Maged Samir Henein
- Listed as
- architect, engineer
- Firm
- Black & Veatch
- Based in
- Walnut Creek
- On San Francisco permits
- Apr 2005 to Aug 2020
6 permits since 2000 (engineer on 5 permits, architect on 1 permit): 2 completed, 2 never finaled, 2 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 8, 2020 | Expired or cancelled cancelled Jul 2024 | 1335 Webster St | the project proposes to install a battery energy storage system(bess) inside the equipment pad of the extg electric vehicle charging station.Details
the project proposes to install a battery energy storage system(bess) inside the equipment pad of the extg electric vehicle charging station. | $25,000 | |
| Sep 23, 2019 | Never finaled issued Sep 2019, no final | 3350 Mission St | Cupertino Electric Inc. | revised drawing to original approved drawing set pa #201901100096, to comply with pg&e request to modify enclosure, ada signage, modify door location.Details
revised drawing to original approved drawing set pa #201901100096, to comply with pg&e request to modify enclosure, ada signage, modify door location. | |
| Apr 11, 2019 | Never finaled issued Jun 2019, no final | 4210 Ocean Av | Cupertino Electric Inc. | install 1 utility transformer, 1 switch board assembly, (3) 150 kw btc power units, (3) 150 kw bic dispensers, 1 level 2 charger. equipment enclosure. concrete padDetails
install 1 utility transformer, 1 switch board assembly, (3) 150 kw btc power units, (3) 150 kw bic dispensers, 1 level 2 charger. equipment enclosure. concrete pad | $100,000 |
| Jan 10, 2019 | Completed final sign-off Sep 2020 | 3350 Mission St | Cupertino Electric Inc. | install (1) utility transformer, (1) switchboard assembly, (1) 200 kw btc power unit, (3) 50 kw btc dispensers.Details
install (1) utility transformer, (1) switchboard assembly, (1) 200 kw btc power unit, (3) 50 kw btc dispensers. | $100,000 |
| Dec 7, 2016 | Expired or cancelled cancelled Sep 2024 | 220 Golden Gate Av | install 1 proposed# 6 awg 6 x 12 so m hcs cable; install 3 proposed t-mobile antennas. remove 3 (e) antennas. like for like swap. install 3 proposed rrus. ** maher: n/a **Details
install 1 proposed# 6 awg 6 x 12 so m hcs cable; install 3 proposed t-mobile antennas. remove 3 (e) antennas. like for like swap. install 3 proposed rrus. ** maher: n/a ** | $25,000 | |
| Apr 1, 2005 | Completed final sign-off Apr 2006 | 455 Market St | Rudolph Commercial Interiors Inc, Rci | oti-1,14th/fl-el,me.ls.Details
oti-1,14th/fl-el,me.ls. | $50,920 |