Marcy Wong
- Listed as
- architect
- Firm
- Wong Logan Architects
- Based in
- Berkeley
- On San Francisco permits
- Jun 2020 to Aug 2023
13 permits since 2000 (architect on 13 permits): 4 completed, 2 in progress, 4 never finaled, 3 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 22, 2023 | Never finaled issued Oct 2023, no final | 192 Utah St | Rod Heisler Construction | revision to bpa#202209092150 for modifications to concrete drag beamsDetails
revision to bpa#202209092150 for modifications to concrete drag beams | |
| Mar 20, 2023 | Completed final sign-off Aug 2023 | 198 Utah St | Rod Heisler Construction | barrier remove only, modify floor slab of (e) interior vestibule to create an accessible entrance. no change proposed to building exterior under this permitDetails
barrier remove only, modify floor slab of (e) interior vestibule to create an accessible entrance. no change proposed to building exterior under this permit | $5,000 |
| Sep 29, 2022 | Never finaled issued Oct 2022, no final | 151 Potrero Av | Rod Heisler Construction | patrial demo of a one story plus mezzanine wood framed structure known as area b (199 potrero av) including roof, walls & supporting foundations. site preparation for expansion of (e) adjacent area a (151 potrero) and a new accessible entrance in area a.Details
patrial demo of a one story plus mezzanine wood framed structure known as area b (199 potrero av) including roof, walls & supporting foundations. site preparation for expansion of (e) adjacent area a (151 potrero) and a new accessible entrance in area a. | $50,000 |
| Sep 9, 2022 | Never finaled issued Oct 2022, no final | 192 Utah St | Rod Heisler Construction | building 2, interior structural strenthening, roof strengthening, selected interior demolition & elevator shaft modifications to convert (e) freight elevator in area e to passenger elevator. application travel with pa#: 202011189185Details
building 2, interior structural strenthening, roof strengthening, selected interior demolition & elevator shaft modifications to convert (e) freight elevator in area e to passenger elevator. application travel with pa#: 202011189185 | |
| Nov 22, 2021 | Expired or cancelled cancelled Sep 2024 | 151 Potrero Av | Rod Heisler Construction | demolition of a portion of a non-historic loading dock in building b (199 potrero/648 15th st). install pg&e transform on concrete pad. elecrical drawings showing the bus duct & electrical room layout shall follow as separate submittalDetails
demolition of a portion of a non-historic loading dock in building b (199 potrero/648 15th st). install pg&e transform on concrete pad. elecrical drawings showing the bus duct & electrical room layout shall follow as separate submittal | $95,000 |
| May 10, 2021 | Completed final sign-off Mar 2022 | 198 Utah St | Rod Heisler Construction | revision to pa# 202008262679 to add interior electrical room, replace previouly approved exterior roll up door with louvered swing door, replace prev approved metal infill panel in existing arched entry with a glazed window; electrical review.Details
revision to pa# 202008262679 to add interior electrical room, replace previouly approved exterior roll up door with louvered swing door, replace prev approved metal infill panel in existing arched entry with a glazed window; electrical review. | |
| Nov 18, 2020 | Never finaled issued Oct 2022, no final | 151 Potrero Av | Rod Heisler Construction | building 1: interior structural strengthening, roof strengthening, selected interior demolition & elevator shaft modifications to convert (e) freight elevator in area e into a passenger elevator.Details
building 1: interior structural strengthening, roof strengthening, selected interior demolition & elevator shaft modifications to convert (e) freight elevator in area e into a passenger elevator. | $2,405,793 |
| Nov 4, 2020 | In progress issued Oct 2023 | 151 Potrero Av | Rod Heisler Construction | renovation & expansion of existing building 2 (identified on plans as area c, e & lobb) on parcel 004.Details
renovation & expansion of existing building 2 (identified on plans as area c, e & lobb) on parcel 004. | $4,470,112 |
| Nov 4, 2020 | Expired or cancelled withdrawn Sep 2022 | 199 Potrero Av | Rod Heisler Construction | demolition of structure (area b - 199 potrero st/648 15th st) to accomodate expansion of adjacent area a (151 portero ave).Details
demolition of structure (area b - 199 potrero st/648 15th st) to accomodate expansion of adjacent area a (151 portero ave). | $50,000 |
| Nov 4, 2020 | In progress issued Oct 2023 | 151 Potrero Av | Rod Heisler Construction | renovation & expansion of existing building 1 (identified as area a and b) on parcel 004.Details
renovation & expansion of existing building 1 (identified as area a and b) on parcel 004. | $3,796,489 |
| Aug 26, 2020 | Completed final sign-off May 2022 | 198 Utah St | Rod Heisler Construction | core/shell improvements including: accessibility improvement including new accessible building entrey and toilet room. stair to mezznine and exit door, roof improvements, interior finishes.Details
core/shell improvements including: accessibility improvement including new accessible building entrey and toilet room. stair to mezznine and exit door, roof improvements, interior finishes. | $185,000 |
| Aug 17, 2020 | Completed final sign-off Apr 2022 | 198 Utah St | Rod Heisler Construction | seismic upgrade triggered by sfbc 403.12.1 & 2, removal of roofing and strengthening of roof deck, reconstruction and strengthening of the existing roof trusses, removal of existing mezzanines and replacement with new mezzanine, strengthening of existing masonry walls and associated foundation work.Details
seismic upgrade triggered by sfbc 403.12.1 & 2, removal of roofing and strengthening of roof deck, reconstruction and strengthening of the existing roof trusses, removal of existing mezzanines and replacement with new mezzanine, strengthening of existing masonry walls and associated foundation work. | $182,000 |
| Jun 12, 2020 | Expired or cancelled cancelled Jan 2026 | 198 Utah St | Rod Heisler Construction | secure (e) roof trusses & walls for structural design exploration. safe off (e) electrical. remove previous abandoned process pipes & equipment.Details
secure (e) roof trusses & walls for structural design exploration. safe off (e) electrical. remove previous abandoned process pipes & equipment. | $30,000 |