Mark Anthony Phelps
- Listed as
- authorized agent-others, contractor, designer
- Firm
- Smp Construction & Maintenance Inc
- Based in
- Livermore
- On San Francisco permits
- Aug 2012 to Sep 2026
121 permits since 2000 (contractor on 119 permits, authorized agent-others on 11 permits, designer on 1 permit): 65 completed, 27 in progress, 19 never finaled, 10 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. Their ranked record as a contractor is on their contractor page. How to read these records
Most recent permits
Showing the 100 most recent of 121.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 9, 2026 | In progress issued Sep 2026 | 353 Rivera St | Smp Construction & Maintenance Inc | revision to pa 202601234425, 202602105600, 202602206224, 202603197892 the only changes on this revision is the verbage on sheet s2.1 stating the max distance from 6ft to 8ft we are also adding 33 helical piers to the project, and seismic upgrade of the building.Details
revision to pa 202601234425, 202602105600, 202602206224, 202603197892 the only changes on this revision is the verbage on sheet s2.1 stating the max distance from 6ft to 8ft we are also adding 33 helical piers to the project, and seismic upgrade of the building. | |
| Aug 13, 2026 | In progress issued Aug 2026 | 4320 18th St | Smp Construction & Maintenance Llc | revision to app #202607144970 to add 4 smart jacks with 4 cast in place footings and #16ft of supplimental beams. all other scopes of work will remain the same.Details
revision to app #202607144970 to add 4 smart jacks with 4 cast in place footings and #16ft of supplimental beams. all other scopes of work will remain the same. | $3,670 |
| Jul 17, 2026 | In progress filed Jul 2026, not yet issued | 15 Macondray Ln | Smp Construction & Maintenance Inc | voluntary foundation repir, sectional foundation remove and replacement, voluntary crawl space drainage.Details
voluntary foundation repir, sectional foundation remove and replacement, voluntary crawl space drainage. | $31,877 |
| Jul 14, 2026 | In progress issued Jul 2026 | 4320 18th St | Smp Construction & Maintenance Inc | voluntary floor support stabilize the floor system above where smart jacks are installed. voluntary crawl space drainage with hydraway drainage and smart sump pumpDetails
voluntary floor support stabilize the floor system above where smart jacks are installed. voluntary crawl space drainage with hydraway drainage and smart sump pump | $13,827 |
| Jun 25, 2026 | In progress filed Jun 2026, not yet issued | 215 Foerster St | Smp Construction & Maintenance Inc | voluntary foundation repair. stabilize the foundation where push piers are installedDetails
voluntary foundation repair. stabilize the foundation where push piers are installed | $17,422 |
| Jun 15, 2026 | In progress issued Jun 2026 | 443 Waller St | Smp Construction & Maintenance Inc | revision to bpa 202603248185 removing scope of work at top of property that not installing the trench drain at the back side of the property.Details
revision to bpa 202603248185 removing scope of work at top of property that not installing the trench drain at the back side of the property. | |
| Apr 23, 2026 | In progress filed Apr 2026, not yet issued | 505 Diamond St | Smp Construction & Maintenance Inc | construct basement wall and make crawlspace area habitable with new bedroom, bathroom, family room, and laundry. excavation and new retaining walls. rebuild back deck to new concrete deck.Details
construct basement wall and make crawlspace area habitable with new bedroom, bathroom, family room, and laundry. excavation and new retaining walls. rebuild back deck to new concrete deck. | $31,775 |
| Apr 22, 2026 | In progress filed Apr 2026, not yet issued | 133 11th Av | Smp Construction & Maintenance Inc | voluntary remove/ replacement of front patio concrete side walk wayDetails
voluntary remove/ replacement of front patio concrete side walk way | $4,000 |
| Mar 31, 2026 | Completed final sign-off Apr 2026 | 1047 Shrader St | Smp Construction & Maintenance Inc | add (1) new footing for deck support at rear of home.Details
add (1) new footing for deck support at rear of home. | $700 |
| Mar 24, 2026 | In progress issued Mar 2026 | 443 Waller St | Smp Construction & Maintenance Inc | voluntary outside drainage at rear. voluntary concrete remove and replace.Details
voluntary outside drainage at rear. voluntary concrete remove and replace. | $5,315 |
| Mar 19, 2026 | In progress issued Mar 2026 | 353 Rivera St | Smp Construction & Maintenance Inc | revision to pa #202601234425,202602105600,202602206224.we will be adding 5 push piers with 5 pier spacers as shown on sheets s2.1, s4.3 & s4.4 there will be 6 push piers in total.Details
revision to pa #202601234425,202602105600,202602206224.we will be adding 5 push piers with 5 pier spacers as shown on sheets s2.1, s4.3 & s4.4 there will be 6 push piers in total. | |
| Mar 19, 2026 | Completed final sign-off Apr 2026 | 1962 22nd Av | Smp Construction & Maintenance Inc | voluntary vertical crack repair w/ carbon armor, voluntary horizontal crack repair w/ carbon armorDetails
voluntary vertical crack repair w/ carbon armor, voluntary horizontal crack repair w/ carbon armor | $2,460 |
| Mar 13, 2026 | In progress issued Mar 2026 | 1047 Shrader St | Smp Construction & Maintenance Inc | voluntary floor support stabilize floor system above where the smart jacks are installedDetails
voluntary floor support stabilize floor system above where the smart jacks are installed | $4,513 |
| Feb 20, 2026 | In progress issued Feb 2026 | 353 Rivera St | Smp Construction & Maintenance Inc | revision to pa 202601234425, 202602105600 this revision consists of adding drainage to the project as shown on sheets 2.1. we are also doing 10 ft extra foundation replacementDetails
revision to pa 202601234425, 202602105600 this revision consists of adding drainage to the project as shown on sheets 2.1. we are also doing 10 ft extra foundation replacement | $5,910 |
| Feb 10, 2026 | In progress issued Feb 2026 | 353 Rivera St | Smp Construction & Maintenance Inc | revision to pa#: 202601234425. remove and repair the interior slab of the home, request start of work inspection.Details
revision to pa#: 202601234425. remove and repair the interior slab of the home, request start of work inspection. | $18,549 |
| Feb 10, 2026 | In progress issued Aug 2026 | 3723 Market St | Smp Construction & Maintenance Inc | voluntary foundation repair. stablize foundation where piers are installed.Details
voluntary foundation repair. stablize foundation where piers are installed. | $15,607 |
| Feb 10, 2026 | Completed final sign-off Aug 2026 | 2112 Castro St | Smp Construction & Maintenance Inc | voluntary basement drainage and install sump pumpDetails
voluntary basement drainage and install sump pump | $3,659 |
| Feb 3, 2026 | Completed final sign-off Jul 2026 | 56 Arleta Av | Smp Construction & Maintenance Inc | volunatary drainage improvement in crawl space, drain pipe and sump pump tie into (e) laundry waste.Details
volunatary drainage improvement in crawl space, drain pipe and sump pump tie into (e) laundry waste. | $2,003 |
| Jan 28, 2026 | In progress filed Jan 2026, not yet issued | 17 Hodges Al | Smp Construction & Maintenance Inc | revision to pa 202509306367 this revision consists of changing the wood beam size from 2x10 to 2x12 shown on sheet s2.1Details
revision to pa 202509306367 this revision consists of changing the wood beam size from 2x10 to 2x12 shown on sheet s2.1 | |
| Jan 23, 2026 | In progress issued Jan 2026 | 353 Rivera St | Smp Construction & Maintenance Inc | voluntary foundation repair. stabilize foundation where piers are installed.Details
voluntary foundation repair. stabilize foundation where piers are installed. | $46,484 |
| Jan 7, 2026 | In progress filed Jan 2026, not yet issued | 645 Colby St | Smp Construction & Maintenance Inc | voluntary foundation repair for stabilization to adjacent neighboring property installing piers.Details
voluntary foundation repair for stabilization to adjacent neighboring property installing piers. | $22,840 |
| Jan 7, 2026 | In progress filed Jan 2026, not yet issued | 651 Colby St | Smp Construction & Maintenance Inc | voluntary foundation repair. stabilize foundation where piers are installedDetails
voluntary foundation repair. stabilize foundation where piers are installed | $22,844 |
| Nov 14, 2025 | In progress issued Nov 2025 | 139 Byxbee St | Smp Construction & Maintenance Inc | revision to 20250903431. relocating e 3 smart jackes as shown pg s2.1. adding horizontal crack repair with carbon armour as shown sheet s2.1. adding 8 spacers to each push pier as shown on sheet s4.3.4 ft total of crack repair,2 ft ea crackDetails
revision to 20250903431. relocating e 3 smart jackes as shown pg s2.1. adding horizontal crack repair with carbon armour as shown sheet s2.1. adding 8 spacers to each push pier as shown on sheet s4.3.4 ft total of crack repair,2 ft ea crack | $1,928 |
| Nov 10, 2025 | In progress issued Nov 2025 | 17 Hodges Al | Smp Construction & Maintenance Inc | this is a revision to pa#2025-0930-6397 (2) 2 x12 wood beam s2.1Details
this is a revision to pa#2025-0930-6397 (2) 2 x12 wood beam s2.1 | |
| Sep 30, 2025 | In progress issued Nov 2025 | 17 Hodges Al | Smp Construction & Maintenance Inc | revision to pa 202508062472 adding 4 smart jacks to the project with new footingDetails
revision to pa 202508062472 adding 4 smart jacks to the project with new footing | $1,639 |
| Sep 30, 2025 | Completed final sign-off Dec 2025 | 290 Melrose Av | Smp Construction & Maintenance Inc | voluntary basement drainage. install water guard (floor drainage system) with a super sump pump. discharge and termination point is tied into the homes water systemDetails
voluntary basement drainage. install water guard (floor drainage system) with a super sump pump. discharge and termination point is tied into the homes water system | $4,454 |
| Sep 3, 2025 | Completed final sign-off Nov 2025 | 139 Byxbee St | Smp Construction & Maintenance Inc | voluntary foundation repair. stabilize foundation where piers are installed. voluntary floor support. stabilize floor system where smart jacks are installed.Details
voluntary foundation repair. stabilize foundation where piers are installed. voluntary floor support. stabilize floor system where smart jacks are installed. | $21,870 |
| Aug 6, 2025 | In progress issued Aug 2025 | 17 Hodges Al | Smp Construction & Maintenance Inc | to revise permit 202411205390: voluntary basement drainage using waterguard drainage pipe. install waterguard drainage pipe at baasement foundation perimeter, connect to existing house waste pipe. gravity feed, no sump pump.Details
to revise permit 202411205390: voluntary basement drainage using waterguard drainage pipe. install waterguard drainage pipe at baasement foundation perimeter, connect to existing house waste pipe. gravity feed, no sump pump. | $15,000 |
| Jul 25, 2025 | Completed final sign-off Oct 2025 | 1907 17th Av | Smp Construction & Maintenance Inc | voluntary removal and replacement of a portion of a perimiter foundation for a sfr.Details
voluntary removal and replacement of a portion of a perimiter foundation for a sfr. | $35,000 |
| Jul 16, 2025 | Completed final sign-off Jul 2025 | 1548 Greenwich St | Smp Construction & Maintenance Inc | revision to pa #202412247372. this revision is removing 1 smart jack and 1 cast in place footing.Details
revision to pa #202412247372. this revision is removing 1 smart jack and 1 cast in place footing. | $54,502 |
| May 12, 2025 | Completed final sign-off Aug 2025 | 28 Agua Wy | Smp Construction & Maintenance Inc | voluntary foundation repair stabilize foundation where piers are installed. 20 push piers total.Details
voluntary foundation repair stabilize foundation where piers are installed. 20 push piers total. | $30,567 |
| Apr 23, 2025 | In progress issued May 2025 | 505 Diamond St | Smp Construction & Maintenance Inc | removal and replacement of rear wall foundation stem wall (not exceeding 2 feet measured from adjacent grade to new concrete slab on grade) including waterproofing and drainage provisions. repair in kind of dryrot wood wall. no other work proposed.new 4" concrete slab on grade(700 sq ft)Details
removal and replacement of rear wall foundation stem wall (not exceeding 2 feet measured from adjacent grade to new concrete slab on grade) including waterproofing and drainage provisions. repair in kind of dryrot wood wall. no other work proposed.new 4" concrete slab on grade(700 sq ft) | $28,775 |
| Apr 21, 2025 | Completed final sign-off May 2025 | 63 Winfield St | Smp Construction & Maintenance Inc | revision 202504043758- adding 3 additional piers on the right side of garage.Details
revision 202504043758- adding 3 additional piers on the right side of garage. | |
| Apr 11, 2025 | Completed final sign-off Oct 2025 | 6 Nottingham Pl | Smp Construction & Maintenance Inc | revision 202502130261- remove 3 smart jacks, 3 cast in place footing , 3 xl footings.Details
revision 202502130261- remove 3 smart jacks, 3 cast in place footing , 3 xl footings. | |
| Apr 11, 2025 | Completed final sign-off Jan 2026 | 234 Athens St | Smp Construction & Maintenance Inc | voluntary foundation repair. stabillize foundation where piers are installed.Details
voluntary foundation repair. stabillize foundation where piers are installed. | $6,400 |
| Apr 4, 2025 | In progress issued Apr 2025 | 63 Winfield St | Smp Construction & Maintenance Inc | voluntary foundation repair. stabilize foundation where piers are installed.Details
voluntary foundation repair. stabilize foundation where piers are installed. | $11,079 |
| Mar 7, 2025 | In progress issued Mar 2025 | 234 Wilde Av | Smp Construction & Maintenance Inc | revision to pa 2024-1217-7153 move two push piers to inside of crawl space. changes to s1.1 and s2 have been clouded and assigned delta number 2.Details
revision to pa 2024-1217-7153 move two push piers to inside of crawl space. changes to s1.1 and s2 have been clouded and assigned delta number 2. | |
| Feb 28, 2025 | Completed final sign-off Jul 2025 | 1548 Greenwich St | Smp Construction & Maintenance Inc | revision to pa 2024-1224-7372 to remove 3 concrete pile cap footings, 1 smartjack, 1 cast in place footing, and 9 helical piers. adding 10 crawl space piers.Details
revision to pa 2024-1224-7372 to remove 3 concrete pile cap footings, 1 smartjack, 1 cast in place footing, and 9 helical piers. adding 10 crawl space piers. | |
| Feb 13, 2025 | Completed final sign-off Oct 2025 | 6 Nottingham Pl | Smp Construction & Maintenance Inc | voluntary floor leveling/support including the installation of (7) "smart jacks" supported by new, new cast in place, isolated pad footings.Details
voluntary floor leveling/support including the installation of (7) "smart jacks" supported by new, new cast in place, isolated pad footings. | $5,573 |
| Jan 8, 2025 | Completed final sign-off May 2025 | 506 Rockdale Dr | Smp Construction & Maintenance Inc | rev. to 2024-0221-6262 to add one super sump pump. remove buried discharge line under deck verbage added to plans to clarify that all discharge lines are to connect to an (e) downspout that is connect to city sewer per field inspectro.Details
rev. to 2024-0221-6262 to add one super sump pump. remove buried discharge line under deck verbage added to plans to clarify that all discharge lines are to connect to an (e) downspout that is connect to city sewer per field inspectro. | $900 |
| Dec 24, 2024 | Completed final sign-off Jul 2025 | 1548 Greenwich St | Smp Construction & Maintenance Inc | voluntary foundation repair stabilize foundation where piers are installedDetails
voluntary foundation repair stabilize foundation where piers are installed | $63,385 |
| Dec 20, 2024 | Completed final sign-off Jun 2025 | 118 Stillings Av | Smp Construction & Maintenance Inc | voluntary foundation stabilization where piers are installed.Details
voluntary foundation stabilization where piers are installed. | $18,595 |
| Dec 19, 2024 | In progress issued Dec 2024 | 234 Wilde Av | Smp Construction & Maintenance Inc | voluntary foundation repair project utilizing vertical, metal "push" piers secured to existing foundation, approximately 51 lineal feet.Details
voluntary foundation repair project utilizing vertical, metal "push" piers secured to existing foundation, approximately 51 lineal feet. | $16,978 |
| Nov 20, 2024 | In progress issued Nov 2024 | 17 Hodges Al | Smp Construction & Maintenance Inc | voluntary wall support, stabilize where everbrace is installed. voluntary floor support. stabilize floors where smart jacks are installed.Details
voluntary wall support, stabilize where everbrace is installed. voluntary floor support. stabilize floors where smart jacks are installed. | $22,826 |
| Nov 6, 2024 | Completed final sign-off Jan 2025 | 1 Grand View Av | Smp Construction & Maintenance Inc | stablize foundation where piers are installed, 3 pier locations.Details
stablize foundation where piers are installed, 3 pier locations. | $6,150 |
| Oct 3, 2024 | Completed final sign-off Mar 2025 | 300 Nevada St | Smp Construction & Maintenance Inc | revision to pa # 2024-0208-5529, remove 6 hillside piers and related concrete work at rear west side of home, add 2 helical piers beneath center of slab and associated concrete work.Details
revision to pa # 2024-0208-5529, remove 6 hillside piers and related concrete work at rear west side of home, add 2 helical piers beneath center of slab and associated concrete work. | $5,000 |
| Jun 21, 2024 | Completed final sign-off Aug 2024 | 465 Colon Av | Valentine Corporation, Smp Construction & Maintenance Inc | voluntary foundation repair by stabilizing foundation where push piers are installedDetails
voluntary foundation repair by stabilizing foundation where push piers are installed | $15,000 |
| Feb 21, 2024 | Completed final sign-off May 2025 | 506 Rockdale Dr | Smp Construction & Maintenance Inc | voluntary outside drainage.Details
voluntary outside drainage. | $9,034 |
| Feb 8, 2024 | Completed final sign-off Mar 2025 | 300 Nevada St | Smp Construction & Maintenance Inc | foundation repair around the sides and front of the structure for 300 nevada. 18 push piers, and two helical piers.Details
foundation repair around the sides and front of the structure for 300 nevada. 18 push piers, and two helical piers. | $22,379 |
| Jan 23, 2024 | Completed final sign-off Mar 2024 | 747 Teresita Bl | Smp Construction & Maintenance Inc | revision to pa 202312202824. added 7 spacers.Details
revision to pa 202312202824. added 7 spacers. | |
| Dec 20, 2023 | Completed final sign-off Mar 2024 | 747 Teresita Bl | Smp Construction & Maintenance Inc | voluntary partial foundation repair stabilize foundation where piers are installed at rear of building approx 40 lf.Details
voluntary partial foundation repair stabilize foundation where piers are installed at rear of building approx 40 lf. | $16,950 |
| Nov 8, 2023 | Completed final sign-off Mar 2024 | 543 30th St | Smp Construction & Maintenance Inc | bolt existing sill plate to existing foundation. add 1/2" plywood to entire permimeter of crawl space with 8d at 4" o.c.Details
bolt existing sill plate to existing foundation. add 1/2" plywood to entire permimeter of crawl space with 8d at 4" o.c. | $3,773 |
| Sep 20, 2023 | Never finaled issued Sep 2023, no final | 129 Acadia St | Smp Construction & Maintenance Inc | voluntary crawlspace drainage.Details
voluntary crawlspace drainage. | $2,250 |
| Aug 10, 2023 | Never finaled filed Aug 2023, never issued | 30 Gilroy St | Smp Construction & Maintenance Inc | stabilize foundation where piers are installed.Details
stabilize foundation where piers are installed. | $5,333 |
| Aug 4, 2023 | Completed final sign-off Sep 2024 | 3 Castro St | Smp Construction & Maintenance Inc | revision to 202303274438. change details on pages s4.1 and s4.2.Details
revision to 202303274438. change details on pages s4.1 and s4.2. | |
| Mar 27, 2023 | Completed final sign-off Sep 2024 | 3 Castro St | Smp Construction & Maintenance Inc | crack repair w/carbon armor; foundation segment replacement foundation stabilizationDetails
crack repair w/carbon armor; foundation segment replacement foundation stabilization | $16,022 |
| Mar 13, 2023 | Completed final sign-off Feb 2024 | 280 Ankeny St | Smp Construction & Maintenance Inc | voluntary foundation repair. stabilize floor by installing piers and smart jacks. work at front left side of building.Details
voluntary foundation repair. stabilize floor by installing piers and smart jacks. work at front left side of building. | $12,276 |
| Mar 10, 2023 | Completed final sign-off May 2023 | 279 29th Av | Smp Construction & Maintenance Inc | three vertical and one horizontal crack repair - rear of garage on the wall. epoxy injection onlyDetails
three vertical and one horizontal crack repair - rear of garage on the wall. epoxy injection only | $2,000 |
| Jan 23, 2023 | Completed final sign-off Jan 2026 | 108 Alpine Tr | Smp Construction & Maintenance Inc | revision to pa #2022-1013-4269: add 5 spacers, add 2 flat land push piers, & add 8ft of angle iron. remove 2 concentric piers, 6 smart jacks.Details
revision to pa #2022-1013-4269: add 5 spacers, add 2 flat land push piers, & add 8ft of angle iron. remove 2 concentric piers, 6 smart jacks. | |
| Oct 13, 2022 | Completed final sign-off Jan 2026 | 108 Alpine Tr | Smp Construction & Maintenance Inc | foundation repair: install piers to lift and level floorsDetails
foundation repair: install piers to lift and level floors | $27,241 |
| Sep 29, 2022 | Completed final sign-off Oct 2022 | 379 30th Av | Smp Construction & Maintenance Inc | revision to bpa#202204283205, removing (1) trench, (3) urfps, 28 l70'sDetails
revision to bpa#202204283205, removing (1) trench, (3) urfps, 28 l70's | |
| Sep 13, 2022 | Completed final sign-off Sep 2022 | 80 Pinehurst Wy | Smp Construction & Maintenance Inc | foundation repair - retrofit. install 26 simpson strong-tie urfp 10s.Details
foundation repair - retrofit. install 26 simpson strong-tie urfp 10s. | $3,927 |
| Aug 23, 2022 | Completed final sign-off May 2024 | 146 Edinburgh St | Smp Construction & Maintenance Inc | remove/replace concrete where piers are being installed & concretric push piers to support foundation. install pushh piers to support foundation.install smart jacking.install bolts to connect pier bracket to foundation.install hillside push pier to suppport foundation.install simpson strong-tie t's.Details
remove/replace concrete where piers are being installed & concretric push piers to support foundation. install pushh piers to support foundation.install smart jacking.install bolts to connect pier bracket to foundation.install hillside push pier to suppport foundation.install simpson strong-tie t's. | $20,019 |
| Aug 4, 2022 | Expired or cancelled cancelled Sep 2022 | 80 Pinehurst Wy | Smp Construction & Maintenance Inc | rev to pa# 2022-0412-2042: foundation repair(not qulify ebb)Details
rev to pa# 2022-0412-2042: foundation repair(not qulify ebb) | |
| Jun 8, 2022 | Never finaled issued Jun 2022, no final | 379 30th Av | Smp Construction & Maintenance Inc | administrative permit to correct description for pa# 202204283205. seismic retrofit per cebc chapter a3. (sfbc ab108)Details
administrative permit to correct description for pa# 202204283205. seismic retrofit per cebc chapter a3. (sfbc ab108) | |
| Apr 28, 2022 | Completed final sign-off Oct 2022 | 379 30th Av | Smp Construction & Maintenance Inc | brace and boltDetails
brace and bolt | $7,061 |
| Apr 12, 2022 | Expired or cancelled cancelled Sep 2022 | 80 Pinehurst Wy | Smp Construction & Maintenance Inc | seismic retrofit - brace & beltDetails
seismic retrofit - brace & belt | $3,425 |
| Dec 7, 2021 | Completed final sign-off Mar 2022 | 1512 Willard St | Smp Construction & Maintenance Inc | install 20 mil liner in crawlspace area over groundspace and up foundation walls. wrap bottom of peir post assemblies concrete pier section with cleanspace liner cleanspace tape in crawl space to create a sealed environment. inject simpson strong -tie crack kit epoxy. install carbon fiber patchDetails
install 20 mil liner in crawlspace area over groundspace and up foundation walls. wrap bottom of peir post assemblies concrete pier section with cleanspace liner cleanspace tape in crawl space to create a sealed environment. inject simpson strong -tie crack kit epoxy. install carbon fiber patch | $3,095 |
| Oct 20, 2021 | Never finaled issued Oct 2021, no final | 170 Madrone Av | Smp Construction & Maintenance Inc | revision to app#202101072253 for foundation repair.Details
revision to app#202101072253 for foundation repair. | $3,671 |
| Jul 15, 2021 | Never finaled issued Aug 2021, no final | 181 Graystone Tr | Smp Construction & Maintenance Inc | revision to pa 201809180632. foundation repair and underpinning.Details
revision to pa 201809180632. foundation repair and underpinning. | $18,925 |
| Apr 29, 2021 | Completed final sign-off Jul 2021 | 65 Badger St | Smp Construction & Maintenance Inc | voluntary foundation repairDetails
voluntary foundation repair | $2,000 |
| Apr 29, 2021 | Never finaled issued May 2021, no final | 870 Kansas St | Smp Construction & Maintenance Inc | revision to app#202011108590Details
revision to app#202011108590 | $1,000 |
| Mar 29, 2021 | Completed final sign-off Feb 2022 | 90 Westgate Dr | Smp Construction & Maintenance Inc | voluntary underpinning. install 11 piers to stabilize the existing foundation.Details
voluntary underpinning. install 11 piers to stabilize the existing foundation. | $32,879 |
| Mar 29, 2021 | Never finaled issued May 2021, no final | 4100 03rd St | Smp Construction & Maintenance Inc | install waterguard drainage system and vapor barrier in basement to direct storm water to existing sump pumps.Details
install waterguard drainage system and vapor barrier in basement to direct storm water to existing sump pumps. | $8,000 |
| Jan 7, 2021 | Completed final sign-off Nov 2021 | 170 Madrone Av | Smp Construction & Maintenance Inc | voluntary foundation replacementDetails
voluntary foundation replacement | $17,000 |
| Jan 7, 2021 | Never finaled issued Feb 2021, no final | 2487 43rd Av | Smp Construction & Maintenance Inc | voluntary foundation replacement, total 27 sfDetails
voluntary foundation replacement, total 27 sf | $18,000 |
| Dec 29, 2020 | Completed final sign-off May 2021 | 123 Stillings Av | Smp Construction & Maintenance Inc | voluntary t-bracker retrofit, vapor barrier installation and foundation crack repair.Details
voluntary t-bracker retrofit, vapor barrier installation and foundation crack repair. | $6,000 |
| Dec 29, 2020 | Expired or cancelled withdrawn Dec 2024 | 118 Stillings Av | underpinning of existing structure for doundation stabilization using fsi 288 push pier & lateral tiebacks.Details
underpinning of existing structure for doundation stabilization using fsi 288 push pier & lateral tiebacks. | $28,425 | |
| Nov 10, 2020 | Completed final sign-off May 2023 | 870 Kansas St | Smp Construction & Maintenance Inc | voluntary underpinning: install 20 piers to stabilize existing foundation.Details
voluntary underpinning: install 20 piers to stabilize existing foundation. | $25,000 |
| Nov 10, 2020 | Expired or cancelled cancelled Jan 2026 | 556 Congo St | Smp Construction & Maintenance Inc | voluntary concrete steps and landing construction at front, and retaining wall at left side of the bldg. comply w/ comments under pa 202009144168: file new permit for additional retaining wall and concrete steps.Details
voluntary concrete steps and landing construction at front, and retaining wall at left side of the bldg. comply w/ comments under pa 202009144168: file new permit for additional retaining wall and concrete steps. | $10,000 |
| Sep 14, 2020 | Expired or cancelled cancelled Jan 2026 | 556 Congo St | Smp Construction & Maintenance Inc | revision to pa's 202003126872 & 201908128510. change smartjack size to 7 ft high. added retaining wall on left side of home. added concrete steps and wallway to righ side.Details
revision to pa's 202003126872 & 201908128510. change smartjack size to 7 ft high. added retaining wall on left side of home. added concrete steps and wallway to righ side. | $5,000 |
| Mar 12, 2020 | Completed final sign-off Jan 2021 | 556 Congo St | Smp Construction & Maintenance Inc | rev to pa# 201908128510; voluntary fundation replacement, to add (5) smark jacks and retaining wallDetails
rev to pa# 201908128510; voluntary fundation replacement, to add (5) smark jacks and retaining wall | |
| Feb 12, 2020 | Completed final sign-off Feb 2021 | 253 05th Av | Smp Construction & Maintenance Inc | rev to pa# 201912129379; remove retaining wall from previous plansDetails
rev to pa# 201912129379; remove retaining wall from previous plans | $2,000 |
| Jan 3, 2020 | Completed final sign-off May 2020 | 116 Broad St | Smp Construction & Maintenance Inc | "this permit is for work to be performed in general conformance with the california existing building code (cebc), appendix chapter a3 (sfbc ab-1 08) voluntary brace and bolt retrofit to crawl space.Details
"this permit is for work to be performed in general conformance with the california existing building code (cebc), appendix chapter a3 (sfbc ab-1 08) voluntary brace and bolt retrofit to crawl space. | $8,000 |
| Dec 12, 2019 | Completed final sign-off Feb 2021 | 253 05th Av | Smp Construction & Maintenance Inc | revision to app#201908068013 for additional foundation replacement.Details
revision to app#201908068013 for additional foundation replacement. | $5,000 |
| Oct 1, 2019 | Completed final sign-off Nov 2019 | 172 Orsi Cr | Smp Construction & Maintenance Inc | voluntary repair of the front porch steps of the residence. front steps not being modified/removed or replaced. infill inside of stairs to provide structural support with polyurethane adhesive.Details
voluntary repair of the front porch steps of the residence. front steps not being modified/removed or replaced. infill inside of stairs to provide structural support with polyurethane adhesive. | $1,000 |
| Aug 30, 2019 | Expired or cancelled cancelled Jan 2026 | 177 Lomita Av | Smp Construction & Maintenance Inc | lift and level garage slab and culk the cracks in the same slabDetails
lift and level garage slab and culk the cracks in the same slab | $2,900 |
| Aug 12, 2019 | Completed final sign-off Jan 2021 | 556 Congo St | Smp Construction & Maintenance Inc | voluntary foundation replacementDetails
voluntary foundation replacement | $60,000 |
| Aug 6, 2019 | Completed final sign-off Feb 2021 | 253 05th Av | Smp Construction & Maintenance Inc | voluntary underpinning (7 push pipes) and partial foundation replacement.Details
voluntary underpinning (7 push pipes) and partial foundation replacement. | $19,000 |
| Jan 29, 2019 | Never finaled issued Jan 2019, no final | 181 Graystone Tr | Smp Construction & Maintenance Inc | rev to pa#201809180632; changes to pier positioning and spacingDetails
rev to pa#201809180632; changes to pier positioning and spacing | $51,000 |
| Sep 18, 2018 | Completed final sign-off Apr 2022 | 181 Graystone Tr | Smp Construction & Maintenance Inc | foundation stabilization by installtion of 18 push piers.Details
foundation stabilization by installtion of 18 push piers. | $51,000 |
| Sep 4, 2018 | Completed final sign-off Mar 2019 | 780 Goettingen St | Smp Construction & Maintenance Inc | permanently stabilize foundationl permanently stabilize slab floor.Details
permanently stabilize foundationl permanently stabilize slab floor. | $21,959 |
| Aug 16, 2018 | Never finaled issued Aug 2018, no final | 4086 26th St | Smp Construction & Maintenance Inc | permanently stabilize foundation - volunary foundation underpinningDetails
permanently stabilize foundation - volunary foundation underpinning | $3,506 |
| May 8, 2018 | Completed final sign-off Aug 2018 | 279 Ralston St | Smp Construction & Maintenance Inc | revision to 201708185242 - removing piers #8 & 9Details
revision to 201708185242 - removing piers #8 & 9 | |
| Apr 11, 2018 | Completed final sign-off Aug 2018 | 279 Ralston St | Smp Construction & Maintenance Inc | rev to app#201708185242; removing piers #8 & #9Details
rev to app#201708185242; removing piers #8 & #9 | |
| Mar 19, 2018 | Expired or cancelled expired Feb 2020 | 1200 Wayland St | Smp Construction & Maintenance Inc | foundation with new push piers system, 23 piers total as secondary support of foundation footing.Details
foundation with new push piers system, 23 piers total as secondary support of foundation footing. | $46,000 |
| Feb 20, 2018 | Never finaled filed Feb 2018, never issued | 739 Madrid St | Smp Construction & Maintenance Inc | rear building for storage. erect 2-story storage in the rear yard not connected to the residential buildingDetails
rear building for storage. erect 2-story storage in the rear yard not connected to the residential building | $50,000 |
| Feb 20, 2018 | Never finaled filed Feb 2018, never issued | 739 Madrid St | Smp Construction & Maintenance Inc | front building. voluntary foundation underpinning to prevent further bowing of exterior wall.Details
front building. voluntary foundation underpinning to prevent further bowing of exterior wall. | $50,000 |
| Jan 5, 2018 | Completed final sign-off Apr 2018 | 2624 15th Av | Smp Construction & Maintenance Inc | voluntary foundation repair work: supoort (e) foundation with voluntary fpoundation repair work: new post pier systemDetails
voluntary foundation repair work: supoort (e) foundation with voluntary fpoundation repair work: new post pier system | $18,000 |
| Dec 1, 2017 | Never finaled issued Dec 2017, no final | 741 Teresita Bl | Smp Construction & Maintenance Inc | revision to app# 201707283236 to add a pier to foundationDetails
revision to app# 201707283236 to add a pier to foundation |