Keith Morris
- Listed as
- architect, authorized agent-others, designer, engineer
- Firm
- Studio Kda
- Based in
- Berkeley
- On San Francisco permits
- May 2001 to Dec 2022
40 permits since 2000 (architect on 37 permits, authorized agent-others on 1 permit, designer on 1 permit, engineer on 1 permit): 32 completed, 7 never finaled, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 21, 2022 | Completed final sign-off Jun 2023 | 399 Grove St | Tamalpais Construction Company | interior non structural tenant improvement in existing restaurant spaceDetails
interior non structural tenant improvement in existing restaurant space | $160,000 |
| Jul 1, 2022 | Never finaled issued Jul 2022, no final | 1177 California St | F J Sandoval Co | interior demo in commercial bar, office and storage spaces. no structural work. no change of use. no exterior alteration, no work visible from street.all work on lobby level and below on level a. filed under ab-017 - full accessibility compliance to be submitted in subsequent permitDetails
interior demo in commercial bar, office and storage spaces. no structural work. no change of use. no exterior alteration, no work visible from street.all work on lobby level and below on level a. filed under ab-017 - full accessibility compliance to be submitted in subsequent permit | $25,000 |
| Feb 12, 2019 | Never finaled issued Jun 2019, no final | 308 Broderick St | Cookline Construction Inc | outdoor seating only: sidewalk tables & chairs on (e) market hall. no construction or work to be done. outdoor electric heaters attached to facade under awning.Details
outdoor seating only: sidewalk tables & chairs on (e) market hall. no construction or work to be done. outdoor electric heaters attached to facade under awning. | |
| Feb 7, 2019 | Completed final sign-off May 2019 | 702 Valencia St | Cookline Construction Inc | minimal changes to be made to both food prep areas. including installation of new services station, pizza deck over, and dough prep line and some new light fixtures to replace existing. no ext changes. update (e) ada bathrooms to current code requirements.Details
minimal changes to be made to both food prep areas. including installation of new services station, pizza deck over, and dough prep line and some new light fixtures to replace existing. no ext changes. update (e) ada bathrooms to current code requirements. | $60,000 |
| Oct 16, 2018 | Completed final sign-off May 2019 | 702 Valencia St | C & C General Engineering Inc. | minor demo of existing pizza over only - no other work.Details
minor demo of existing pizza over only - no other work. | $2,940 |
| Sep 25, 2018 | Completed final sign-off Oct 2018 | 1030 Hyde St | change in use from limited restaurant to restaurant.Details
change in use from limited restaurant to restaurant. | ||
| Jun 15, 2018 | Completed final sign-off Jan 2019 | 306 Broderick St | Cookline Construction Inc | bar area remodel to a functioning restaurant. new extended bar and back bar. relocate extg bar equipment. relocate extg lighting and extg electrical outlets.Details
bar area remodel to a functioning restaurant. new extended bar and back bar. relocate extg bar equipment. relocate extg lighting and extg electrical outlets. | $37,752 |
| Apr 5, 2018 | Completed final sign-off Jan 2019 | 306 Broderick St | Cookline Construction Inc | sidewalk seating, replace existing awning, new heaters mep, fire under separate permit.Details
sidewalk seating, replace existing awning, new heaters mep, fire under separate permit. | $25,000 |
| Mar 23, 2018 | Completed final sign-off Mar 2019 | 121 Spear St | Novo Construction Inc | suite b7: design of a new service/fast casual restaurant with new open food prep service area, coffee/wine bar, closed back of house prep area, full cook line storage, dining, new equipment. modify entry and exit doors and storage front. n/a for maherDetails
suite b7: design of a new service/fast casual restaurant with new open food prep service area, coffee/wine bar, closed back of house prep area, full cook line storage, dining, new equipment. modify entry and exit doors and storage front. n/a for maher | $411,400 |
| Aug 31, 2016 | Never finaled issued Aug 2016, no final | 222 Battery St | Alsterlind Construction Inc. | demolition of e retail spaceDetails
demolition of e retail space | $4,000 |
| May 26, 2016 | Completed final sign-off Jan 2017 | 222 Battery St | Alsterlind Construction Inc. | change of use m to b for limited restaurant use. interior tenant improvement; plumbing, electrical, mech, lighting, finishes, food service equipment.Details
change of use m to b for limited restaurant use. interior tenant improvement; plumbing, electrical, mech, lighting, finishes, food service equipment. | $197,000 |
| Apr 21, 2016 | Completed final sign-off Jul 2022 | 3738 Irving St | Competente Construction Inc | new t.i build out including new gym area (e) ada restroom upgrades, interior lighting, plumbing & electrical.(e) mezzanine to be extended across change of use from office to gymDetails
new t.i build out including new gym area (e) ada restroom upgrades, interior lighting, plumbing & electrical.(e) mezzanine to be extended across change of use from office to gym | $95,000 |
| Mar 2, 2016 | Completed final sign-off May 2016 | 655 Montgomery St | Northern Sun Associates | t.i. from an extg flower service retail to new food service retail. improve new food prep. area, partition walls, casework, interior lighting, plumbing and electrical work. no changes to extg foot print, square footage or height.Details
t.i. from an extg flower service retail to new food service retail. improve new food prep. area, partition walls, casework, interior lighting, plumbing and electrical work. no changes to extg foot print, square footage or height. | $56,880 |
| Feb 19, 2016 | Completed final sign-off Apr 2017 | 100 Van Ness Av | R 3 Builders Inc. | revision to appl #201508184601 - scope is ot replace hog with air-maid system per sffd requirements , revised structural & mep plans. n/a maher ordinanceDetails
revision to appl #201508184601 - scope is ot replace hog with air-maid system per sffd requirements , revised structural & mep plans. n/a maher ordinance | $20,000 |
| Sep 29, 2015 | Completed final sign-off Jun 2016 | 100 Van Ness Av | R 3 Builders Inc. | no change to (e) bldg footprint,square footage,of height, ti. including (n) food prep area, retail/seating area,elec,mech & plmbg work with 1 new accessible restroom,signage & exterior seating area under separate permit,no changes to exterior facade;maher n/aDetails
no change to (e) bldg footprint,square footage,of height, ti. including (n) food prep area, retail/seating area,elec,mech & plmbg work with 1 new accessible restroom,signage & exterior seating area under separate permit,no changes to exterior facade;maher n/a | $128,000 |
| Sep 29, 2015 | Never finaled issued Oct 2015, no final | 1 Market St | Northern Sun Associates | tenant improvement from an (e) food service tenant to a new food service - new food prep area, partitoin walls, casework, interior lighting, plumbing, electrical & mechanical. no changes to exterior envelope. ref # 200904272112 & 201004301402. n/a maher ordinanceDetails
tenant improvement from an (e) food service tenant to a new food service - new food prep area, partitoin walls, casework, interior lighting, plumbing, electrical & mechanical. no changes to exterior envelope. ref # 200904272112 & 201004301402. n/a maher ordinance | $120,000 |
| Aug 18, 2015 | Completed final sign-off Apr 2017 | 100 Van Ness Av | R 3 Builders Inc. | ti for (n) restaurant on g/f work includes (n) equipment, fixtures, finishes, restrooms, mep (n) ext. doors steps and risers. fire protection and signage under separate permit. n/a for maher ordinance.Details
ti for (n) restaurant on g/f work includes (n) equipment, fixtures, finishes, restrooms, mep (n) ext. doors steps and risers. fire protection and signage under separate permit. n/a for maher ordinance. | $311,000 |
| Jul 22, 2015 | Never finaled issued Jul 2015, no final | 12 Geary St | Greentree Design/Build | revision to 201503120671. revision to lighting/electrical plan and title 24 reportDetails
revision to 201503120671. revision to lighting/electrical plan and title 24 report | $93,330 |
| Jun 30, 2015 | Completed final sign-off Jan 2016 | 350 California St | Northern Sun Associates | no change to extg bldg foot print, square footage, or light. t.i. from an extg food services retail tenant to new food service retail tenant. new food prep area, partition walls, casework, interior lighting, plmg and electrical work. n/a for maher. no exterior work no change of use proposed.Details
no change to extg bldg foot print, square footage, or light. t.i. from an extg food services retail tenant to new food service retail tenant. new food prep area, partition walls, casework, interior lighting, plmg and electrical work. n/a for maher. no exterior work no change of use proposed. | $74,700 |
| Mar 19, 2015 | Completed final sign-off Aug 2015 | 121 Spear St | Alsterlind Construction Inc. | 1st flr: ti of (e) food service tenant to new food service tenant with modifications including new food prep area, partition walls, casework, interior lighting, plumbing and electrical work.. signage & exterior trellis under seperate permit.Details
1st flr: ti of (e) food service tenant to new food service tenant with modifications including new food prep area, partition walls, casework, interior lighting, plumbing and electrical work.. signage & exterior trellis under seperate permit. | $175,890 |
| Mar 12, 2015 | Completed final sign-off Sep 2015 | 12 Geary St | Greentree Design/Build | existing retail art gallery to be renovated for new retail tea sales, tea drinks including retail area, service counters, interior lighting, plumbing, electric work. e ada bath to remain. n/a ordinance #155-13Details
existing retail art gallery to be renovated for new retail tea sales, tea drinks including retail area, service counters, interior lighting, plumbing, electric work. e ada bath to remain. n/a ordinance #155-13 | $93,330 |
| Jan 28, 2015 | Completed final sign-off Apr 2015 | 100 Montgomery St | Northern Sun Associates | suite 116 - t.i. from (e) food service retail "yogurt" to a new food service retail tenant include new food prep area, partition walls, casework, interior lighting, plumbing & electrical work. n/a maher ordinanceDetails
suite 116 - t.i. from (e) food service retail "yogurt" to a new food service retail tenant include new food prep area, partition walls, casework, interior lighting, plumbing & electrical work. n/a maher ordinance | $74,700 |
| Apr 9, 2014 | Completed final sign-off Dec 2014 | 186 02nd St | Baba Builders Co | t.i. including new commercial kitchen, food prep area, seating area, retail areas, electrical, mechanical and plmg work with new accessible bathrooms. n/a for the maher ordinance #155-13Details
t.i. including new commercial kitchen, food prep area, seating area, retail areas, electrical, mechanical and plmg work with new accessible bathrooms. n/a for the maher ordinance #155-13 | $276,000 |
| Dec 30, 2013 | Never finaled issued Jan 2014, no final | 186 02nd St | Baba Builders Co | demo work including removal of e non load bearing partition walls, finishes and fixtures in preperation for proposefd future tenant use (under separate permit)Details
demo work including removal of e non load bearing partition walls, finishes and fixtures in preperation for proposefd future tenant use (under separate permit) | $4,000 |
| Nov 22, 2013 | Completed final sign-off Mar 2015 | 670 Larkin St | existing restaurant t. i. /renovation including renovated comm kitchen, food prep area, seating area, interior lighting, plumbing & electrical work, new accessible bathroom & partial storefront. mech under separate permit. expose & repair/preserve original transom window.Details
existing restaurant t. i. /renovation including renovated comm kitchen, food prep area, seating area, interior lighting, plumbing & electrical work, new accessible bathroom & partial storefront. mech under separate permit. expose & repair/preserve original transom window. | $185,200 | |
| Aug 22, 2013 | Completed final sign-off Jun 2014 | 653 Union St | S4s Construction Inc | new tenant remodel in existing restaurant space. renovation includes renovated commercial kitchen, food prep area, seating area, interior lighting, plumbing and electrical work and renovated accessible bathroom. comply with nov 200668837/201271123. sprinkler and fp system separate permitsDetails
new tenant remodel in existing restaurant space. renovation includes renovated commercial kitchen, food prep area, seating area, interior lighting, plumbing and electrical work and renovated accessible bathroom. comply with nov 200668837/201271123. sprinkler and fp system separate permits | $245,000 |
| Aug 20, 2013 | Completed final sign-off Dec 2013 | 2323 Polk St | Northern Sun Associates | existing restaurant tenant improvement/renovation including renovated commercial kitchen, food prep area, seating area, interior lighting, plumbing and electrical work and new accessible bathroomDetails
existing restaurant tenant improvement/renovation including renovated commercial kitchen, food prep area, seating area, interior lighting, plumbing and electrical work and new accessible bathroom | $155,400 |
| Mar 27, 2013 | Completed final sign-off Jan 2014 | 718 Irving St | Alsterlind Construction Inc., Benjamin Construction Pc | build out kitchen, ada compliant bathroom, cosmetic alteration, removal of ceiling. change of use form retail to limited restaurant.Details
build out kitchen, ada compliant bathroom, cosmetic alteration, removal of ceiling. change of use form retail to limited restaurant. | $100,000 |
| Dec 7, 2012 | Completed final sign-off Jun 2013 | 1030 Hyde St | Alsterlind Construction Inc. | renovation of extg commercial space to include new store front curtain wall to replace extg, new commercial baking kitchen with type 2 hood, new equipment, food prep/service area. seating area, interior lighting, plmg and electrical work.Details
renovation of extg commercial space to include new store front curtain wall to replace extg, new commercial baking kitchen with type 2 hood, new equipment, food prep/service area. seating area, interior lighting, plmg and electrical work. | $134,000 |
| Sep 17, 2012 | Expired or cancelled expired Oct 2017 | 208 Hoffman Av | Builder Max Inc. | residential remodel including ground fl & 2nd flr. addition: new 2nd flr. bathroom, new 1st flr. living area & 1/2 bathrooms, interior lighting, plumbing & electrical work.Details
residential remodel including ground fl & 2nd flr. addition: new 2nd flr. bathroom, new 1st flr. living area & 1/2 bathrooms, interior lighting, plumbing & electrical work. | $160,000 |
| May 4, 2012 | Never finaled issued May 2012, no final | 1527 Fillmore St | Alsterlind Construction Inc. | new tenant improvement build out including new commercial kitchen. prep areas, seating area, interior lighting, plmbg, electrical work, new ada bathroom. ref app #201105025142 (s)Details
new tenant improvement build out including new commercial kitchen. prep areas, seating area, interior lighting, plmbg, electrical work, new ada bathroom. ref app #201105025142 (s) | $187,000 |
| Mar 15, 2012 | Completed final sign-off Jul 2012 | 4028 24th St | Alsterlind Construction Inc. | tenant improvement including new food prep area, seating, retail areas, interior lighting, plumbing, and electric. change use from retail to small self service restaurant. note: change of use approval# 18555 cpc motion.Details
tenant improvement including new food prep area, seating, retail areas, interior lighting, plumbing, and electric. change use from retail to small self service restaurant. note: change of use approval# 18555 cpc motion. | $85,000 |
| Feb 2, 2012 | Completed final sign-off May 2012 | 1224 09th Av | Alsterlind Construction Inc. | revision to pa# 2011-1108-8481-new interior lighting, new basement partition walls & prep equipmentDetails
revision to pa# 2011-1108-8481-new interior lighting, new basement partition walls & prep equipment | $10,000 |
| Nov 8, 2011 | Completed final sign-off May 2012 | 1224 09th Av | Alsterlind Construction Inc. | modify (e) 42" high counter bar/die wall for ada height. remodel (e) bathroom for ada compliance. install new curtain wall system at remodeled store front. remove (e) awning for comply with nov #200715829.Details
modify (e) 42" high counter bar/die wall for ada height. remodel (e) bathroom for ada compliance. install new curtain wall system at remodeled store front. remove (e) awning for comply with nov #200715829. | $22,000 |
| Dec 22, 2010 | Completed final sign-off Mar 2011 | 2015 Fillmore St | Alsterlind Construction Inc. | tenant improvement bun mee. install new cookline, hood, mech, plbg, elec, new ada bathroom, new interior lighting and finishes.Details
tenant improvement bun mee. install new cookline, hood, mech, plbg, elec, new ada bathroom, new interior lighting and finishes. | $119,700 |
| Dec 17, 2008 | Completed final sign-off Feb 2009 | 306 Broderick St | Alsterlind Construction Inc. | revision to application 20809050880, lighting revision w t-24 revisions.Details
revision to application 20809050880, lighting revision w t-24 revisions. | |
| Sep 5, 2008 | Completed final sign-off Feb 2009 | 306 Broderick St | tenant improvement of 1284 sq.ft. on ground floor. new kitchen and dining area. new accessible restrooms and interior finishes. no exterior work.Details
tenant improvement of 1284 sq.ft. on ground floor. new kitchen and dining area. new accessible restrooms and interior finishes. no exterior work. | $420,000 | |
| Aug 28, 2008 | Completed final sign-off Mar 2009 | 850 Powell St | Bay Area Space Improvement | remodel bathroom, add recessed lighting, remove bathtub/shower to add space to closet. install shelves, paint walls, refinish floor in bedrooms.Details
remodel bathroom, add recessed lighting, remove bathtub/shower to add space to closet. install shelves, paint walls, refinish floor in bedrooms. | $42,500 |
| Jun 14, 2006 | Completed final sign-off Apr 2007 | 26 Atalaya Tr | Gavin Painting & Cont* See 934867* | new 3rd floor 1 kitchen renovation to include new cabinets, counters, finishes electrical & lighting. replace (e) kitchen rear exterior 1 door, new transome window above. glazing to be safty glass x header to be 4 x 6 min.Details
new 3rd floor 1 kitchen renovation to include new cabinets, counters, finishes electrical & lighting. replace (e) kitchen rear exterior 1 door, new transome window above. glazing to be safty glass x header to be 4 x 6 min. | $47,600 |
| May 25, 2001 | Completed final sign-off Dec 2001 | 814 Mission St | hore & strobe/emergency lightDetails
hore & strobe/emergency light | $2,000 |