Matt Stromberg
- Listed as
- architect
- Firm
- Stromberg Architect
- Based in
- Berkeley
- On San Francisco permits
- Mar 2014 to Mar 2020
5 permits since 2000 (architect on 5 permits): 4 completed, 1 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 11, 2020 | Completed final sign-off Dec 2021 | 1412 Van Ness Av | Rod Heisler Construction | 9459 sq ft interior only. t.i @ 1st floor only. ada comliant bathrooms and changing rooms, modification of existing lighting mechanical, electrical, and plumbing interior finishes. chnage of use from design school back to retail space and services.Details
9459 sq ft interior only. t.i @ 1st floor only. ada comliant bathrooms and changing rooms, modification of existing lighting mechanical, electrical, and plumbing interior finishes. chnage of use from design school back to retail space and services. | $650,000 |
| Apr 3, 2019 | Never finaled issued Jun 2019, no final | 1830 17th St | Aquamatic Fire Protection | install new overhead sprinkler system. begin @ (e) underground. modify existing. stubbed into riser room. install new back flow preventer. reconnect the wall mounted fdc. install new riser control assembly supplying new overhead wet pipe fire sprinkler system for 2 story building. 99 heads.Details
install new overhead sprinkler system. begin @ (e) underground. modify existing. stubbed into riser room. install new back flow preventer. reconnect the wall mounted fdc. install new riser control assembly supplying new overhead wet pipe fire sprinkler system for 2 story building. 99 heads. | $59,900 |
| Sep 20, 2018 | Completed final sign-off Feb 2021 | 1830 17th St | Oliver & Company Inc. | remodel of (e) 2 story building. no change of use. no historic re source. partial roof collapse & notice of violation #201845721 & correction notice require full roof replacement. update interior spaces & accessibility upgrade and include.Details
remodel of (e) 2 story building. no change of use. no historic re source. partial roof collapse & notice of violation #201845721 & correction notice require full roof replacement. update interior spaces & accessibility upgrade and include. | $1,000,000 |
| May 26, 2015 | Completed final sign-off Apr 2018 | 536 Parker Av | Vince Boley General Contractor | horizontal residential addtion @ top floor. (n) elevator from grade to top floor. rear of (e) bldg. (n) bathroom & deck @ 1st flr bedrooms. upstarts unit horizontal addition will have master suite & (n) kitchen.Details
horizontal residential addtion @ top floor. (n) elevator from grade to top floor. rear of (e) bldg. (n) bathroom & deck @ 1st flr bedrooms. upstarts unit horizontal addition will have master suite & (n) kitchen. | $200,000 |
| Mar 6, 2014 | Completed final sign-off Aug 2014 | 489 06th St | Oliver & Company Inc. | (n) peninsula wall & furred-out merchandise display walls & replacement led lights for display area w/in (e) showroom. compliance with ordinance #155-13 not requiredDetails
(n) peninsula wall & furred-out merchandise display walls & replacement led lights for display area w/in (e) showroom. compliance with ordinance #155-13 not required | $15,000 |