May Tsai
- Listed as
- architect
- Firm
- Tsai Architecture
- Based in
- San Francisco
- On San Francisco permits
- Dec 2005 to Apr 2009
4 permits since 2000 (architect on 4 permits): 4 completed.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 7, 2009 | Completed final sign-off Jul 2009 | 441 41st Av | interior renovation of lower level (ground) including new bedroom, study, bathroom & laundry room. relocate (e) furnace & water heater, replace (e) rear windows w/new door.Details
interior renovation of lower level (ground) including new bedroom, study, bathroom & laundry room. relocate (e) furnace & water heater, replace (e) rear windows w/new door. | $25,000 | |
| Oct 1, 2007 | Completed final sign-off May 2009 | 2 Macedonia St | addition of (e) exterior space for (n) interior stair and entry space. reconfigure 1st fl. rooms for (n) entry, bath, bedroom and parlor. extend (e) garage to align w/ fl. above for structural staility of (e) 2nd fl. reconfigures 2nd fl. for open plan living/kit/din space w/ centralized fireplace,Details
addition of (e) exterior space for (n) interior stair and entry space. reconfigure 1st fl. rooms for (n) entry, bath, bedroom and parlor. extend (e) garage to align w/ fl. above for structural staility of (e) 2nd fl. reconfigures 2nd fl. for open plan living/kit/din space w/ centralized fireplace, | $780,000 | |
| Sep 21, 2007 | Completed final sign-off Mar 2008 | 25 Milton St | Stein Casey Inc | reduce size of (e) 2nd floor deck, connect to garden level w (n) stair (n) deck on ground level.Details
reduce size of (e) 2nd floor deck, connect to garden level w (n) stair (n) deck on ground level. | $25,000 |
| Dec 28, 2005 | Completed final sign-off Nov 2006 | 52 Cumberland St | renovate e basemento with bedroos, storage room, bathroom, family room, renovate e ground floor bathroom and kitchen, add stair to connect floorsDetails
renovate e basemento with bedroos, storage room, bathroom, family room, renovate e ground floor bathroom and kitchen, add stair to connect floors | $85,000 |