Madelyn Mcclellan
- Listed as
- architect
- On San Francisco permits
- Dec 2019 to Nov 2023
9 permits since 2000 (architect on 9 permits): 7 completed, 2 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 7, 2023 | Completed final sign-off Mar 2024 | 2329 Sacramento St | Herrero Builders Incorporated | revision to pa# 202304105412, replace (e) 2/f built up desk w/ (n) traffic coating & curb over polywood substrate, remove (e) gutter & relocate (e) drains to accomodate 1 (n) deck mount drain, remove & replace (e) railigns to accommodate roofing work, revise door type for 2 bathrms per flr. revise cDetails
revision to pa# 202304105412, replace (e) 2/f built up desk w/ (n) traffic coating & curb over polywood substrate, remove (e) gutter & relocate (e) drains to accomodate 1 (n) deck mount drain, remove & replace (e) railigns to accommodate roofing work, revise door type for 2 bathrms per flr. revise c | $1,000 |
| Oct 5, 2023 | Completed final sign-off Apr 2024 | 555 San Jose Av | Herrero Builders Incorporated | work on 1st floor only - eeg procedure room remodel. remodel includes enlarging the existing eeg procedure room. reconfigure ceiling and door hardware.Details
work on 1st floor only - eeg procedure room remodel. remodel includes enlarging the existing eeg procedure room. reconfigure ceiling and door hardware. | $250,000 |
| Apr 10, 2023 | Completed final sign-off Mar 2024 | 2329 Sacramento St | Herrero Builders Incorporated | interior cosmetic upgrade includes the replacement of door and hardware, flooring and finishes, light fixtures, plumbing fixtures, casework and kitchen appliances. no change to building footprint of interior walls. original building built in 1963. all accessibility upgrades are elective.Details
interior cosmetic upgrade includes the replacement of door and hardware, flooring and finishes, light fixtures, plumbing fixtures, casework and kitchen appliances. no change to building footprint of interior walls. original building built in 1963. all accessibility upgrades are elective. | $3,200,000 |
| Jan 28, 2021 | Completed final sign-off Oct 2021 | 2333 Buchanan St | Herrero Builders Incorporated | install a wall mounted digital display and associated structural bracing, wall finishes, electrical and network work.Details
install a wall mounted digital display and associated structural bracing, wall finishes, electrical and network work. | $8,000 |
| Jan 26, 2021 | Completed final sign-off Jan 2022 | 1100 Van Ness Av | The Boldt Company | this project consists of adding (2) dc fast charging stations and electrical panel at garage level g2Details
this project consists of adding (2) dc fast charging stations and electrical panel at garage level g2 | $13,400 |
| Oct 27, 2020 | Completed final sign-off Jan 2022 | 2333 Buchanan St | Herrero Builders Incorporated | erect a recessed ceiling for installation of a decorative glass sculpture at g/f of the main waiting area. remove (e) directional light at ceiling along back wall. modify (e) sprinkler for proposed recessed ceiling. no alteration of spaces, wall uses of space or occupant load.Details
erect a recessed ceiling for installation of a decorative glass sculpture at g/f of the main waiting area. remove (e) directional light at ceiling along back wall. modify (e) sprinkler for proposed recessed ceiling. no alteration of spaces, wall uses of space or occupant load. | $16,373 |
| Sep 11, 2020 | Completed final sign-off Nov 2021 | 2329 Sacramento St | Pacific Auxiliary Fire Alarm | fire alarm replacement - includes installing a new notifier intelligent, addressable nfw-50 fire alarm system and new field devices per pre-application agreement with sffd.Details
fire alarm replacement - includes installing a new notifier intelligent, addressable nfw-50 fire alarm system and new field devices per pre-application agreement with sffd. | $171,701 |
| Dec 30, 2019 | Expired or cancelled cancelled Jan 2026 | 1100 Van Ness Av | install (5) dual-port charging station for electrical vehicles by 'chargepoint' at garage level g3. install (2) steel bollards at each station and add electrical eqiupment at (e) electrical room.Details
install (5) dual-port charging station for electrical vehicles by 'chargepoint' at garage level g3. install (2) steel bollards at each station and add electrical eqiupment at (e) electrical room. | $60,000 | |
| Dec 11, 2019 | Expired or cancelled cancelled Jan 2026 | 2351 Clay St | 7th fl - the project consists of furniture recreation, electric additions to serve relocated furniture, and minor accessibility upgrades to comply with sfdbi and applicable code requirements.Details
7th fl - the project consists of furniture recreation, electric additions to serve relocated furniture, and minor accessibility upgrades to comply with sfdbi and applicable code requirements. | $120,000 |