Larry Tarter
- Listed as
- architect
- Firm
- Pinnacle Db, Inc.
- On San Francisco permits
- Feb 2012 to Sep 2026
14 permits since 2000 (architect on 14 permits): 7 completed, 5 in progress, 2 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 4, 2026 | In progress filed Sep 2026, not yet issued | 441 Quintara St | revision to permit 202306291125. to add new ground floor deck at rear.Details
revision to permit 202306291125. to add new ground floor deck at rear. | $6,000 | |
| Aug 20, 2024 | In progress issued Sep 2024 | 441 Quintara St | Masterful Construction Inc | revision to pa # 2023-0629-1125 two window widths change - 2' widerDetails
revision to pa # 2023-0629-1125 two window widths change - 2' wider | $500 |
| Aug 20, 2024 | In progress issued Mar 2026 | 201 Maywood Dr | James J Tarter Builder | interior non strucutural remodel new 200 amp electrical service. replace existing interior stairs. remodel (e) bathroom. new 1 hr wall between garage & basementDetails
interior non strucutural remodel new 200 amp electrical service. replace existing interior stairs. remodel (e) bathroom. new 1 hr wall between garage & basement | $80,000 |
| Jun 29, 2023 | In progress issued Oct 2023 | 1615 Broderick St | James J Tarter Builder | new interior elevatorDetails
new interior elevator | $140,000 |
| Jun 29, 2023 | In progress issued Jan 2024 | 441 Quintara St | Masterful Construction Inc, Pinnacle D B Inc. | new elevator. enclose decksDetails
new elevator. enclose decks | $150,000 |
| Oct 7, 2021 | Never finaled issued Jan 2022, no final | 42 Chenery St | James J Tarter Builder | construct nw elevator shaft in extg light well and install new elevator.Details
construct nw elevator shaft in extg light well and install new elevator. | $62,000 |
| Jun 14, 2021 | Completed final sign-off Oct 2022 | 3954 18th St | Pinnacle D B Inc. | new rear decks at 2nd & 3rd floorDetails
new rear decks at 2nd & 3rd floor | $16,200 |
| Aug 13, 2020 | Never finaled issued Sep 2021, no final | 2010 Gough St | Pinnacle D B Inc. | installation of new 2 stop residential elevator. minor alteration of extg dormer and siding. construction of new elevator shaft. install 20 amp 220v circuit for elevator equipmentDetails
installation of new 2 stop residential elevator. minor alteration of extg dormer and siding. construction of new elevator shaft. install 20 amp 220v circuit for elevator equipment | $50,000 |
| Oct 17, 2019 | Completed final sign-off Dec 2019 | 3744 22nd St | James J Tarter Builder | correction of nov 201983141 re-attachnment of exterior wood deck joistDetails
correction of nov 201983141 re-attachnment of exterior wood deck joist | $1,000 |
| Aug 19, 2014 | Completed final sign-off Oct 2014 | 1800 Union St | Mason Mechanical Services | install central heating & cooling with duct work. heat pump. t.i. pa# 201408012784Details
install central heating & cooling with duct work. heat pump. t.i. pa# 201408012784 | $12,000 |
| Aug 1, 2014 | Completed final sign-off Oct 2014 | 1800 Union St | James J Tarter Builder | remodel existing retail space on 1st floor to inlcude new partitions, lighting, electrical, ada. restroom to accomodate new medical clinic. change of use from retail to clinic.Details
remodel existing retail space on 1st floor to inlcude new partitions, lighting, electrical, ada. restroom to accomodate new medical clinic. change of use from retail to clinic. | $35,000 |
| May 9, 2014 | Completed final sign-off Oct 2014 | 75 Lansing St | work @ unit# 1 only. conversion from office use to residential use @ ground floor. (no work).Details
work @ unit# 1 only. conversion from office use to residential use @ ground floor. (no work). | ||
| Dec 13, 2012 | Completed final sign-off Jan 2013 | 1855 Market St | Pinnacle D B Inc. | 2nd fl, non-structural, non-rated t.i. steel std framing. electrical hvac, drywall, minor plumbing, misc interior finishes. no fire sprinkler, no fire alarm work.Details
2nd fl, non-structural, non-rated t.i. steel std framing. electrical hvac, drywall, minor plumbing, misc interior finishes. no fire sprinkler, no fire alarm work. | $40,000 |
| Feb 6, 2012 | Completed final sign-off Oct 2012 | 257 29th St | Pinnacle D B Inc. | interior remodel lower & uppre level, demo (e) int. walls, update bath & kitchen finishes lower & uper levels. relocate interior stairs, elet. & plumbing work. lower level 2-bedrooms, 1-bath, upper level (n) bath, library/den.Details
interior remodel lower & uppre level, demo (e) int. walls, update bath & kitchen finishes lower & uper levels. relocate interior stairs, elet. & plumbing work. lower level 2-bedrooms, 1-bath, upper level (n) bath, library/den. | $105,000 |