t.i. (4) new cabinets, countertop & sink, (1) new cabinet no sink, (3) rooms new flooring, (3) led wall washers,(5) led under cab strip lights, new & relocated sinage painting, ref pa #'s 201101108141 & 20112134131 for tolietsDetails
small t.i. (4) new cabinets, countertop & sink, (1) new cabinet no sink, (3) rooms new flooring, (3) led wall washers,(5) led under cab strip lights, new & relocated sinage painting, ref pa #'s 201101108141 & 20112134131 for toliets | $50,000 |
| Nov 14, 2018 | Completed final sign-off Jul 2019 | 3323 Clay St | Bbc Construction Inc. | install new gas fire place and bookshelves in family room. kithcen-replace existing cooktop with new range. kitchen- replace 6 existing cabinets.Details
install new gas fire place and bookshelves in family room. kithcen-replace existing cooktop with new range. kitchen- replace 6 existing cabinets. | $25,000 |
| Nov 14, 2018 | Completed final sign-off Jun 2019 | 3323 Clay St | Bbc Construction Inc. | replacement at the main stairway guardrails, balustrade, and newel post.Details
replacement at the main stairway guardrails, balustrade, and newel post. | $15,000 |
| Oct 18, 2018 | Completed final sign-off Aug 2019 | 326 Eureka St | Bbc Construction Inc. | lower unit - enlarge (e) opening from entry hall to living room to 5'; master bed room -relocate door & add ceiling light & add closet; re-activate (e) pocket door between bedroomm & lving.Details
lower unit - enlarge (e) opening from entry hall to living room to 5'; master bed room -relocate door & add ceiling light & add closet; re-activate (e) pocket door between bedroomm & lving. | $15,000 |
| Jul 27, 2018 | Completed final sign-off Dec 2018 | 239 Castro St | Bbc Construction Inc. | sfd remodel, (n) structural opening between (e) kitchen and (e) dining rm, (n) lighting, (n) cabinetry, (n) finishes at new opening. replace decking boards at rear deckDetails
sfd remodel, (n) structural opening between (e) kitchen and (e) dining rm, (n) lighting, (n) cabinetry, (n) finishes at new opening. replace decking boards at rear deck | $22,000 |
| Jun 29, 2018 | Completed final sign-off Jun 2019 | 3 Russian Hill Pl | Bbc Construction Inc. | revision to pa 2018-0607-1295 to include new elevator relocate laundry room. reconfigure lower staircases, relocate washer/dryer and misc interior work. convert bed #3 into media roomDetails
revision to pa 2018-0607-1295 to include new elevator relocate laundry room. reconfigure lower staircases, relocate washer/dryer and misc interior work. convert bed #3 into media room | $110,000 |
| Jun 7, 2018 | Completed final sign-off Jun 2019 | 3 Russian Hill Pl | Bbc Construction Inc. | remodel kitchen & (3) bathrooms, no structural work, no wall changes.Details
remodel kitchen & (3) bathrooms, no structural work, no wall changes. | $135,000 |
| Nov 2, 2017 | Completed final sign-off Jul 2019 | 3063 Laguna St | Bbc Construction Inc. | revision to permit 201612144995/201702078830/201708245789. siding repair due to dry rot, remove 1200 sf of siding, install (n) 1/2" plywood, paper, siding to match existing - all on south side of building slightly visible from street.Details
revision to permit 201612144995/201702078830/201708245789. siding repair due to dry rot, remove 1200 sf of siding, install (n) 1/2" plywood, paper, siding to match existing - all on south side of building slightly visible from street. | $6,500 |
| Aug 24, 2017 | Expired or cancelled expired Sep 2022 | 3063 Laguna St | Bbc Construction Inc. | revision to app#201612144995/201702078830/201703201869. replace extg rear stair in-kind, replace 3 windows in like kind, replace extg t-111 siding with new siding to match extg, repair dryrot framing, repair slab on grade condition at rear. confirm one residential unit.Details
revision to app#201612144995/201702078830/201703201869. replace extg rear stair in-kind, replace 3 windows in like kind, replace extg t-111 siding with new siding to match extg, repair dryrot framing, repair slab on grade condition at rear. confirm one residential unit. | $14,000 |
| Aug 10, 2017 | Completed final sign-off Sep 2018 | 2720 Taylor St | Bbc Construction Inc. | #320: interior office ti. selective demo of(e) partitions new doors and sidelites. new millwork, mep under sep permit. maherDetails
#320: interior office ti. selective demo of(e) partitions new doors and sidelites. new millwork, mep under sep permit. maher | $54,375 |
| Jul 20, 2017 | Completed final sign-off Jun 2018 | 3536 Jackson St | Bbc Construction Inc. | replace (e) kitchen w/ new cabinets, counter, flooring, lighting per code; fisxtures & fittins, new sink & applicnaces. (e)kitchen demoed by insurance co demo team, (e) sub-zero fridge, cooktops and double oven.Details
replace (e) kitchen w/ new cabinets, counter, flooring, lighting per code; fisxtures & fittins, new sink & applicnaces. (e)kitchen demoed by insurance co demo team, (e) sub-zero fridge, cooktops and double oven. | $80,000 |
| May 15, 2017 | Completed final sign-off Mar 2018 | 2326 Union St | Bbc Construction Inc. | new internal stair between 1st and 2nd fl. new master bath. new lighting. no additional conditioned space or exterior changesDetails
new internal stair between 1st and 2nd fl. new master bath. new lighting. no additional conditioned space or exterior changes | $68,000 |
| Mar 20, 2017 | Completed final sign-off Sep 2022 | 3063 Laguna St | Bbc Construction Inc. | revision to 201612144995 and 201702078830. add powder room to scope of work. no structural work req 2fl apt. reconfigure bathroom 1 and 2, remove closet in bedroom #2, add hall access to bedroom #2.Details
revision to 201612144995 and 201702078830. add powder room to scope of work. no structural work req 2fl apt. reconfigure bathroom 1 and 2, remove closet in bedroom #2, add hall access to bedroom #2. | $2,500 |
| Feb 7, 2017 | Completed final sign-off Sep 2022 | 3063 Laguna St | Bbc Construction Inc. | revision to 201612144995 relocate bathroom to s. corner, remove wall to enlarge kitchen, replace bathroom wiring with new romex, replace subpanel, replace 20(e) windows - all in kind, max u-factor 0.32, replace fireplace with new gas insert fireplaceDetails
revision to 201612144995 relocate bathroom to s. corner, remove wall to enlarge kitchen, replace bathroom wiring with new romex, replace subpanel, replace 20(e) windows - all in kind, max u-factor 0.32, replace fireplace with new gas insert fireplace | $20,000 |
| Jan 11, 2017 | Completed final sign-off Mar 2017 | 2744 Green St | Bbc Construction Inc. | remodel bathroom in apt #1. replace (e) with (n) with humidistat, min light to be high efficacy.Details
remodel bathroom in apt #1. replace (e) with (n) with humidistat, min light to be high efficacy. | $12,000 |
| Dec 19, 2016 | Completed final sign-off Feb 2017 | 111 Page St | Bbc Construction Inc. | revision to app#201610069715 to permanantly remove rear fire escape per approval of sffd. also related to app#201509025901 and 201509025899Details
revision to app#201610069715 to permanantly remove rear fire escape per approval of sffd. also related to app#201509025901 and 201509025899 | |
| Dec 14, 2016 | Expired or cancelled expired Sep 2022 | 3063 Laguna St | Bbc Construction Inc. | remodel (e)kitchen and (e)bathroom in 2nd flr unit, no walls to be altered.Details
remodel (e)kitchen and (e)bathroom in 2nd flr unit, no walls to be altered. | $38,000 |
| Nov 9, 2016 | Never finaled issued Nov 2016, no final | 111 Page St | Bbc Construction Inc. | to obtain final inspection for work approved under pa 200205317935; all work is complete (fire dept sign off required for final)Details
to obtain final inspection for work approved under pa 200205317935; all work is complete (fire dept sign off required for final) | |
| Oct 6, 2016 | Completed final sign-off Feb 2017 | 111 Page St | Bbc Construction Inc. | rear elevation at rose st: dry rot repairs and new window replacement in-kind with fiberglass double hung. remove fire escape for repairs and re-install when complete. remove and reinstall stucco inkind; addendum to permit 201-0902-5901 and 2015-0902-5899.mx factor 0.32Details
rear elevation at rose st: dry rot repairs and new window replacement in-kind with fiberglass double hung. remove fire escape for repairs and re-install when complete. remove and reinstall stucco inkind; addendum to permit 201-0902-5901 and 2015-0902-5899.mx factor 0.32 | $25,000 |
| May 18, 2016 | Completed final sign-off Feb 2017 | 111 Page St | Bbc Construction Inc. | commercial - mandatory soft story retrofit. revision to pa 2015-0902-5901 in order to clarify the full scope of accessibility improvments requred by the mayor's office on disability in their enforcement of the 2010 ada standards and the ca bldg code.Details
commercial - mandatory soft story retrofit. revision to pa 2015-0902-5901 in order to clarify the full scope of accessibility improvments requred by the mayor's office on disability in their enforcement of the 2010 ada standards and the ca bldg code. | |
| May 18, 2016 | Completed final sign-off Feb 2017 | 111 Page St | Bbc Construction Inc. | residential - mandatory soft story retrofit. revision to pa 2015-0902-5899 in order to clarify the full scope of accessibility improvments requred by the mayor's office on disability in their enforcement of the 2010 ada standards and the ca bldg code.Details
residential - mandatory soft story retrofit. revision to pa 2015-0902-5899 in order to clarify the full scope of accessibility improvments requred by the mayor's office on disability in their enforcement of the 2010 ada standards and the ca bldg code. | |
| Apr 4, 2016 | Completed final sign-off May 2016 | 602 Funston Av | Bbc Construction Inc. | reconfigure sunroom/master bedroom, install light in closet.Details
reconfigure sunroom/master bedroom, install light in closet. | $1,200 |
| Feb 3, 2016 | Completed final sign-off Aug 2016 | 27 Scott St | Bbc Construction Inc. | widen (e) driveway by 2'6" +/-, with new retaining wall, less than 3'Details
widen (e) driveway by 2'6" +/-, with new retaining wall, less than 3' | $6,000 |
| Oct 13, 2015 | Completed final sign-off Dec 2015 | 1474 06th Av | Bbc Construction Inc. | remove and replace damaged second floor stucco at front elevation with stucco in kind.Details
remove and replace damaged second floor stucco at front elevation with stucco in kind. | $6,000 |
| Jul 1, 2015 | Completed final sign-off Jan 2016 | 1245 Folsom St | Bbc Construction Inc. | install new acoust. panels on ceiling. remove old and install new light fixtures. install pre-fab walls and doors and room divider. n/a mahner.Details
install new acoust. panels on ceiling. remove old and install new light fixtures. install pre-fab walls and doors and room divider. n/a mahner. | $50,000 |
| Mar 13, 2015 | Completed final sign-off Jun 2015 | 2720 Taylor St | Bbc Construction Inc. | suite 430, (4th floor): office t.i. with limited demo. build back of new office spaces, including mechanical, electrical and plumbing as deferred submittal. maher n/a.Details
suite 430, (4th floor): office t.i. with limited demo. build back of new office spaces, including mechanical, electrical and plumbing as deferred submittal. maher n/a. | $107,000 |
| Jan 12, 2015 | Completed final sign-off Jun 2015 | 595 12th Av | Bbc Construction Inc. | manditory soft story per structural plans provided ie cbc chapter a 2009 ibc asc 41-06 fema report p-807Details
manditory soft story per structural plans provided ie cbc chapter a 2009 ibc asc 41-06 fema report p-807 | $195,000 |
| Dec 8, 2014 | Completed final sign-off Jan 2015 | 143 08th St | Bbc Construction Inc. | 1/f - rev. to permit 201410169065- add 2 walls to create 8' x 14' officeDetails
1/f - rev. to permit 201410169065- add 2 walls to create 8' x 14' office | $3,000 |
| Nov 21, 2014 | Completed final sign-off May 2015 | 1158 Page St | Bbc Construction Inc. | replace three existing windows on front elevation with new insulated units in kind. u-factor 0.29 fiberglass unit. new siding installed around windows horizontal hardiplank siding. n/a maher ordinance # 155-13Details
replace three existing windows on front elevation with new insulated units in kind. u-factor 0.29 fiberglass unit. new siding installed around windows horizontal hardiplank siding. n/a maher ordinance # 155-13 | $8,000 |
| Nov 17, 2014 | Completed final sign-off Apr 2015 | 29 Scott St | Bbc Construction Inc. | (2)replace windows on side with wood and sliding glass door replacement on rear with clad; remodel bathrrom in upstairs unit. (n) bathrrom at upstairs unit.Details
(2)replace windows on side with wood and sliding glass door replacement on rear with clad; remodel bathrrom in upstairs unit. (n) bathrrom at upstairs unit. | $25,000 |
| Oct 17, 2014 | Completed final sign-off Nov 2014 | 2065 Oakdale Av | Bbc Construction Inc. | omit from scope of work - canopy at entry door and associated special inspections. revision appl. #2013.1119.2265. maher n/a.Details
omit from scope of work - canopy at entry door and associated special inspections. revision appl. #2013.1119.2265. maher n/a. | |
| Oct 16, 2014 | Completed final sign-off Jan 2015 | 143 08th St | Bbc Construction Inc. | tenant improvement ti include demolition of interior partitions and relocation of door/frame 1/2nd fl. n/a maher ordinance 155-13Details
tenant improvement ti include demolition of interior partitions and relocation of door/frame 1/2nd fl. n/a maher ordinance 155-13 | |
| Mar 11, 2014 | Completed final sign-off Mar 2014 | 501 Delancey St | Bbc Construction Inc. | replace existing kitchen countertopsDetails
replace existing kitchen countertops | $1,250 |
| Mar 10, 2014 | Completed final sign-off Mar 2014 | 501 Delancey St | Bbc Construction Inc. | revision to approved plans, pa# 2013-1219-4613 as follows: a) show scope of work at lower apt # 509 (soffit) for bedroom at plumbing at #608. b) exterior door at #608 to remainDetails
revision to approved plans, pa# 2013-1219-4613 as follows: a) show scope of work at lower apt # 509 (soffit) for bedroom at plumbing at #608. b) exterior door at #608 to remain | $65,000 |
| Feb 20, 2014 | Completed final sign-off Jun 2014 | 2820 Sacramento St | Bbc Construction Inc. | voluntary structurred strengthening. bolting and plywood at garage level. 5/8" all thread bolts, 7" embedment, 32" oc w/1/4" 4" sq washers. set w/simpson spe poxy, ply 1/2" structure 1 w/10d at 4 inch oc, 12"oc field.Details
voluntary structurred strengthening. bolting and plywood at garage level. 5/8" all thread bolts, 7" embedment, 32" oc w/1/4" 4" sq washers. set w/simpson spe poxy, ply 1/2" structure 1 w/10d at 4 inch oc, 12"oc field. | $3,500 |
| Dec 24, 2013 | Completed final sign-off Jan 2014 | 901 Brannan St | Bbc Construction Inc. | lighting & title 24 info, ref #201309035780 and 201309308066, compliance iwth ordinance # 155-13 not required excavation <50 cu ydDetails
lighting & title 24 info, ref #201309035780 and 201309308066, compliance iwth ordinance # 155-13 not required excavation <50 cu yd | $30,000 |
| Dec 20, 2013 | Completed final sign-off May 2014 | 1207 Arguello Bl | Bbc Construction Inc. | convert an existing bedroom into a new bathroom, refurbish an existing bathroom, adding one toilet, refurbish the existing kitchen, enlarge the openings in 2 interior walls at the kitchenDetails
convert an existing bedroom into a new bathroom, refurbish an existing bathroom, adding one toilet, refurbish the existing kitchen, enlarge the openings in 2 interior walls at the kitchen | $52,000 |
| Dec 20, 2013 | Completed final sign-off May 2014 | 1209 Arguello Bl | Bbc Construction Inc. | convert an existing bedroom into a new bathroom, refurbish an existing bathroom, adding one toilet, refurbish the existing kitchen, enlarge the openings in 2 interior walls at the kitchenDetails
convert an existing bedroom into a new bathroom, refurbish an existing bathroom, adding one toilet, refurbish the existing kitchen, enlarge the openings in 2 interior walls at the kitchen | $55,000 |
| Dec 19, 2013 | Completed final sign-off Mar 2014 | 501 Delancey St | Bbc Construction Inc. | renovate units 608 & 609 to allow for bathroom for accessibilty. mep to be design build. gross floor area reduced in unit 609 is less than 25% of total area. not combining units. (combine (2) restroom to make (1) restroom.) all work in building #9.Details
renovate units 608 & 609 to allow for bathroom for accessibilty. mep to be design build. gross floor area reduced in unit 609 is less than 25% of total area. not combining units. (combine (2) restroom to make (1) restroom.) all work in building #9. | $65,000 |
| Dec 16, 2013 | Completed final sign-off Nov 2014 | 2065 Oakdale Av | Bbc Construction Inc. | to erect electric wall signDetails
to erect electric wall sign | $800 |
| Nov 19, 2013 | Completed final sign-off Nov 2014 | 2065 Oakdale Av | Bbc Construction Inc. | construct extended parapet @ partial perimeter wall, add canopy over door.Details
construct extended parapet @ partial perimeter wall, add canopy over door. | $5,000 |
| Oct 10, 2013 | Completed final sign-off Oct 2013 | 2265 03rd St | Bbc Construction Inc. | to correct adderss on permit # 201308235143 & 201309045930, from 2255 03rd st. to 2265 03rd st.Details
to correct adderss on permit # 201308235143 & 201309045930, from 2255 03rd st. to 2265 03rd st. | |
| Sep 30, 2013 | Completed final sign-off Jan 2014 | 901 Brannan St | Bbc Construction Inc. | construct non-bearing display wall in (e) showroom, construct architectural soffit.Details
construct non-bearing display wall in (e) showroom, construct architectural soffit. | $10,000 |
| Sep 11, 2013 | Completed final sign-off Jan 2014 | 2021 Pacific Av | Bbc Construction Inc. | repair dryrot and waterproof membrane at garage roof deck and at entry stairs. replace wood steps with wood "in kind" to match existing steps. repair is less than 50%Details
repair dryrot and waterproof membrane at garage roof deck and at entry stairs. replace wood steps with wood "in kind" to match existing steps. repair is less than 50% | $15,000 |
| Sep 4, 2013 | Completed final sign-off Oct 2013 | 2255 03rd St | Bbc Construction Inc. | electrical, hvac, plumbing plans for 201308235143Details
electrical, hvac, plumbing plans for 201308235143 | |
| Sep 3, 2013 | Completed final sign-off Dec 2016 | 901 Brannan St | Bbc Construction Inc. | an accessibility upgrade including new accessible van parking stall with loading/unloading accessibility aisle. accssibility route of travel and 2 single occupancy restrooms to meet ada and california requirementsDetails
an accessibility upgrade including new accessible van parking stall with loading/unloading accessibility aisle. accssibility route of travel and 2 single occupancy restrooms to meet ada and california requirements | $55,000 |
| Aug 30, 2013 | Completed final sign-off Dec 2013 | 2720 Taylor St | Bbc Construction Inc. | interior office tenant improvement-demo of (e) office partitions, build back of new partitions. relocation of (e) lighting & elecrical. work at 1st and 4th floor.Details
interior office tenant improvement-demo of (e) office partitions, build back of new partitions. relocation of (e) lighting & elecrical. work at 1st and 4th floor. | $97,200 |
| Aug 29, 2013 | Completed final sign-off Sep 2013 | 40 Hotaling Pl | Bbc Construction Inc. | revision to 201303202676. kitchenette with sink, dishwasher, and 2 refrigerators to be removed. new break arear at same locationDetails
revision to 201303202676. kitchenette with sink, dishwasher, and 2 refrigerators to be removed. new break arear at same location |