Kevin Treat
- Listed as
- attorney, engineer
- Firm
- Kpw Structural Engineering
- Based in
- Oakland
- On San Francisco permits
- May 2014 to Jul 2021
10 permits since 2000 (engineer on 9 permits, attorney on 1 permit): 4 completed, 3 never finaled, 3 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 28, 2021 | Never finaled issued Sep 2021, no final | 3106 Turk Bl | demo interior wall between kitchen & living room and replace with new structural wood beam and post.Details
demo interior wall between kitchen & living room and replace with new structural wood beam and post. | $5,000 | |
| Jul 20, 2021 | Never finaled issued Sep 2021, no final | 2223 North Point St | Jeff Conrad Builders | partial voluntary lateral upgrade consisting of adding new plywood shear walls at garage.Details
partial voluntary lateral upgrade consisting of adding new plywood shear walls at garage. | $110,000 |
| Jul 23, 2020 | Completed final sign-off Apr 2021 | 2800 Turk Bl | Cahill Contractors Llc. | design anchorages for the project equipment such as refrigeration equipment, broilers, stoves, wire shelving and hood supports.Details
design anchorages for the project equipment such as refrigeration equipment, broilers, stoves, wire shelving and hood supports. | |
| Jul 20, 2020 | Completed final sign-off Apr 2022 | 1185 Market St | Eric F Anderson Incorporated | first time tenant improvement for a new whole foods to occupy existing shell space. walls, fixtures, mech, elec, plumbing, lighting, structural, refrigeration - reach-ins & walk-ins, restrooms, equipment support platforms, concrete topping slab.Details
first time tenant improvement for a new whole foods to occupy existing shell space. walls, fixtures, mech, elec, plumbing, lighting, structural, refrigeration - reach-ins & walk-ins, restrooms, equipment support platforms, concrete topping slab. | $12,000,000 |
| Aug 13, 2019 | Completed final sign-off Apr 2021 | 2800 Turk Bl | Cahill Contractors Llc., Devcon Construction | rev to 201710110911.accom prop arch layout-new openings will add to (e)concrete wall w/remain portion wall strengthened by inc thickens of wall&infill(e)opening by casting new concrete against (e)wall&tying 2 walls together via epoxy dowels.Details
rev to 201710110911.accom prop arch layout-new openings will add to (e)concrete wall w/remain portion wall strengthened by inc thickens of wall&infill(e)opening by casting new concrete against (e)wall&tying 2 walls together via epoxy dowels. | $75,000 |
| Dec 20, 2018 | Expired or cancelled cancelled Jan 2026 | 1433 Bush St | automated carlift to be built in basement. ref #201605318777.Details
automated carlift to be built in basement. ref #201605318777. | ||
| Dec 20, 2018 | Expired or cancelled withdrawn Jul 2021 | 1532 Harrison St | automated carlift to be built in basement. automated parking w/line side voltage via disconnect(s) provided by gc/ec. ref #201607253262. maher naDetails
automated carlift to be built in basement. automated parking w/line side voltage via disconnect(s) provided by gc/ec. ref #201607253262. maher na | ||
| Oct 11, 2017 | Completed final sign-off Apr 2021 | 2800 Turk Bl | Cahill Contractors Llc. | interior renovation of (e)dinning hall within (e)education bldg; include partitions, cooler boxes, food service equip, storefront windows & doors, & mep. erect new dining hall pavilion & covered pedestrian walkingDetails
interior renovation of (e)dinning hall within (e)education bldg; include partitions, cooler boxes, food service equip, storefront windows & doors, & mep. erect new dining hall pavilion & covered pedestrian walking | $4,431,584 |
| May 13, 2016 | Never finaled issued Jan 2017, no final | 515 John Muir Dr | Proforma Construction Inc. | voluntary structural strengthening to (e) 7 story apartment building.Details
voluntary structural strengthening to (e) 7 story apartment building. | $180,000 |
| May 29, 2014 | Expired or cancelled withdrawn May 2015 | 3900 24th St | one storyportions west of historic residence, raze the one story portions, build a new 3 story addition to the historic bldg with retail on the ground floor, and residential on the two stories above, roof deck on new construction. rebuild private garage on ne corner.Details
one storyportions west of historic residence, raze the one story portions, build a new 3 story addition to the historic bldg with retail on the ground floor, and residential on the two stories above, roof deck on new construction. rebuild private garage on ne corner. | $700,000 |