Majid Amiri-Razavian
- Listed as
- engineer
- Firm
- Mars Engineering Group, Inc.
- Based in
- Westhills
- On San Francisco permits
- Dec 2006 to Sep 2026
21 permits since 2000 (engineer on 21 permits): 13 completed, 2 in progress, 2 never finaled, 4 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 17, 2026 | In progress filed Sep 2026, not yet issued | 2140 Clement St | tenant improvement in existing ground floor kitchen restaurant space. non structural walls, new equipment, modified finishes, new finishes in existing restrooms, minor plumbing, mechanical and electrical. no change in occupancy or exiting.Details
tenant improvement in existing ground floor kitchen restaurant space. non structural walls, new equipment, modified finishes, new finishes in existing restrooms, minor plumbing, mechanical and electrical. no change in occupancy or exiting. | $180,000 | |
| Apr 28, 2026 | In progress issued Jun 2026 | 2140 Clement St | Terence Mcmahon Construction | tenant improvement in an (e) second story commissary kitchen restaurant space, non-structural. walls, new equipment modified finishes. new finishes in (e) restroom, minor plumbing, mechanical and electrical. permit only to provide occ to the second floor kitchenDetails
tenant improvement in an (e) second story commissary kitchen restaurant space, non-structural. walls, new equipment modified finishes. new finishes in (e) restroom, minor plumbing, mechanical and electrical. permit only to provide occ to the second floor kitchen | $65,000 |
| Jan 16, 2026 | Completed final sign-off Jun 2026 | 1701 Fillmore St | Business Information Sergent Revital-Con | g/f -tenant improvement in an existing resaurant space. non structural walls, equipment, modified finishes, new finishes in existing restrooms, minor plumbing, mechanical and eletricalDetails
g/f -tenant improvement in an existing resaurant space. non structural walls, equipment, modified finishes, new finishes in existing restrooms, minor plumbing, mechanical and eletrical | $120,000 |
| Apr 2, 2025 | Completed final sign-off Mar 2026 | 534 Pacific Av | B-Side Inc. | tenant improvement mechanical sheets for pa 2024-1210-6465Details
tenant improvement mechanical sheets for pa 2024-1210-6465 | $15,000 |
| Aug 12, 2024 | Completed final sign-off Jan 2025 | 680 Terry A Francois Bl | Skyline Construction | space #26: interior construction in an (e) vacant space. installation of non-structural walls, finishes, and equipment. mep included.Details
space #26: interior construction in an (e) vacant space. installation of non-structural walls, finishes, and equipment. mep included. | $45,000 |
| Aug 3, 2023 | Completed final sign-off Mar 2024 | 1058 Hyde St | Stupakk Construction Inc | chagen of use frmo retial to solan per planning comm #21314, non-structural interior in vacant space. no change in sq. ft./ext/footprint/parking. gr/f improvements, (6) new wax rooms, office, rest room remodel for full compliance, new hvac, electricalDetails
chagen of use frmo retial to solan per planning comm #21314, non-structural interior in vacant space. no change in sq. ft./ext/footprint/parking. gr/f improvements, (6) new wax rooms, office, rest room remodel for full compliance, new hvac, electrical | $210,000 |
| Jul 3, 2023 | Expired or cancelled cancelled Jan 2026 | 248 Sutter St | revision for pa 2023-0606-9319 provide smoke/fire pamaperDetails
revision for pa 2023-0606-9319 provide smoke/fire pamaper | $500 | |
| Oct 31, 2022 | Completed final sign-off Jun 2023 | 3251 20th Av | Norcal Custom Builders | #250d: minor tenant improvement for blondies pizza in food court space. front counter, signage, and misc work. some equipment to remain. mep is design build.no new plubming fixtures.Details
#250d: minor tenant improvement for blondies pizza in food court space. front counter, signage, and misc work. some equipment to remain. mep is design build.no new plubming fixtures. | $38,500 |
| Jul 8, 2022 | Completed final sign-off Sep 2023 | 248 Sutter St | J & K Project Mgmt Consultants Llc | ti work for hot 8 yoga with non structural walls, new restrooms, locker rooms, yoga studios, laundry room with associated plumbing, mechanical and electricalDetails
ti work for hot 8 yoga with non structural walls, new restrooms, locker rooms, yoga studios, laundry room with associated plumbing, mechanical and electrical | $350,000 |
| Nov 2, 2020 | Expired or cancelled withdrawn Feb 2021 | 2136 Palou Av | interior tenant improvement for commissary kitchens, restrooms, storage, walk-in coolers with associated plumbing, mechanical and electrical.Details
interior tenant improvement for commissary kitchens, restrooms, storage, walk-in coolers with associated plumbing, mechanical and electrical. | $780,000 | |
| Oct 24, 2019 | Never finaled issued Nov 2019, no final | 301 Valencia St | O Donoghue Construction Inc. | mechanical, electrical, plumbing and fire sprinkler modifications by design build contractor. electrical scope limited to providing power to address the ada accessible upgrades. ref pa 2017-0912-7848 & 2017-0912-7842Details
mechanical, electrical, plumbing and fire sprinkler modifications by design build contractor. electrical scope limited to providing power to address the ada accessible upgrades. ref pa 2017-0912-7848 & 2017-0912-7842 | |
| Mar 12, 2019 | Completed final sign-off Jul 2019 | 897 Brannan St | Bhogal Brothers Construction Inc | non structural interior construction and new finishes in an (e) vacant space. scope include mep maher naDetails
non structural interior construction and new finishes in an (e) vacant space. scope include mep maher na | $95,000 |
| Jan 17, 2019 | Expired or cancelled cancelled Jan 2026 | 652 Market St | Heng Yuan Engineering Group | mechanical & electrical revisions to permit #201808147290Details
mechanical & electrical revisions to permit #201808147290 | |
| Apr 25, 2018 | Completed final sign-off Jan 2020 | 338 Grant Av | Gabriel Mena | ti of an (e) retail space to build gelato store with all associated mep's. ti to include new accessible restroom & demo of an (e) service mezzanine. n/a for maher.Details
ti of an (e) retail space to build gelato store with all associated mep's. ti to include new accessible restroom & demo of an (e) service mezzanine. n/a for maher. | $76,500 |
| Apr 18, 2018 | Never finaled issued Apr 2019, no final | 75 Yerba Buena Ln | J M E Construction Services Inc | revision to 201703201819. existing tropisueno restaurant expanding into vacant space & providing take out concept w/new cold-prep kitchen area & service counters with associted electrical, mechanical & plumbing. **maher n/a**Details
revision to 201703201819. existing tropisueno restaurant expanding into vacant space & providing take out concept w/new cold-prep kitchen area & service counters with associted electrical, mechanical & plumbing. **maher n/a** | $25,000 |
| Sep 28, 2016 | Completed final sign-off Nov 2016 | 1075 Sutter St | Astorga Construction Inc | existing restaurant in hotel carlton ground floor remodel with new wine bar and new finishes throughout seating areaDetails
existing restaurant in hotel carlton ground floor remodel with new wine bar and new finishes throughout seating area | $10,500 |
| Jul 29, 2016 | Completed final sign-off Mar 2017 | 1000 16th St | K Bali Construction | 1st time tenant improvement new non-structural of tea cafe on the ground floor of multi-story bldg w/ associated arch, plumbing, mechanical & electrical. no exterior work. no new fsd's. new construction under #201112070234. n/a maher ordinanceDetails
1st time tenant improvement new non-structural of tea cafe on the ground floor of multi-story bldg w/ associated arch, plumbing, mechanical & electrical. no exterior work. no new fsd's. new construction under #201112070234. n/a maher ordinance | $75,000 |
| Jun 23, 2015 | Completed final sign-off May 2016 | 8 Octavia St | K Bali Construction | first time tenant improvement. 312 notification of (n) restaurant. (n) restaurant in (e) shall space, w/ electrical, plumbing, mechanical. n/a for maher ordinance.Details
first time tenant improvement. 312 notification of (n) restaurant. (n) restaurant in (e) shall space, w/ electrical, plumbing, mechanical. n/a for maher ordinance. | $1,000 |
| Nov 6, 2008 | Completed final sign-off Jan 2009 | 3100 Webster St | structural work only: remove 18" of the existing stucco from adjacent walls, remove tile topping, remove and replace e 2x6 t and g decking as required. remove and replace cantilevered joists. install and fasten n pressure treated 2x6 joist.no exterior work.Details
structural work only: remove 18" of the existing stucco from adjacent walls, remove tile topping, remove and replace e 2x6 t and g decking as required. remove and replace cantilevered joists. install and fasten n pressure treated 2x6 joist.no exterior work. | $90,000 | |
| Jul 3, 2008 | Expired or cancelled expired Aug 2011 | 170 Ofarrell St | 6th floor remodel of (e) textiles dept in (e) macy's. demolition & construction of non-structural partitions, ceilings, finsihes, flooring. all m.e.p. & other work to be doen under separate permit. fire alarm seperate permit.Details
6th floor remodel of (e) textiles dept in (e) macy's. demolition & construction of non-structural partitions, ceilings, finsihes, flooring. all m.e.p. & other work to be doen under separate permit. fire alarm seperate permit. | $35,000 | |
| Dec 22, 2006 | Completed final sign-off Jan 2007 | 835 Market St | mechanical only new hood at basement to replace extg hoodDetails
mechanical only new hood at basement to replace extg hood | $5,000 |