Leandro Cabulay Columna
- Listed as
- contractor, designer
- Firm
- L Columna General Contractor
- Based in
- Concord
- On San Francisco permits
- Jun 2007 to Jun 2026
7 permits since 2000 (contractor on 6 permits, designer on 1 permit): 4 completed, 2 in progress, 1 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. Their ranked record as a contractor is on their contractor page. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 10, 2026 | In progress filed Jun 2026, not yet issued | 478 Orizaba Av | convert g/f to j-adu. install new walls, insulation, window, door, bathroom,kitchen, electrical, plumbing, mini-split system, painting.Details
convert g/f to j-adu. install new walls, insulation, window, door, bathroom,kitchen, electrical, plumbing, mini-split system, painting. | $25,000 | |
| Sep 15, 2025 | In progress issued Sep 2025 | 478 Orizaba Av | L Columna General Contractor | replace in kind kitchen cabinets, counter tops, sink, faucet, p trap. repalce old outlets and wires. repplace in kind shower, lavatory, toilet, and paint bathroom. like for like.Details
replace in kind kitchen cabinets, counter tops, sink, faucet, p trap. repalce old outlets and wires. repplace in kind shower, lavatory, toilet, and paint bathroom. like for like. | $18,000 |
| Feb 22, 2024 | Completed final sign-off Oct 2024 | 261 Chicago Wy | L Columna General Contractor | revision to pa#202310178843 revise scope of work to" this permit is for work to be performed in general conformance with the california existing building code (cebc) appendix chapter a3 (sfbc ab-108)Details
revision to pa#202310178843 revise scope of work to" this permit is for work to be performed in general conformance with the california existing building code (cebc) appendix chapter a3 (sfbc ab-108) | |
| Feb 5, 2024 | Completed final sign-off Apr 2024 | 119 Delano Av | L Columna General Contractor | bathroom remodel. replacing flooring with like for like material. replacing tub with stand alone (relocate plumbing lines). relocating toilet. replacing double sink with single. removing dividing wall btwn tub & shower. install 4 ceiling canned lights. replacing wall tiling like for like.Details
bathroom remodel. replacing flooring with like for like material. replacing tub with stand alone (relocate plumbing lines). relocating toilet. replacing double sink with single. removing dividing wall btwn tub & shower. install 4 ceiling canned lights. replacing wall tiling like for like. | $17,850 |
| Oct 17, 2023 | Completed final sign-off Oct 2024 | 261 Chicago Wy | L Columna General Contractor | voluntary structural strengthening at ground floorDetails
voluntary structural strengthening at ground floor | $12,500 |
| Sep 13, 2022 | Completed final sign-off Oct 2022 | 357 Elizabeth St | L Columna General Contractor | 1 bathroom remodel: replace tub and shower. tile on floor and walls, replace toilet, sink, and faucet. install vanity and painting. no alteration of wall, window, or door.Details
1 bathroom remodel: replace tub and shower. tile on floor and walls, replace toilet, sink, and faucet. install vanity and painting. no alteration of wall, window, or door. | $15,225 |
| Jun 29, 2007 | Never finaled issued Jul 2008, no final | 25 Baker St | L Columna General Contractor | renovation of ground floor and basement floor. floor & partition walls to finishing. convert unoccupied basement to habitable rooms.Details
renovation of ground floor and basement floor. floor & partition walls to finishing. convert unoccupied basement to habitable rooms. | $58,000 |