Permit GraphShortlistSan Francisco building permits since 2000

Lori Lee

License
M26114
Look the license up with the state
Listed as
engineer
Firm
Alfa Tech
Based in
San Francisco
On San Francisco permits
May 2011 to Sep 2025

9 permits since 2000 (engineer on 9 permits): 5 completed, 3 never finaled, 1 expired or cancelled.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records

Most recent permits

FiledOutcomeAddressContractorWork described on the permitDeclared cost
Sep 3, 2025Completed
final sign-off Mar 2026
3565 California StSkyline Constructioninterior tenant improvement of a new branch bank including new non structural partitions, doors, glazing, finishes, millwork and mep.
Details
Permit
202509034422
Status
complete
Filed
Sep 3, 2025
Permit issued
Oct 2, 2025
Final sign-off
Mar 30, 2026
Declared cost
$484,422
Address
3565 California St

interior tenant improvement of a new branch bank including new non structural partitions, doors, glazing, finishes, millwork and mep.

Open the permit page

$484,422
Jun 17, 2025Expired or cancelled
withdrawn Jul 2025
1750 Cesar Chavez Stfor suite a; t.i. of existing warehouse suite. scope includes: new non-structural partitions, ceilings, finishes, light fixtures and doors. change of occupancy.
Details
Permit
202506178811
Status
withdrawn
Filed
Jun 17, 2025
Declared cost
$1,985,920
Address
1750 Cesar Chavez St

for suite a; t.i. of existing warehouse suite. scope includes: new non-structural partitions, ceilings, finishes, light fixtures and doors. change of occupancy.

Open the permit page

$1,985,920
Feb 13, 2023Completed
final sign-off Sep 2024
120 Stockton StCalasia Construction Incsuite #856. revision to pa# 202202168080. reduction in scope from originally approved ti permit. affected trades include ameps. no change in building square footage or height. no site work on this permit.
Details
Permit
202302131882
Status
complete
Filed
Feb 13, 2023
Permit issued
Dec 14, 2023
Final sign-off
Sep 16, 2024
Address
120 Stockton St

suite #856. revision to pa# 202202168080. reduction in scope from originally approved ti permit. affected trades include ameps. no change in building square footage or height. no site work on this permit.

Open the permit page

Feb 16, 2022Completed
final sign-off Sep 2024
120 Stockton StSunshine Comm'l Constr. Inc., Calasia Construction Incinterior tenant suite 856 fit out & change of occupancy for(n) restaurant.t.i. improvement within an existing 8 stories shell bldg,scope to include:interior partitions,kitchen equipment,retrooms,mech,elec & plu system improvements as required for a full t.i. build out.no site work in this scope.
Details
Permit
202202168080
Status
complete
Filed
Feb 16, 2022
Permit issued
Sep 21, 2022
Final sign-off
Sep 16, 2024
Declared cost
$6,250,000
Address
120 Stockton St

interior tenant suite 856 fit out & change of occupancy for(n) restaurant.t.i. improvement within an existing 8 stories shell bldg,scope to include:interior partitions,kitchen equipment,retrooms,mech,elec & plu system improvements as required for a full t.i. build out.no site work in this scope.

Open the permit page

$6,250,000
Oct 20, 2020Never finaled
issued Dec 2020, no final
360 03rd StBcci Construction Company5th flr. t.i to (e) equipment rooms limited to minor architectural, hvac and t.i alterations.
Details
Permit
202010206988
Status
issued
Filed
Oct 20, 2020
Permit issued
Dec 1, 2020
Declared cost
$1,000,000
Address
360 03rd St

5th flr. t.i to (e) equipment rooms limited to minor architectural, hvac and t.i alterations.

Open the permit page

$1,000,000
Sep 25, 2020Completed
final sign-off Jun 2021
119 07th StFpc Builders Increvision to issue fuel oil / generator pa# 201908148712. generator connection to fire pump. generator spill containment. generator vent caps. ** maher: n/a **
Details
Permit
202009254999
Status
complete
Filed
Sep 25, 2020
Permit issued
May 6, 2021
Final sign-off
Jun 16, 2021
Address
119 07th St

revision to issue fuel oil / generator pa# 201908148712. generator connection to fire pump. generator spill containment. generator vent caps. ** maher: n/a **

Open the permit page

Aug 10, 2020Completed
final sign-off Mar 2021
555 California StClune Construction Company L P14th fl: new non-structural partitions, new electrical, new ceiling with new light fixtures, & new finishes. mep included. maher na
Details
Permit
202008101498
Status
complete
Filed
Aug 10, 2020
Permit issued
Nov 25, 2020
Final sign-off
Mar 26, 2021
Declared cost
$712,000
Address
555 California St

14th fl: new non-structural partitions, new electrical, new ceiling with new light fixtures, & new finishes. mep included. maher na

Open the permit page

$712,000
Mar 19, 2012Never finaled
issued Mar 2012, no final
1 Market StDpr Constructionrevision to pa #2011.05.19.6336-r-2 : add combination fsd @ corridor walls per fire dept.
Details
Permit
201203196266
Status
issued
Filed
Mar 19, 2012
Permit issued
Mar 28, 2012
Declared cost
$500
Address
1 Market St

revision to pa #2011.05.19.6336-r-2 : add combination fsd @ corridor walls per fire dept.

Open the permit page

$500
May 9, 2011Never finaled
issued May 2011, no final
1 Market StDpr Constructionrevision to appl #200904277112 -remove new coding tower from scope of work, minor value engineering, remove heat pumps, replace with four pipe fan coils on exisitng in furstucture.
Details
Permit
201105095569
Status
issued
Filed
May 9, 2011
Permit issued
May 19, 2011
Address
1 Market St

revision to appl #200904277112 -remove new coding tower from scope of work, minor value engineering, remove heat pumps, replace with four pipe fan coils on exisitng in furstucture.

Open the permit page