Michael Dern
- Listed as
- architect
- Firm
- Dern Architecture+Development
- On San Francisco permits
- Mar 2009 to Jun 2025
13 permits since 2000 (architect on 13 permits): 11 completed, 1 never finaled, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 17, 2025 | Completed final sign-off Dec 2025 | 3251 20th Av | Family Builders Inc | space #156 interior tenant improvement. selective demolition of non structural & finishes. provide new food preparation equipment & shelving. new sales counter. electrical scope limited to 3 new counter receptacles.Details
space #156 interior tenant improvement. selective demolition of non structural & finishes. provide new food preparation equipment & shelving. new sales counter. electrical scope limited to 3 new counter receptacles. | $100,000 |
| Nov 15, 2022 | Completed final sign-off Nov 2023 | 1 Florence St | The G B Group Inc. | window replacement 0f 22 windows and 5 sliding doors-anderson e-series fiberglass windows and doors. remove and replace stucco to match west elev. 2063 sq/ft, east elev. 538 sq/ft, south elev. 1530 sqft. tactical flashing/counter flash deck to wall, door pan.Details
window replacement 0f 22 windows and 5 sliding doors-anderson e-series fiberglass windows and doors. remove and replace stucco to match west elev. 2063 sq/ft, east elev. 538 sq/ft, south elev. 1530 sqft. tactical flashing/counter flash deck to wall, door pan. | $500,000 |
| Jan 29, 2016 | Completed final sign-off Jun 2016 | 353 King St | Fairview Restoration Inc. | g/f suite 176 -interior partition walls for new entry area, new epoxy floor, new washer and dryer at toilet room, new acoustical gyp bd ceiling, new exhaust fan, for dog day care use. maher not reqDetails
g/f suite 176 -interior partition walls for new entry area, new epoxy floor, new washer and dryer at toilet room, new acoustical gyp bd ceiling, new exhaust fan, for dog day care use. maher not req | $20,000 |
| May 14, 2015 | Completed final sign-off Jan 2017 | 1221 14th Av | Nielsen Aire Construction | legalization of dwelling unit of 598 sq. ft. at ground floor level, 2 bedroom, living room, kitchen and bathroom (unit legalization ordinance 43-14)Details
legalization of dwelling unit of 598 sq. ft. at ground floor level, 2 bedroom, living room, kitchen and bathroom (unit legalization ordinance 43-14) | $2,000 |
| Dec 9, 2014 | Never finaled issued Dec 2014, no final | 724 Ellis St | select demo of exterior. removal of awning and light fixtures. interior demo of existing finishes, non bearing walls, plumbing, elec. all plumbing to be capped at wall, rlec taken back to existing panel locationsDetails
select demo of exterior. removal of awning and light fixtures. interior demo of existing finishes, non bearing walls, plumbing, elec. all plumbing to be capped at wall, rlec taken back to existing panel locations | $3,700 | |
| Sep 27, 2013 | Completed final sign-off Oct 2013 | 505 Beach St | European Enterprises | adding natural gas generation for bldg electrical back up power for sump pump "voluntary" back up generator. refer app#201303061660Details
adding natural gas generation for bldg electrical back up power for sump pump "voluntary" back up generator. refer app#201303061660 | $5,000 |
| May 30, 2013 | Completed final sign-off Oct 2013 | 270 King St | Chbc Investement Inc | new tenant improvement w/men's /women's single toilet rooms, new hvac, electrical & plumbing, new work space & kitchenette. convert single door & side light to double door set. sprinkler & fire alarm revisions under separate application.Details
new tenant improvement w/men's /women's single toilet rooms, new hvac, electrical & plumbing, new work space & kitchenette. convert single door & side light to double door set. sprinkler & fire alarm revisions under separate application. | $250,000 |
| Apr 1, 2013 | Completed final sign-off May 2013 | 2 Embarcadero Center | Eric F Anderson Incorporated | 2nd floor lobby-demolish (e) cabinetry, some floor tile, add new walls, new quarry tile, new cabinetry, new restaurant equipment. electrical & plumbing re-work, new type 2 hood & new finshes, paint. add window graphics at exterior.Details
2nd floor lobby-demolish (e) cabinetry, some floor tile, add new walls, new quarry tile, new cabinetry, new restaurant equipment. electrical & plumbing re-work, new type 2 hood & new finshes, paint. add window graphics at exterior. | $150,000 |
| Mar 6, 2013 | Completed final sign-off Oct 2013 | 505 Beach St | Tritek Construction Inc., European Enterprises | new restaurant on basement level, raise interior floor to make level, new framing, plumbing, electrical, mechanical for interior. new outdoor dining area and excavation of existing soil at north east corner. new civil and landscape work for outdoor dining, sewer lateral tie in. new storefront,Details
new restaurant on basement level, raise interior floor to make level, new framing, plumbing, electrical, mechanical for interior. new outdoor dining area and excavation of existing soil at north east corner. new civil and landscape work for outdoor dining, sewer lateral tie in. new storefront, | $800,000 |
| Oct 20, 2010 | Completed final sign-off Jan 2011 | 1390 Market St | Tritek Construction Inc. | unit 110: new restaurant within 900 sf tenant space. new casework, prep areas for food service dining area, n storefront, non load bearing partitions- mep, sp and fire alarm separate permitsDetails
unit 110: new restaurant within 900 sf tenant space. new casework, prep areas for food service dining area, n storefront, non load bearing partitions- mep, sp and fire alarm separate permits | $50,000 |
| Sep 27, 2010 | Completed final sign-off Jun 2011 | 314 11th St | Worker Bees | remodel men's toilet room and 20% ada upgrade to be used for women's toilet room.Details
remodel men's toilet room and 20% ada upgrade to be used for women's toilet room. | $5,000 |
| Nov 25, 2009 | Expired or cancelled expired Nov 2011 | 500 Post St | tenant improvment of a conference room. minor wall demo and ceiling demo. new wall framing, electrical, mechanical, fire sprinkler, relocation. new ceiling tile and gridDetails
tenant improvment of a conference room. minor wall demo and ceiling demo. new wall framing, electrical, mechanical, fire sprinkler, relocation. new ceiling tile and grid | $8,500 | |
| Mar 12, 2009 | Completed final sign-off Aug 2009 | 22 Perego Tr | new deck above existing garden area, to comply w/ nov 200990741, fence along property line with 24 perego terrace.Details
new deck above existing garden area, to comply w/ nov 200990741, fence along property line with 24 perego terrace. | $6,500 |