Madhan Samy
- Listed as
- architect, engineer
- Firm
- Structurology
- On San Francisco permits
- Sep 2019 to Dec 2023
8 permits since 2000 (engineer on 7 permits, architect on 1 permit): 4 completed, 2 in progress, 2 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 26, 2023 | In progress filed Dec 2023, not yet issued | 1 La Avanzada | Tilson Technology Management Inc | removing all t-mobile equipment,antenna,lines, all cabinets,ice bridge, and any associated hardware. there will no new installation of equipment and no other alterations to the building. there are two t-mobile sites at this location. this permit is to remove sprint id sf52xm665 only.Details
removing all t-mobile equipment,antenna,lines, all cabinets,ice bridge, and any associated hardware. there will no new installation of equipment and no other alterations to the building. there are two t-mobile sites at this location. this permit is to remove sprint id sf52xm665 only. | $16,280 |
| Dec 1, 2023 | In progress issued Feb 2024 | 2301 03rd St | Tilson Technology Management Inc | removing all t-mobile(sprint)equipment,antenna,lines,all cabinets on the ground,ice bridge and any associated hardware. there will be no new installation of equipment and no other alerations to the building.Details
removing all t-mobile(sprint)equipment,antenna,lines,all cabinets on the ground,ice bridge and any associated hardware. there will be no new installation of equipment and no other alerations to the building. | $16,280 |
| Mar 1, 2023 | Completed final sign-off Oct 2023 | 838 Church St | Gmbc Construction Inc | revision to pa# 202212208748, 1st flr: front room structural footing & beam & post modification. remodel 1st flr bathroom same layout 52sqft. remove from permit-2nd story bathroom remodel.Details
revision to pa# 202212208748, 1st flr: front room structural footing & beam & post modification. remodel 1st flr bathroom same layout 52sqft. remove from permit-2nd story bathroom remodel. | |
| Dec 20, 2022 | Completed final sign-off Oct 2023 | 838 Church St | Gmbc Construction Inc | revision to pa#2022-1109-6154. replace 1 window 1st fl front window at the front to be wood or wood aluminum clad. structural revison per plans.Details
revision to pa#2022-1109-6154. replace 1 window 1st fl front window at the front to be wood or wood aluminum clad. structural revison per plans. | |
| Nov 9, 2022 | Completed final sign-off Oct 2023 | 838 Church St | Gmbc Construction Inc | revision to permit 202111051894; reduce scope. new scope: (n)stair to 2nd story, (n)furnace enclosure, (n)led lighting, (n)flooring and painting, remodel bath at 2nd story, add'l structural details; per revised plans.Details
revision to permit 202111051894; reduce scope. new scope: (n)stair to 2nd story, (n)furnace enclosure, (n)led lighting, (n)flooring and painting, remodel bath at 2nd story, add'l structural details; per revised plans. | |
| Jul 22, 2022 | Completed final sign-off Mar 2023 | 4320 18th St | Green Bay Remodeling Inc. | remodel 2/f & 3/f: remodeling (e) kitchens & bathrooms. relocate laundry. 2nd flr & 3rd fl: convert (e) laundry to bedroomDetails
remodel 2/f & 3/f: remodeling (e) kitchens & bathrooms. relocate laundry. 2nd flr & 3rd fl: convert (e) laundry to bedroom | $60,000 |
| Sep 11, 2019 | Expired or cancelled cancelled Jan 2026 | 401 Keith St | sprint - install conduit, fiber optic and 1 new h-frame. no work and not visible from public right of wayDetails
sprint - install conduit, fiber optic and 1 new h-frame. no work and not visible from public right of way | $24,350 | |
| Sep 11, 2019 | Expired or cancelled cancelled Jan 2026 | 633 Folsom St | sprint - install new fiber through new conduit (1) new h-frame and (1) new purcell box; no work and not visible from public right of wayDetails
sprint - install new fiber through new conduit (1) new h-frame and (1) new purcell box; no work and not visible from public right of way | $24,350 |