- May 2014 to Feb 2026
28 permits since 2000 (contractor on 28 permits, designer on 1 permit): 26 completed, 1 never finaled, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. Their ranked record as a contractor is on their contractor page. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Feb 26, 2026 | Completed final sign-off Sep 2026 | 2539 32nd Av | Hoover Brindmore Inc. | revise p/a 2024-03198170 to document the construction of a new isolated pad footing, 4x4 post, and attachment of post to existing floor framing in order to support a previously approved beam/column.Details
revise p/a 2024-03198170 to document the construction of a new isolated pad footing, 4x4 post, and attachment of post to existing floor framing in order to support a previously approved beam/column. | $1,000 |
| Nov 21, 2024 | Completed final sign-off Jul 2026 | 1020 Union St | Hoover Brindmore Inc. | unit 8: while operating under 202406134412. inspector d. martin requested drawings be provided with a stamp from an engineer of record. structural framing upgrades to correct found deficencies.Details
unit 8: while operating under 202406134412. inspector d. martin requested drawings be provided with a stamp from an engineer of record. structural framing upgrades to correct found deficencies. | $60,000 |
| Jun 13, 2024 | Completed final sign-off Jul 2026 | 1020 Union St | Hoover Brindmore Inc. | unit #8 - remodel (4) bathrooms and wet bars: remove all existing finishes. update any exposed plumbing and electrical as needed. correct any deficiencies. all new lighting to be title 24 complaint.Details
unit #8 - remodel (4) bathrooms and wet bars: remove all existing finishes. update any exposed plumbing and electrical as needed. correct any deficiencies. all new lighting to be title 24 complaint. | $200,000 |
| Mar 19, 2024 | Completed final sign-off Aug 2026 | 2539 32nd Av | Hoover Brindmore Inc. | comply with nov 202316224 kitchen and bath remodel upgade plumbingn and electrical, replace finishes (cabinets & countr tops) remove (e) wall between kitchen/dinning room and living room new windows and skylights (vinyl windows approved of front of house per cp)Details
comply with nov 202316224 kitchen and bath remodel upgade plumbingn and electrical, replace finishes (cabinets & countr tops) remove (e) wall between kitchen/dinning room and living room new windows and skylights (vinyl windows approved of front of house per cp) | $75,000 |
| Nov 1, 2022 | Completed final sign-off Jan 2023 | 1845 Filbert St | Hoover Brindmore Inc. | kitchen remodel: remove and replace existing cabinets and countertops, upgrade electrical to code title 24 compliant, update plumbing to code. add ventilation to 3' past roof.Details
kitchen remodel: remove and replace existing cabinets and countertops, upgrade electrical to code title 24 compliant, update plumbing to code. add ventilation to 3' past roof. | $40,000 |
| Apr 11, 2022 | Completed final sign-off Nov 2022 | 630 Rhode Island St | Hoover Brindmore Inc. | 1 kitchen, 2 bathroom remodel: remove and replace (e) finishes, cabinets, countertops, tile and fixtures. update electrical and plumbing to meet code (all lighting to be title 24 compliant). replace (e) windows in 2nd floor (top--located in light well: not visible from street) shower with .. .Details
1 kitchen, 2 bathroom remodel: remove and replace (e) finishes, cabinets, countertops, tile and fixtures. update electrical and plumbing to meet code (all lighting to be title 24 compliant). replace (e) windows in 2nd floor (top--located in light well: not visible from street) shower with .. . | $150,000 |
| Aug 31, 2021 | Completed final sign-off Nov 2021 | 178 Hancock St | Hoover Brindmore Inc. | remove existing bathtub and surrounding tile, replace with shower includeing new 1 piece shower pan. replace e bath window with new tempered glass window.u-factor less than or equal to 0.30Details
remove existing bathtub and surrounding tile, replace with shower includeing new 1 piece shower pan. replace e bath window with new tempered glass window.u-factor less than or equal to 0.30 | $10,000 |
| Aug 5, 2019 | Completed final sign-off Dec 2019 | 935 14th St | Hoover Brindmore Inc. | kitchen remodel: remove/replace (e) cabinets, countertops, exhaust hod, insulate common wall in living room. retile shower in bathroom. remove (e) wood paneling & replace with 5/8" type x sheetrock. sand (e) flooring, paint walls.Details
kitchen remodel: remove/replace (e) cabinets, countertops, exhaust hod, insulate common wall in living room. retile shower in bathroom. remove (e) wood paneling & replace with 5/8" type x sheetrock. sand (e) flooring, paint walls. | $106,000 |
| Jun 18, 2019 | Completed final sign-off Aug 2019 | 1858 Grove St | Hoover Brindmore Inc. | to comply with physical inspection report#cc-8349.Details
to comply with physical inspection report#cc-8349. | $2,500 |
| Jun 11, 2019 | Completed final sign-off Aug 2019 | 3550 Market St | Hoover Brindmore Inc. | bathroom remodel. remove and replace existing finishes. 6' x 12' approximately. no structural work or wall removal.Details
bathroom remodel. remove and replace existing finishes. 6' x 12' approximately. no structural work or wall removal. | $25,000 |
| Apr 4, 2019 | Completed final sign-off Jun 2019 | 501 Beale St | Hoover Brindmore Inc. | unit 4h: remodel kitchen to include removal and replce of (e) kitchen cainbets, countertops & appliances. all new electrical to comply wtith t24. no structural work to be performed.Details
unit 4h: remodel kitchen to include removal and replce of (e) kitchen cainbets, countertops & appliances. all new electrical to comply wtith t24. no structural work to be performed. | $35,000 |
| Jan 15, 2019 | Completed final sign-off Jan 2019 | 3823 Cesar Chavez St | Hoover Brindmore Inc. | to obtain final inspection for work approved under pa 201509167136. all work is completeDetails
to obtain final inspection for work approved under pa 201509167136. all work is complete | |
| Jun 28, 2018 | Completed final sign-off Nov 2018 | 1858 Grove St | Hoover Brindmore Inc. | remove and replace existing finishes in kitchen & bathroom including updated electrical and plumbing. new cabinetry, appliances, flooring, lighting. remodel in kind.Details
remove and replace existing finishes in kitchen & bathroom including updated electrical and plumbing. new cabinetry, appliances, flooring, lighting. remodel in kind. | $70,000 |
| Apr 10, 2018 | Completed final sign-off Jul 2018 | 169 Putnam St | Hoover Brindmore Inc. | kitchen remodel and rewire and replace (e) cabinets, countertops, backsplash, flooring and appliances. all new lighting to be title 24 compliant per cec 150.0 (k)Details
kitchen remodel and rewire and replace (e) cabinets, countertops, backsplash, flooring and appliances. all new lighting to be title 24 compliant per cec 150.0 (k) | $45,000 |
| Feb 9, 2018 | Completed final sign-off May 2018 | 555 11th Av | Hoover Brindmore Inc. | kitchen remodel-remove and replace (e) cabinets, counter tops, backsplash. install new stove, reuse (e) refrigerator and ishwasher. add new under cabinet lights. all lighting to be led. install new toilet and sink in bathroom.Details
kitchen remodel-remove and replace (e) cabinets, counter tops, backsplash. install new stove, reuse (e) refrigerator and ishwasher. add new under cabinet lights. all lighting to be led. install new toilet and sink in bathroom. | $50,000 |
| Dec 18, 2017 | Completed final sign-off Jul 2018 | 169 Putnam St | Hoover Brindmore Inc. | remodel (e) 2nd floor bathroom, replace toilet, vanity, tile, exhaust fan & update lighting to ledDetails
remodel (e) 2nd floor bathroom, replace toilet, vanity, tile, exhaust fan & update lighting to led | $75,000 |
| Dec 7, 2017 | Completed final sign-off Jul 2018 | 169 Putnam St | Hoover Brindmore Inc. | legalize & expand (e) main floor bathroom, all new plumbing & electrical, new sink, toilet and shower.Details
legalize & expand (e) main floor bathroom, all new plumbing & electrical, new sink, toilet and shower. | $25,000 |
| Aug 2, 2017 | Completed final sign-off Feb 2018 | 1000 Chenery St | Hoover Brindmore Inc. | kitchen remodel: remove/replace (e) cabinets, countertops, flooring; upgrade plumbing/electrical to code; no change to footprint or exteriorDetails
kitchen remodel: remove/replace (e) cabinets, countertops, flooring; upgrade plumbing/electrical to code; no change to footprint or exterior | $35,000 |
| Jun 16, 2017 | Completed final sign-off Mar 2018 | 328 Caselli Av | Hoover Brindmore Inc. | kitchen remodel: remove and replace cabinets, countertops and appliances, updated electrical and plumbing to current code. no new wall and no existing wall relocation. lighting shall comply with cec 150.0(k)3.Details
kitchen remodel: remove and replace cabinets, countertops and appliances, updated electrical and plumbing to current code. no new wall and no existing wall relocation. lighting shall comply with cec 150.0(k)3. | $45,000 |
| Apr 17, 2017 | Completed final sign-off Jul 2017 | 48 Dorland St | Hoover Brindmore Inc. | remove existing vinyl windows on exterior facade and side and replace with 12 new marvin aluminum-clad wood windows, max factor = 0.32Details
remove existing vinyl windows on exterior facade and side and replace with 12 new marvin aluminum-clad wood windows, max factor = 0.32 | $10,000 |
| Sep 20, 2016 | Completed final sign-off Dec 2016 | 355 Buena Vista East Av | Hoover Brindmore Inc. | unit 411w -remove & replace kitchen cabinetry, countertops, sink & faucet, update elec. to meet current code.Details
unit 411w -remove & replace kitchen cabinetry, countertops, sink & faucet, update elec. to meet current code. | $21,000 |
| Aug 15, 2016 | Completed final sign-off May 2017 | 583 Teresita Bl | Hoover Brindmore Inc. | complete kitchen remodel: remove all extg finishes to framing. remove 1 non-structural partition wall alter 2 side by side doors to 1 pocket door, remove & replace 2 windows(expanding size), update all electrical, plmg, & mech in kchn, install new finishes & appliances in kitchen to new layout.Details
complete kitchen remodel: remove all extg finishes to framing. remove 1 non-structural partition wall alter 2 side by side doors to 1 pocket door, remove & replace 2 windows(expanding size), update all electrical, plmg, & mech in kchn, install new finishes & appliances in kitchen to new layout. | $65,000 |
| Nov 4, 2015 | Never finaled issued Nov 2015, no final | 34 Lundys Ln | Hoover Brindmore Inc. | remove kitchen/stove in order to permanently remove the in-law rental unit from housing use. bring habitable space on basement level up to code for habitability, legalize (e) bathroom to include removal of bath tub and "kitchen" sink.Details
remove kitchen/stove in order to permanently remove the in-law rental unit from housing use. bring habitable space on basement level up to code for habitability, legalize (e) bathroom to include removal of bath tub and "kitchen" sink. | $10,000 |
| Oct 22, 2015 | Completed final sign-off Mar 2016 | 37 Miguel St | Hoover Brindmore Inc. | minor kitchen remodel; remove/replace (e) cabinets & countertops including updating electrical panel & extending gas line to kitchen.Details
minor kitchen remodel; remove/replace (e) cabinets & countertops including updating electrical panel & extending gas line to kitchen. | $20,000 |
| Sep 16, 2015 | Expired or cancelled expired Jan 2019 | 3823 Cesar Chavez St | Hoover Brindmore Inc. | light kitchen remodel - remove (e) cabinets, countertops, appliances, install newcabinets, countertops, appliances, update electrical and plumbing in kitchen including new sub panel and relocate stove gas line. no structural work involved.Details
light kitchen remodel - remove (e) cabinets, countertops, appliances, install newcabinets, countertops, appliances, update electrical and plumbing in kitchen including new sub panel and relocate stove gas line. no structural work involved. | $35,000 |
| Aug 4, 2014 | Completed final sign-off Mar 2015 | 446 Liberty St | Hoover Brindmore Inc. | replace front deckDetails
replace front deck | $35,000 |
| Jun 10, 2014 | Completed final sign-off Sep 2014 | 127 Stillings Av | Hoover Brindmore Inc. | remodel 2 bathrooms; remove (e) fixtures and finishes down to framing - update mechanical, new insulation, drywall tile & finishes. to comply with cec150(k)10Details
remodel 2 bathrooms; remove (e) fixtures and finishes down to framing - update mechanical, new insulation, drywall tile & finishes. to comply with cec150(k)10 | $25,000 |
| May 14, 2014 | Completed final sign-off Jun 2014 | 634 Laguna St | Hoover Brindmore Inc. | apt a - bathroom remodel - remove bathtub; replace with shower with new vanity sinks and toilet, tile, new light fixtures; to comply with cec150(k) 10Details
apt a - bathroom remodel - remove bathtub; replace with shower with new vanity sinks and toilet, tile, new light fixtures; to comply with cec150(k) 10 | $15,000 |