Matt Bailey
- Listed as
- authorized agent-others, contractor
- Firm
- Bailey General Contracting Co Inc
- Based in
- San Francisco
- On San Francisco permits
- Oct 2008 to Jul 2026
104 permits since 2000 (contractor on 104 permits, authorized agent-others on 1 permit): 83 completed, 4 in progress, 6 never finaled, 11 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. Their ranked record as a contractor is on their contractor page. How to read these records
Most recent permits
Showing the 100 most recent of 104.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 13, 2026 | In progress issued Jul 2026 | 8 Woodland Av | Bailey General Contracting Co Inc | water damage repairs, repair shettrock in living room, dining room, bedroom. no construction to be done. all work interior.Details
water damage repairs, repair shettrock in living room, dining room, bedroom. no construction to be done. all work interior. | $15,000 |
| May 8, 2026 | In progress issued May 2026 | 557 14th Av | Bailey General Contracting Co Inc | kitchen, bathroom, powder room remodel, replace cabinetry, appliances, in same locations. no structual work. update electrical and plumbing as needed.Details
kitchen, bathroom, powder room remodel, replace cabinetry, appliances, in same locations. no structual work. update electrical and plumbing as needed. | $100,000 |
| Feb 5, 2026 | Completed final sign-off Mar 2026 | 2920 Gough St | Bailey General Contracting Co Inc | replace (e) front wood casement sash windows (8) & front wood fixed sash wood (1) with new front wood insulated casement sashes (8) & front wood insulated fixed sash window (10. replace in kind. no changes in size or design. u-factor 0.27 max.Details
replace (e) front wood casement sash windows (8) & front wood fixed sash wood (1) with new front wood insulated casement sashes (8) & front wood insulated fixed sash window (10. replace in kind. no changes in size or design. u-factor 0.27 max. | $7,000 |
| Jan 9, 2026 | Completed final sign-off Jun 2026 | 72 Lake Forest Ct | Bailey General Contracting Co Inc | replace in-kind the front vinyl windows (2), and rear vinyl windows (2) with kolbe ultra series exterior aluminum clad and wood interior (4).Details
replace in-kind the front vinyl windows (2), and rear vinyl windows (2) with kolbe ultra series exterior aluminum clad and wood interior (4). | $25,000 |
| Jul 2, 2025 | Completed final sign-off Aug 2026 | 2007 09th Av | Bailey General Contracting Co Inc | remove / replace water damaged sheetrock on various interiror walls. ground level-remove and replace sheetrook in living rm, dining rm, and bedrm.Details
remove / replace water damaged sheetrock on various interiror walls. ground level-remove and replace sheetrook in living rm, dining rm, and bedrm. | $10,000 |
| Mar 27, 2025 | Completed final sign-off Aug 2026 | 2007 09th Av | Bailey General Contracting Co Inc | demo (e) bath at level 2 for (n) stairs to level 3. (n) bath at level 2. vertical addition at (e) roof level (level 3).Details
demo (e) bath at level 2 for (n) stairs to level 3. (n) bath at level 2. vertical addition at (e) roof level (level 3). | $250,000 |
| Mar 12, 2025 | Completed final sign-off Mar 2025 | 1501 Diamond St | Bailey General Contracting Co Inc | to obtain final inspection for work approved under pa#202301311032, 202305318932, 202202037261. all work is complete.Details
to obtain final inspection for work approved under pa#202301311032, 202305318932, 202202037261. all work is complete. | |
| Mar 12, 2025 | Completed final sign-off Mar 2025 | 1501 Diamond St | Bailey General Contracting Co Inc | to obtain final inspection for work approved under pa#202102255335, 202109178674, 202206277176. all work is complete.Details
to obtain final inspection for work approved under pa#202102255335, 202109178674, 202206277176. all work is complete. | |
| Mar 12, 2025 | Completed final sign-off Mar 2025 | 1501 Diamond St | Bailey General Contracting Co Inc | to obtain final inspection for work approved under pa#202210214940. all work is complete.Details
to obtain final inspection for work approved under pa#202210214940. all work is complete. | |
| Mar 12, 2025 | Completed final sign-off Mar 2025 | 1501 Diamond St | Bailey General Contracting Co Inc | to obtain final inspection for work approved under pa#202210063889, 202104128306, 202307273086. all work is complete.Details
to obtain final inspection for work approved under pa#202210063889, 202104128306, 202307273086. all work is complete. | |
| Mar 18, 2024 | In progress issued Apr 2024 | 2636 Green St | Bailey General Contracting Co Inc | structural revision to pa# 202312192746: roof pop-up strengthening due to wood rot and unsafe current conditions viewed during field investigation.Details
structural revision to pa# 202312192746: roof pop-up strengthening due to wood rot and unsafe current conditions viewed during field investigation. | $30,000 |
| Dec 19, 2023 | In progress issued Dec 2023 | 2636 Green St | Bailey General Contracting Co Inc | revision to 20201125f9732. adjust the structural members and framing to address the e field conditions and include new exterior pocket door and relocate storage door at e 4th fl storage. addpantry casework behind pocket door at existing 4th fl storage. add new oudoor bbq at 4th fl roof deck.Details
revision to 20201125f9732. adjust the structural members and framing to address the e field conditions and include new exterior pocket door and relocate storage door at e 4th fl storage. addpantry casework behind pocket door at existing 4th fl storage. add new oudoor bbq at 4th fl roof deck. | $25,000 |
| Dec 1, 2023 | Completed final sign-off Nov 2024 | 52 Surrey St | Bailey General Contracting Co Inc | replace in kind (9) front windows from pella lifesyle double hung interior wood exterior aluminum clad to marvin ulitmate insert double hung interior wood exterior aluminum cladDetails
replace in kind (9) front windows from pella lifesyle double hung interior wood exterior aluminum clad to marvin ulitmate insert double hung interior wood exterior aluminum clad | $50,000 |
| Sep 11, 2023 | Completed final sign-off Nov 2023 | 2920 Gough St | Bailey General Contracting Co Inc | voluntary lateral strengthening at the ground level.Details
voluntary lateral strengthening at the ground level. | $50,000 |
| Jul 27, 2023 | Expired or cancelled expired Mar 2025 | 1501 Diamond St | Bailey General Contracting Co Inc | revision to bpa#202210214940, change a couple of connection detailsDetails
revision to bpa#202210214940, change a couple of connection details | |
| Jul 24, 2023 | Completed final sign-off Nov 2023 | 52 Surrey St | Bailey General Contracting Co Inc | repair in kind rear siding dry rot. rear one window and one door replacement. approx. 150 sq ft of siding replacement. no structural work. call districtu building at start of work.Details
repair in kind rear siding dry rot. rear one window and one door replacement. approx. 150 sq ft of siding replacement. no structural work. call districtu building at start of work. | $10,000 |
| May 31, 2023 | Expired or cancelled expired Mar 2025 | 1501 Diamond St | Bailey General Contracting Co Inc | to comply with nov# 202307275. additional of mechanical enclosure at roof.Details
to comply with nov# 202307275. additional of mechanical enclosure at roof. | $5,000 |
| Feb 22, 2023 | Expired or cancelled cancelled Jan 2026 | 4437 23rd St | Bailey General Contracting Co Inc | interior remodel: convert 220 sf of () unconditioned space on the ground level to one conditioned bedroom and one conditioned bathroomDetails
interior remodel: convert 220 sf of () unconditioned space on the ground level to one conditioned bedroom and one conditioned bathroom | $50,000 |
| Jan 31, 2023 | Expired or cancelled expired Mar 2025 | 1501 Diamond St | Bailey General Contracting Co Inc | revise structure for previously approved exterior stair from l2 to roof deck. revision to permit #202109178674.Details
revise structure for previously approved exterior stair from l2 to roof deck. revision to permit #202109178674. | $30,000 |
| Oct 21, 2022 | Expired or cancelled expired Mar 2025 | 1501 Diamond St | Bailey General Contracting Co Inc | bakyard landscape and front porch remodel.Details
bakyard landscape and front porch remodel. | $15,000 |
| Oct 6, 2022 | Expired or cancelled expired Mar 2025 | 1501 Diamond St | Bailey General Contracting Co Inc | rev to pa202202037261: structural changes.Details
rev to pa202202037261: structural changes. | $10,000 |
| Jun 27, 2022 | Expired or cancelled expired Mar 2025 | 1501 Diamond St | Bailey General Contracting Co Inc | rev to pa 202109178674 to include structural details for roof deck.Details
rev to pa 202109178674 to include structural details for roof deck. | |
| Feb 3, 2022 | Expired or cancelled expired Mar 2025 | 1501 Diamond St | Bailey General Contracting Co Inc | 1) detached garage remodel. 2) new un-occupied vegetative roof over extg detatched garage. 3)garage door replacement. revision to permit pa#202104128306Details
1) detached garage remodel. 2) new un-occupied vegetative roof over extg detatched garage. 3)garage door replacement. revision to permit pa#202104128306 | $75,000 |
| Oct 14, 2021 | Completed final sign-off Mar 2023 | 355 Oak Park Dr | Bailey General Contracting Co Inc | (n) 230 sf deck, 2(n) windows & 2(n) doors @ rear. warren drive side of lot. 78 sf addition @ 1st level under (e) cantilever @ rear of residence. (n) bath and (n) half bath @ level 1. plumbing and electrical as reqDetails
(n) 230 sf deck, 2(n) windows & 2(n) doors @ rear. warren drive side of lot. 78 sf addition @ 1st level under (e) cantilever @ rear of residence. (n) bath and (n) half bath @ level 1. plumbing and electrical as req | $100,000 |
| Sep 17, 2021 | Expired or cancelled expired Mar 2025 | 1501 Diamond St | Bailey General Contracting Co Inc | new 400 sq feet roof deck, new exterior stair from l2 to roof deck and new ext to ext stair.Details
new 400 sq feet roof deck, new exterior stair from l2 to roof deck and new ext to ext stair. | $25,000 |
| Sep 3, 2021 | Completed final sign-off Dec 2023 | 52 Surrey St | Bailey General Contracting Co Inc | replace (e) brick foundation below the residence @ rear & laundry room. new backyard retaining wall & new concrete steps at rear yard.Details
replace (e) brick foundation below the residence @ rear & laundry room. new backyard retaining wall & new concrete steps at rear yard. | $150,000 |
| Jun 15, 2021 | Completed final sign-off Aug 2021 | 679 46th Av | Bailey General Contracting Co Inc | front stair repair -in kind. less than 50%Details
front stair repair -in kind. less than 50% | $10,000 |
| Apr 12, 2021 | Expired or cancelled expired Mar 2025 | 1501 Diamond St | Bailey General Contracting Co Inc | window replacement in kind. 20 windows total. (4 front, 4 rear, 12 sides). siding repair & replace in kind, ~2,000 sqft.Details
window replacement in kind. 20 windows total. (4 front, 4 rear, 12 sides). siding repair & replace in kind, ~2,000 sqft. | $160,000 |
| Feb 25, 2021 | Expired or cancelled expired Mar 2025 | 1501 Diamond St | Bailey General Contracting Co Inc | remodel in kind (2) lower level bathrooms. remodel in kind (1) lower wet bar. revision to pa# 202009093767.Details
remodel in kind (2) lower level bathrooms. remodel in kind (1) lower wet bar. revision to pa# 202009093767. | $100,000 |
| Nov 25, 2020 | Completed final sign-off Jul 2021 | 30 Mason St | Bailey General Contracting Co Inc | office remodel including replaceing the floor tiles, painting, replacing two existing sinks, replace light fixtures. vacant store front complaintDetails
office remodel including replaceing the floor tiles, painting, replacing two existing sinks, replace light fixtures. vacant store front complaint | $60,000 |
| Nov 25, 2020 | Never finaled issued Aug 2021, no final | 2636 Green St | D G M L Construction Inc, Bailey General Contracting Co Inc | remodel of (e) 4 story home. exterior: replace (e) windows and doors in kind. repair (e) siding and exterior finishes. remodel (e) roof deck at 4/f. interior: in-kind kitchen remodel. in-kind remodel of half bath at 2/f. in -kind remodel of 4 bathrooms. removal of half bath at 4th fl.Details
remodel of (e) 4 story home. exterior: replace (e) windows and doors in kind. repair (e) siding and exterior finishes. remodel (e) roof deck at 4/f. interior: in-kind kitchen remodel. in-kind remodel of half bath at 2/f. in -kind remodel of 4 bathrooms. removal of half bath at 4th fl. | $50,000 |
| Sep 9, 2020 | Completed final sign-off Mar 2025 | 1501 Diamond St | Bailey General Contracting Co Inc | main level kitchen remodel in kind. main level powder room remodel in kind. upper level bath master remodel in kind, upper level guest bath in kindDetails
main level kitchen remodel in kind. main level powder room remodel in kind. upper level bath master remodel in kind, upper level guest bath in kind | $295,000 |
| Feb 7, 2020 | Completed final sign-off Oct 2020 | 1140 Lawton St | Bailey General Contracting Co Inc | revisiont to pa 2020-0127-2849 structural improvement wall removalDetails
revisiont to pa 2020-0127-2849 structural improvement wall removal | $3,500 |
| Jan 27, 2020 | Completed final sign-off Oct 2020 | 1140 Lawton St | Bailey General Contracting Co Inc | revision to 201908229528 (kitchen remodel,windows), changes to windows. 3 in kind replacement, 2 new sizes and operable.Details
revision to 201908229528 (kitchen remodel,windows), changes to windows. 3 in kind replacement, 2 new sizes and operable. | |
| Dec 27, 2019 | Completed final sign-off Mar 2023 | 355 Oak Park Dr | Bailey General Contracting Co Inc | residential alterations including bathroom renovation, kitchen renovation, removal of flat ceilings, adding skylights, and roof structural upgrades. legalize gr fl family room and bathroomDetails
residential alterations including bathroom renovation, kitchen renovation, removal of flat ceilings, adding skylights, and roof structural upgrades. legalize gr fl family room and bathroom | $100,000 |
| Dec 17, 2019 | Never finaled issued Dec 2019, no final | 701 Union St | Bailey General Contracting Co Inc | street spaceDetails
street space | |
| Dec 9, 2019 | Completed final sign-off Aug 2022 | 230 Laidley St | Bailey General Contracting Co Inc | remodel of entry stair, addition of door to ground floor study/den & addition of awning to enter area.Details
remodel of entry stair, addition of door to ground floor study/den & addition of awning to enter area. | $94,000 |
| Sep 5, 2019 | Completed final sign-off Nov 2019 | 3330 16th St | Bailey General Contracting Co Inc | revision to 201709158532 soft storyDetails
revision to 201709158532 soft story | |
| Aug 22, 2019 | Completed final sign-off Oct 2020 | 1140 Lawton St | Bailey General Contracting Co Inc | 2nd flr kitchen remodel approx 200sf. exterior window replacement no noriz or vert expansions.Details
2nd flr kitchen remodel approx 200sf. exterior window replacement no noriz or vert expansions. | $75,000 |
| Jul 25, 2019 | Completed final sign-off Jan 2020 | 583 47th Av | Bailey General Contracting Co Inc | rev to pa 201510220473. extending ductwork less than 40ft.Details
rev to pa 201510220473. extending ductwork less than 40ft. | $2,500 |
| Jul 8, 2019 | Never finaled issued Jul 2019, no final | 3330 16th St | Bailey General Contracting Co Inc | street spaceDetails
street space | |
| May 23, 2019 | Completed final sign-off May 2019 | 1160 Green St | Bailey General Contracting Co Inc | rev to pa201709148106 - structural/framing; for mandatory soft-story retrofit for soft story mandate using iebc ch.a4.Details
rev to pa201709148106 - structural/framing; for mandatory soft-story retrofit for soft story mandate using iebc ch.a4. | $5,000 |
| Oct 16, 2018 | Completed final sign-off Jan 2020 | 135 Albion St | Bailey General Contracting Co Inc | soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4.Details
soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. | $35,000 |
| Oct 5, 2018 | Completed final sign-off Oct 2018 | 2443 Lombard St | Bailey General Contracting Co Inc | removal of non-permitted partitions & showers per notice of violation #201115323. maher n/a.Details
removal of non-permitted partitions & showers per notice of violation #201115323. maher n/a. | |
| Sep 12, 2018 | Completed final sign-off Jun 2020 | 3318 22nd St | Bailey General Contracting Co Inc | soft story retrofit to comply with sfebc 2016 ch 4d per 2016 cebc app a4 criteria. ref commercial pa #201809129802Details
soft story retrofit to comply with sfebc 2016 ch 4d per 2016 cebc app a4 criteria. ref commercial pa #201809129802 | $42,000 |
| Aug 21, 2018 | Completed final sign-off May 2025 | 49 Walter St | Bailey General Contracting Co Inc | soft story retrofit per sfebc chaper 4d: 2016 cebc appendix a-4Details
soft story retrofit per sfebc chaper 4d: 2016 cebc appendix a-4 | $20,000 |
| Aug 15, 2018 | Completed final sign-off Oct 2020 | 701 Union St | Bailey General Contracting Co Inc | commercial compliance with mandatory seismic retrofit per iebc chapter a4. disabled access upgrade at restaurant entrance and restroom triggered by soft story upgrade.Details
commercial compliance with mandatory seismic retrofit per iebc chapter a4. disabled access upgrade at restaurant entrance and restroom triggered by soft story upgrade. | $135,330 |
| Aug 15, 2018 | Completed final sign-off Oct 2020 | 701 Union St | Bailey General Contracting Co Inc | residential soft story retrofit per iebc chapter a4.Details
residential soft story retrofit per iebc chapter a4. | $214,000 |
| Jul 16, 2018 | Completed final sign-off Aug 2018 | 3870 Sacramento St | Bailey General Contracting Co Inc | revision to soft story bpa #201709158439 & #201709158444. shorten wall along line b. revised holdown detail. added footing detail.Details
revision to soft story bpa #201709158439 & #201709158444. shorten wall along line b. revised holdown detail. added footing detail. | |
| Apr 3, 2018 | Never finaled issued Apr 2018, no final | 529 Broderick St | Bailey General Contracting Co Inc | street spaceDetails
street space | |
| Apr 3, 2018 | Completed final sign-off Oct 2018 | 33 Tulane St | Bailey General Contracting Co Inc | kitchen remodel. replace fixtures in-kind. improve structural components of kitchen entrywayDetails
kitchen remodel. replace fixtures in-kind. improve structural components of kitchen entryway | $30,000 |
| Mar 2, 2018 | Completed final sign-off Aug 2018 | 89 Ventura Av | Bailey General Contracting Co Inc | revision to pa 2018-0206-0438 - install additional posts and hdu's on garage longitudinal walls for voluntary structural improvement.Details
revision to pa 2018-0206-0438 - install additional posts and hdu's on garage longitudinal walls for voluntary structural improvement. | $2,500 |
| Feb 23, 2018 | Completed final sign-off Jul 2019 | 4508 Balboa St | Pinkowski Construction, Bailey General Contracting Co Inc | remodel kitchen in-kind (no alteration of any walls)Details
remodel kitchen in-kind (no alteration of any walls) | $35,000 |
| Feb 15, 2018 | Completed final sign-off Jun 2019 | 2439 Lombard St | Bailey General Contracting Co Inc | residential: soft story retrofit per sfebc chapter 4d engineering criteria fema p-807. ref commercial #201802151361. maher n/Details
residential: soft story retrofit per sfebc chapter 4d engineering criteria fema p-807. ref commercial #201802151361. maher n/ | $168,000 |
| Feb 15, 2018 | Completed final sign-off Jun 2019 | 2439 Lombard St | Bailey General Contracting Co Inc | commercial: soft story retrofit per sfebc chapter 4d engineering criteria fema p-807. disabled access upgrades at commercial entrances. ref residential #201802151359. maher naDetails
commercial: soft story retrofit per sfebc chapter 4d engineering criteria fema p-807. disabled access upgrades at commercial entrances. ref residential #201802151359. maher na | $84,000 |
| Feb 6, 2018 | Completed final sign-off Aug 2018 | 89 Ventura Av | Bailey General Contracting Co Inc | voluntary structural improvement at ground floorDetails
voluntary structural improvement at ground floor | $45,000 |
| Jan 9, 2018 | Completed final sign-off Apr 2018 | 863 Haight St | Bailey General Contracting Co Inc | unit#4 bathroom remodel. replace all fixts in-kind. no fixts will be moved.Details
unit#4 bathroom remodel. replace all fixts in-kind. no fixts will be moved. | $25,000 |
| Dec 4, 2017 | Completed final sign-off Mar 2018 | 967 Filbert St | Ace Drilling & Excavation, Bailey General Contracting Co Inc | revised scope of work pa 2017-0623-0181 excavate install soldier pile retaining wall. drill & install piers in front of existing retaining walls. ace drilling & excavation osha # 889820. comply w/ nov#201627882Details
revised scope of work pa 2017-0623-0181 excavate install soldier pile retaining wall. drill & install piers in front of existing retaining walls. ace drilling & excavation osha # 889820. comply w/ nov#201627882 | $20,000 |
| Nov 30, 2017 | Completed final sign-off Feb 2019 | 47 Noe St | Bailey General Contracting Co Inc | soft story retrofit per sfebc chapter 4d:2016 cebc appendix a-4Details
soft story retrofit per sfebc chapter 4d:2016 cebc appendix a-4 | $50,000 |
| Sep 14, 2017 | Completed final sign-off Sep 2019 | 3541 Washington St | Bailey General Contracting Co Inc | soft story retrofit per sfebc chapter 4d, engineering criteria, 2016 cebc appendix a-4. no exterior work.Details
soft story retrofit per sfebc chapter 4d, engineering criteria, 2016 cebc appendix a-4. no exterior work. | $60,000 |
| Sep 14, 2017 | Completed final sign-off Sep 2019 | 3535 Washington St | Bailey General Contracting Co Inc | soft story retrofit per sfebc chapter 4d, engineering criteria, 2016 cebc appendix a-4. no exterior work.Details
soft story retrofit per sfebc chapter 4d, engineering criteria, 2016 cebc appendix a-4. no exterior work. | $60,000 |
| Sep 14, 2017 | Completed final sign-off May 2019 | 1158 Green St | Bailey General Contracting Co Inc | soft story retrofit per sfebc ch4d-2016 iebc appendex a-4.Details
soft story retrofit per sfebc ch4d-2016 iebc appendex a-4. | $80,000 |
| Sep 12, 2017 | Completed final sign-off Aug 2018 | 350 Noe St | Bailey General Contracting Co Inc | soft story retrofit using criteria sfebc chapter 4d 2016 cebc appendix a-4. n/a for maher.Details
soft story retrofit using criteria sfebc chapter 4d 2016 cebc appendix a-4. n/a for maher. | $45,000 |
| Aug 30, 2017 | Completed final sign-off Oct 2018 | 1322 04th Av | Bailey General Contracting Co Inc | soft story retrofit per sfebc chapter 4d per engineering creteria 2016 cebc appendix a-4.Details
soft story retrofit per sfebc chapter 4d per engineering creteria 2016 cebc appendix a-4. | $45,000 |
| Aug 24, 2017 | Completed final sign-off Dec 2017 | 737 06th Av | Bailey General Contracting Co Inc | #1 - bathroom remodel - replace all fixtures in kind; no fixtures will be moved.Details
#1 - bathroom remodel - replace all fixtures in kind; no fixtures will be moved. | $25,000 |
| Jul 21, 2017 | Completed final sign-off Sep 2017 | 3662 16th St | Bailey General Contracting Co Inc | to comply with nov 201408721 - front stair landing repair in kindDetails
to comply with nov 201408721 - front stair landing repair in kind | $20,000 |
| Jun 23, 2017 | Completed final sign-off Mar 2018 | 967 Filbert St | Ace Drilling & Excavation, Bailey General Contracting Co Inc | revised scope of work for pa #201605268457 - excavate & install soldier pile retaining wall instead of concrete retaining wall. ace drilling and excavation. osha #884820. to comply w/complaint #201627882.Details
revised scope of work for pa #201605268457 - excavate & install soldier pile retaining wall instead of concrete retaining wall. ace drilling and excavation. osha #884820. to comply w/complaint #201627882. | $20,000 |
| May 31, 2017 | Completed final sign-off Jan 2018 | 366 12th Av | Bailey General Contracting Co Inc | mandatory soft story retrofit of soft story mandate using fema p-807.Details
mandatory soft story retrofit of soft story mandate using fema p-807. | $85,000 |
| May 19, 2017 | Completed final sign-off Feb 2019 | 442 02nd Av | Bailey General Contracting Co Inc | seismic retrofit of soft story to comply with sfbc 4d mandatory seismic retrofit per 2016 iebc app a4Details
seismic retrofit of soft story to comply with sfbc 4d mandatory seismic retrofit per 2016 iebc app a4 | $100,000 |
| Mar 16, 2017 | Completed final sign-off Aug 2017 | 351 30th St | Bailey General Contracting Co Inc | exterior stair & landing repair. repair in kind per planDetails
exterior stair & landing repair. repair in kind per plan | $30,000 |
| Nov 14, 2016 | Completed final sign-off Jun 2017 | 1034 Guerrero St | Bailey General Contracting Co Inc | remodel two bathrooms in kind w/out moving any finish fixtures.Details
remodel two bathrooms in kind w/out moving any finish fixtures. | $70,000 |
| Sep 9, 2016 | Completed final sign-off Feb 2017 | 350 Noe St | Bailey General Contracting Co Inc | kitchen and bathroom remodel - replace in kind without moving any fixtures to different locations. n/a maherDetails
kitchen and bathroom remodel - replace in kind without moving any fixtures to different locations. n/a maher | $30,000 |
| Jul 8, 2016 | Completed final sign-off Feb 2017 | 355 Head St | Bailey General Contracting Co Inc | remodel kitchen - replace in-kind. open up entryway leading into kitchen by installing new beam & posts.Details
remodel kitchen - replace in-kind. open up entryway leading into kitchen by installing new beam & posts. | $30,000 |
| Jun 16, 2016 | Completed final sign-off Nov 2016 | 909 Bay St | Bailey General Contracting Co Inc | 1)kitchen remodel with out any fixtures being moved, enlarge entry way into kitchen by removing a wall. 2) bathroom remodel in kind with out moving any fixtures.Details
1)kitchen remodel with out any fixtures being moved, enlarge entry way into kitchen by removing a wall. 2) bathroom remodel in kind with out moving any fixtures. | $80,000 |
| May 26, 2016 | Never finaled issued Dec 2016, no final | 967 Filbert St | Ace Drilling & Excavation, Bailey General Contracting Co Inc | retaining wall design at rear of lot per plan.Details
retaining wall design at rear of lot per plan. | $5,000 |
| May 2, 2016 | Completed final sign-off Oct 2016 | 32 Melrose Av | Bailey General Contracting Co Inc | kitchen remodel in kind.Details
kitchen remodel in kind. | $30,000 |
| Mar 4, 2016 | Completed final sign-off Apr 2016 | 4430 25th St | Bailey General Contracting Co Inc | water damaged shower stall; new shower pan, new tile, new sub floor. shower stall specs will remain the same, no change in blue print.Details
water damaged shower stall; new shower pan, new tile, new sub floor. shower stall specs will remain the same, no change in blue print. | $10,000 |
| Mar 4, 2016 | Completed final sign-off Aug 2016 | 4351 17th St | Bailey General Contracting Co Inc | kitchen remodel - replace in kind and don't change locations of plumbing, cabinets or electrical.Details
kitchen remodel - replace in kind and don't change locations of plumbing, cabinets or electrical. | $25,000 |
| Feb 12, 2016 | Completed final sign-off Aug 2016 | 116 Delmar St | Bailey General Contracting Co Inc | voluntary ground floor retrofitDetails
voluntary ground floor retrofit | $100,000 |
| Oct 22, 2015 | Completed final sign-off Jan 2020 | 583 47th Av | Bailey General Contracting Co Inc | residential remodel, vertical addition of habitable 3rd level at the existing roof per sf information sheet no.fs-03 sprinklers not requiredDetails
residential remodel, vertical addition of habitable 3rd level at the existing roof per sf information sheet no.fs-03 sprinklers not required | $90,000 |
| Sep 30, 2015 | Completed final sign-off Mar 2016 | 777 20th Av | Bailey General Contracting Co Inc | bathroom remodel without moving any of the plumbing outlets. replace in kind. kitchen remodel without moving any of the plumibng outlets. replace in kind.Details
bathroom remodel without moving any of the plumbing outlets. replace in kind. kitchen remodel without moving any of the plumibng outlets. replace in kind. | $50,000 |
| Jul 17, 2015 | Completed final sign-off Jan 2016 | 109 Frederick St | Bailey General Contracting Co Inc | new bathroom at 1st fl unit in existing conditioned closet space. new window at east facadeDetails
new bathroom at 1st fl unit in existing conditioned closet space. new window at east facade | $30,000 |
| Feb 20, 2015 | Completed final sign-off Apr 2015 | 136 Carl St | Bailey General Contracting Co Inc | replacement of non historic windows with marvin tilt pacs double hung wood windows (27 in all, 21 of which face the street).replace in kind, the same size and location.Details
replacement of non historic windows with marvin tilt pacs double hung wood windows (27 in all, 21 of which face the street).replace in kind, the same size and location. | $25,000 |
| Feb 4, 2015 | Completed final sign-off May 2015 | 563 06th Av | Bailey General Contracting Co Inc | new finishes shower/valve/toilet/tile; bathh remodel-all fixture locatios to remain-no structural. living room, add led can lights, new circuit insulation, drywall (replace), no structural work.Details
new finishes shower/valve/toilet/tile; bathh remodel-all fixture locatios to remain-no structural. living room, add led can lights, new circuit insulation, drywall (replace), no structural work. | $10,000 |
| Jan 23, 2015 | Never finaled issued Jan 2015, no final | 136 Carl St | Bailey General Contracting Co Inc | single unit remodel - interior only. update kitchen/bath. all plumbing rough location to remain. update electrical, no walls to be removed. no structural work.Details
single unit remodel - interior only. update kitchen/bath. all plumbing rough location to remain. update electrical, no walls to be removed. no structural work. | $50,000 |
| Jan 21, 2015 | Completed final sign-off Apr 2018 | 3564 17th St | Bailey General Contracting Co Inc | soft story program seismic retrofit per sfbc chapter 34b on 1st floor. 2012 iebc appendix a-4.Details
soft story program seismic retrofit per sfbc chapter 34b on 1st floor. 2012 iebc appendix a-4. | $35,000 |
| Oct 7, 2014 | Completed final sign-off Nov 2014 | 409 Nevada St | Bailey General Contracting Co Inc | build new 5 ft ht iron fence in front of house - 75% open per guide linesDetails
build new 5 ft ht iron fence in front of house - 75% open per guide lines | $3,000 |
| Sep 12, 2014 | Completed final sign-off Dec 2014 | 640 Delano Av | Bailey General Contracting Co Inc | kitchen remodel - replace in kind with updated cabinets, flooring, and fixtures. not changing layout of kitchen - no walls removed, moved or added.Details
kitchen remodel - replace in kind with updated cabinets, flooring, and fixtures. not changing layout of kitchen - no walls removed, moved or added. | $25,000 |
| Aug 8, 2014 | Completed final sign-off Nov 2014 | 73 Seacliff Av | Bailey General Contracting Co Inc | (1) bathroom remodel: cosmetic remodel - we will be repairing vanity, shower stall, bathroom floor and not moving any (e) utilities. strictly cosmetic.Details
(1) bathroom remodel: cosmetic remodel - we will be repairing vanity, shower stall, bathroom floor and not moving any (e) utilities. strictly cosmetic. | $25,000 |
| Jun 16, 2014 | Completed final sign-off Jun 2014 | 2101 Baker St | Bailey General Contracting Co Inc | install doubld layer of sheetrock on the inside of an elevator shaft. installed it on 3 openings, 5/8" type "x" sheetrock.Details
install doubld layer of sheetrock on the inside of an elevator shaft. installed it on 3 openings, 5/8" type "x" sheetrock. | $800 |
| Mar 4, 2014 | Completed final sign-off Jun 2014 | 2201 Sacramento St | Bailey General Contracting Co Inc | remodeling 2 bathrooms, w/o changing locations of any of the plumbing, electrical & fixtures. new tile & fixtures.Details
remodeling 2 bathrooms, w/o changing locations of any of the plumbing, electrical & fixtures. new tile & fixtures. | $45,000 |
| Mar 4, 2014 | Completed final sign-off May 2014 | 44 Divisadero St | Bailey General Contracting Co Inc | installing new laundry hook ups w/wahser & dryer cabinets. new wine cabinet installation.Details
installing new laundry hook ups w/wahser & dryer cabinets. new wine cabinet installation. | $20,000 |
| Oct 22, 2013 | Completed final sign-off Jan 2014 | 2101 Baker St | Bailey General Contracting Co Inc | new kitchen cabinets, w/dimensions as existing, new gas line installation, new countertops, electrical update, ultimately same layout as existing kitchem no wall removal or new installations plumbing locations to street the same.Details
new kitchen cabinets, w/dimensions as existing, new gas line installation, new countertops, electrical update, ultimately same layout as existing kitchem no wall removal or new installations plumbing locations to street the same. | $25,000 |
| May 30, 2013 | Completed final sign-off Jul 2013 | 1510 Union St | Bailey General Contracting Co Inc | to comply with ordinance 0259-13 only, installatio of grab bars in sro at hte folloring locations : 2nd flr 1 shower & 1 toilet, 3rd flr, 1 showers & 1 toilet total 8 grab barsDetails
to comply with ordinance 0259-13 only, installatio of grab bars in sro at hte folloring locations : 2nd flr 1 shower & 1 toilet, 3rd flr, 1 showers & 1 toilet total 8 grab bars | $300 |
| Feb 8, 2013 | Completed final sign-off Jul 2013 | 317 Parnassus Av | Bailey General Contracting Co Inc | replacing rear windows of the house (7) . no change in size and locationDetails
replacing rear windows of the house (7) . no change in size and location | $9,500 |
| Oct 29, 2012 | Completed final sign-off Dec 2012 | 109 Frederick St | Bailey General Contracting Co Inc | repair concrete treads of the front exterior stairs, less than 50%.Details
repair concrete treads of the front exterior stairs, less than 50%. | $3,500 |
| Jul 27, 2012 | Completed final sign-off Dec 2012 | 631 O'farrell St | Bailey General Contracting Co Inc | room #1805 only - bathroom remodel consisting of new tile, new plumbing fixtures,no change of layout, remodel in kind, kitchen remodel-new tile, new plumbing fixtures and new base cabinet and new peninsula cabinet.Details
room #1805 only - bathroom remodel consisting of new tile, new plumbing fixtures,no change of layout, remodel in kind, kitchen remodel-new tile, new plumbing fixtures and new base cabinet and new peninsula cabinet. | $40,000 |
| Apr 26, 2012 | Completed final sign-off Oct 2012 | 2201 Sacramento St | Bailey General Contracting Co Inc | kitchen remodel without moving gas pipe but moving water pipes over approx. 1'-0" for new sink hook up. main and master bathroom remodel with new shower valves, new plumbing fixtures and new tile. toilets and drain pipes are not going to be moved. no structuralDetails
kitchen remodel without moving gas pipe but moving water pipes over approx. 1'-0" for new sink hook up. main and master bathroom remodel with new shower valves, new plumbing fixtures and new tile. toilets and drain pipes are not going to be moved. no structural | $85,000 |
| Dec 27, 2011 | Completed final sign-off Jan 2012 | 150 Holloway Av | Bailey General Contracting Co Inc | there was fire damage to comply w/ nov 201177780. replacing burnt from members and plywood sheathing. apply stucco to match the (e), repair in kind.Details
there was fire damage to comply w/ nov 201177780. replacing burnt from members and plywood sheathing. apply stucco to match the (e), repair in kind. | $1,800 |
| Aug 24, 2011 | Completed final sign-off Dec 2011 | 235 Granville Wy | Bailey General Contracting Co Inc | demolition of front entry way landings, stairs & rotten framing. build in kind & replace these structures, install new iron railing & guardrail.Details
demolition of front entry way landings, stairs & rotten framing. build in kind & replace these structures, install new iron railing & guardrail. | $9,900 |