Kevin Capitolo
- Listed as
- engineer
- Firm
- Street Capitolo Knowles Llp
- On San Francisco permits
- Nov 2022 to Jul 2026
10 permits since 2000 (engineer on 10 permits): 8 in progress, 2 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 27, 2026 | In progress issued Aug 2026 | 2961 Broderick St | Colindres & Associates | rev to pa# 2026-0417-9680: new kitchen range exhause hood on the 2nd fl.Details
rev to pa# 2026-0417-9680: new kitchen range exhause hood on the 2nd fl. | $2,500 |
| May 27, 2026 | In progress issued Jun 2026 | 1950 15th St | Jeff King And Company Inc | 1/f: remodel of kitchen and bathroom, new bathroom window replacing (e). new casework in bedroom #1.Details
1/f: remodel of kitchen and bathroom, new bathroom window replacing (e). new casework in bedroom #1. | $260,000 |
| May 14, 2026 | In progress issued Sep 2026 | 20 Graystone Tr | Crown Construction San Francisco | new mat slab foundation with new conditioned space at 1st floor,including new area under 2nd floor kitchen footprint; new exterior stairs;infill 2 levels of existing lightwell; limited interior remodel.Details
new mat slab foundation with new conditioned space at 1st floor,including new area under 2nd floor kitchen footprint; new exterior stairs;infill 2 levels of existing lightwell; limited interior remodel. | $850,000 |
| Feb 2, 2026 | In progress issued May 2026 | 82 14th St | Cookline Construction Inc | add second floor addition 897 sf to an (e) restaurant.to add storage,seating, and supplemental kitchen area.add (n) stair access/egress fire,new 1hrrated walls and ceiling/roof assembly,interior finisehes,new mep construction for kitchen/roof mounted equipment.ada baths by 2019 code.f/s sep permit.Details
add second floor addition 897 sf to an (e) restaurant.to add storage,seating, and supplemental kitchen area.add (n) stair access/egress fire,new 1hrrated walls and ceiling/roof assembly,interior finisehes,new mep construction for kitchen/roof mounted equipment.ada baths by 2019 code.f/s sep permit. | $400,000 |
| Oct 6, 2025 | In progress issued Oct 2025 | 2151 Laguna St | Peter Downey Construction Co., Inc. | revision to pa 202507281761, unit 3 - new windows @ kitchen/pantry; removal of kitchen wall w/added ceiling joists; add adjustments to power & lighing; (n) gas fireplace w/gas line for gas log kit; update primary bathroom layoutDetails
revision to pa 202507281761, unit 3 - new windows @ kitchen/pantry; removal of kitchen wall w/added ceiling joists; add adjustments to power & lighing; (n) gas fireplace w/gas line for gas log kit; update primary bathroom layout | |
| Mar 3, 2025 | In progress issued Mar 2025 | 1943 Lyon St | Northington Innovations Inc | interior remodel, infill of lightwell at 2nd level(with neighbor's permission) and new structuraal framing at attic & roof framingDetails
interior remodel, infill of lightwell at 2nd level(with neighbor's permission) and new structuraal framing at attic & roof framing | $50,000 |
| Jul 9, 2024 | In progress issued Jul 2024 | 1615 Monterey Bl | Proano Construction | revision to pa# 202307242839: (n) residential elevator, relocated guest bedroom, primary bedroom ceiling framing changes. previous work under pa# 202308013395 r5. to comply w/ nov# 202425593.Details
revision to pa# 202307242839: (n) residential elevator, relocated guest bedroom, primary bedroom ceiling framing changes. previous work under pa# 202308013395 r5. to comply w/ nov# 202425593. | $110,000 |
| Sep 15, 2023 | Never finaled issued Sep 2023, no final | 364 Union St | 4-Mac Construction | at rear bldg: replace foundation approx 13 linear ft. siding repair approx 400 sqftDetails
at rear bldg: replace foundation approx 13 linear ft. siding repair approx 400 sqft | $19,000 |
| Aug 1, 2023 | In progress issued Jun 2024 | 1615 Monterey Bl | Proano Construction | horizontal addition at basement, 1st and 2nd floor new rear and side yard patio and concrete pad configuration to align with alterations; note p/a 2023-7242-2839 submitted for an interior remodel, paper form 8 converted to form 3, dmj 09/17/2023;Details
horizontal addition at basement, 1st and 2nd floor new rear and side yard patio and concrete pad configuration to align with alterations; note p/a 2023-7242-2839 submitted for an interior remodel, paper form 8 converted to form 3, dmj 09/17/2023; | $300,000 |
| Nov 16, 2022 | Never finaled filed Nov 2022, never issued | 71 Jordan Av | expansion of primary bedroom onto (e) deck. bathroom remodel. extension of roofdeck.Details
expansion of primary bedroom onto (e) deck. bathroom remodel. extension of roofdeck. | $95,000 |