382 permits since 2000 (contractor on 382 permits, authorized agent-others on 3 permits): 289 completed, 25 never finaled, 68 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. Their ranked record as a contractor is on their contractor page. How to read these records
Most recent permits
Showing the 100 most recent of 382.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 26, 2024 | Completed final sign-off May 2025 | 55 Stockton St | Paradigm General Contractors | suite 700/7th fl ti demo of non structural partitions and building non structural partitions. new millwork, new finishes.e full floor suite will be demised into 2 suites. mep included. deferred submitted sep revised life safety work will be design build. bldg fully sprinkleredDetails
suite 700/7th fl ti demo of non structural partitions and building non structural partitions. new millwork, new finishes.e full floor suite will be demised into 2 suites. mep included. deferred submitted sep revised life safety work will be design build. bldg fully sprinklered | $637,537 |
| Dec 4, 2023 | Completed final sign-off May 2024 | 3316 24th St | Paradigm General Contractors | revision to pa# 202212289285 & 202111011541 non-structural revisions, revise elevator from sec.5.2 to article 15 elevator per oshsb variance. provide hoistway platform for state elevator d.o.s.h approval of dec, 15, 2023Details
revision to pa# 202212289285 & 202111011541 non-structural revisions, revise elevator from sec.5.2 to article 15 elevator per oshsb variance. provide hoistway platform for state elevator d.o.s.h approval of dec, 15, 2023 | |
| Nov 20, 2023 | Completed final sign-off Mar 2024 | 2001 Van Ness Av | Paradigm General Contractors | t.i.suite 407: scope of work shall include new interior non-bearing partition walls, acoustic ceilings, built-in casemwork. insterior finishes, lighting, power/data, hvac distribution & associatedDetails
t.i.suite 407: scope of work shall include new interior non-bearing partition walls, acoustic ceilings, built-in casemwork. insterior finishes, lighting, power/data, hvac distribution & associated | $400,000 |
| Sep 18, 2023 | Completed final sign-off Sep 2023 | 55 Stockton St | Paradigm General Contractors | 7/f revision to pa# 202303093308, to relocate new ada toilet to opposite side due to existing bldg vertical pipes. no change of use.Details
7/f revision to pa# 202303093308, to relocate new ada toilet to opposite side due to existing bldg vertical pipes. no change of use. | |
| Jun 6, 2023 | Completed final sign-off Jun 2023 | 430 Bush St | Paradigm General Contractors | ground floor. to obtain final inspection for work approved under permit application #2020-02-05-3560. all work is complete.Details
ground floor. to obtain final inspection for work approved under permit application #2020-02-05-3560. all work is complete. | $12,000 |
| Apr 14, 2023 | Completed final sign-off Jun 2023 | 55 Stockton St | Paradigm General Contractors | deferred mechanical for 202205053663Details
deferred mechanical for 202205053663 | |
| Mar 9, 2023 | Completed final sign-off Sep 2023 | 55 Stockton St | Paradigm General Contractors | 7/f: internal removations, architectural and meps (1708 sqft) no change of use. fully sprinklered bldg. (suite 700/balconies not occupied, under separate permit for future tenant)Details
7/f: internal removations, architectural and meps (1708 sqft) no change of use. fully sprinklered bldg. (suite 700/balconies not occupied, under separate permit for future tenant) | $429,250 |
| Feb 8, 2023 | Completed final sign-off Aug 2023 | 388 Market St | Paradigm General Contractors | 13th fl - upgrade mechanical & electrical. no tenant occupied. ref pa 2023-0106-9757 & 2022-0118-6116 (fire upgrade)Details
13th fl - upgrade mechanical & electrical. no tenant occupied. ref pa 2023-0106-9757 & 2022-0118-6116 (fire upgrade) | $200,000 |
| Jan 6, 2023 | Completed final sign-off Feb 2023 | 388 Market St | Paradigm General Contractors | 13/flr: demo interior partitions, doors, frames plumbing fixtures, floorsDetails
13/flr: demo interior partitions, doors, frames plumbing fixtures, floors | $100,000 |
| Dec 28, 2022 | Completed final sign-off Mar 2023 | 3316 24th St | Paradigm General Contractors | revision to previously approved pa# 202207138326. non structural revisions. relocate transfer fan outside of control room, revise 60-min hollow metal door and frame to 60-min wood door and frame. work located at ground floor.Details
revision to previously approved pa# 202207138326. non structural revisions. relocate transfer fan outside of control room, revise 60-min hollow metal door and frame to 60-min wood door and frame. work located at ground floor. | |
| Oct 31, 2022 | Completed final sign-off Jul 2023 | 55 Stockton St | Paradigm General Contractors | floors 7/8: project is proving new stainless steel. "horizontal" cables to the existing non compliant metal guradrails to tighten up picket spacing.Details
floors 7/8: project is proving new stainless steel. "horizontal" cables to the existing non compliant metal guradrails to tighten up picket spacing. | $175,000 |
| Oct 6, 2022 | Completed final sign-off Apr 2023 | 55 Stockton St | Paradigm General Contractors | 8th fl interior renovation. approx construction area 6,755 sqft. scope includes architectural and meps.Details
8th fl interior renovation. approx construction area 6,755 sqft. scope includes architectural and meps. | $1,925,021 |
| Sep 16, 2022 | Expired or cancelled cancelled May 2023 | 55 Stockton St | Paradigm General Contractors | 5th fl interior renovation. approx scope area 585 sqft. scope includes architectural, electrical, plumbing & mechanical. bldg is fully sprinklered.Details
5th fl interior renovation. approx scope area 585 sqft. scope includes architectural, electrical, plumbing & mechanical. bldg is fully sprinklered. | $260,000 |
| Aug 25, 2022 | Completed final sign-off Feb 2023 | 388 Market St | Paradigm General Contractors | revision to pa 202201256575. add to offices add electrical for (e) ev charges . mechanical for 202201256575 and electrical.Details
revision to pa 202201256575. add to offices add electrical for (e) ev charges . mechanical for 202201256575 and electrical. | |
| Jul 13, 2022 | Completed final sign-off Mar 2023 | 3316 24th St | Paradigm General Contractors | revision to 202111011541. non structural revision to gr fl elevator control room and add hoistway vent.Details
revision to 202111011541. non structural revision to gr fl elevator control room and add hoistway vent. | $8,500 |
| Jun 16, 2022 | Completed final sign-off Apr 2023 | 55 Stockton St | Paradigm General Contractors | refurbish lobby entrance (n) exterior tile, refnishing (e) exterior doors and some signage (n) lighting and fixtures. mep deferred no change to exiting/egress.Details
refurbish lobby entrance (n) exterior tile, refnishing (e) exterior doors and some signage (n) lighting and fixtures. mep deferred no change to exiting/egress. | $5,000 |
| May 5, 2022 | Completed final sign-off Jun 2023 | 55 Stockton St | Paradigm General Contractors | refurbish (e) lobby. work includes (n) floor, (n) wall & (n) ceiling finishes as well as lighting & fixtures. mep deferred.Details
refurbish (e) lobby. work includes (n) floor, (n) wall & (n) ceiling finishes as well as lighting & fixtures. mep deferred. | $65,000 |
| Apr 28, 2022 | Completed final sign-off Jan 2023 | 2001 Van Ness Av | Paradigm General Contractors | 3/f suite 300: interior t.i includeds new non-load bearing partitions, ceilings, finishes, and mep. to comply with nov 202185634.Details
3/f suite 300: interior t.i includeds new non-load bearing partitions, ceilings, finishes, and mep. to comply with nov 202185634. | $1,200,000 |
| Mar 23, 2022 | Completed final sign-off Sep 2022 | 2100 Chestnut St | Paradigm General Contractors | revision to pa# 2022-0118-6133 interior t.i: change of use from retail store to bank. (e) retail space connect to wells fargo bank:Details
revision to pa# 2022-0118-6133 interior t.i: change of use from retail store to bank. (e) retail space connect to wells fargo bank: | |
| Jan 25, 2022 | Completed final sign-off Feb 2023 | 388 Market St | Paradigm General Contractors | suite 1040: tenant improvement to include office open area, conferance room, breakroom. add new car charging station.Details
suite 1040: tenant improvement to include office open area, conferance room, breakroom. add new car charging station. | $176,620 |
| Jan 18, 2022 | Completed final sign-off Sep 2022 | 2100 Chestnut St | Paradigm General Contractors | tenant improvement interior ti in (e) shell space, including including interior walk-up atms, for (n) wells fargo bank; the proposal is to establish a formula retail use to dba wells fargo @ 2100 chestnut st (currently occupied by pottery barn). the proposed project will allow (e) wells fargoDetails
tenant improvement interior ti in (e) shell space, including including interior walk-up atms, for (n) wells fargo bank; the proposal is to establish a formula retail use to dba wells fargo @ 2100 chestnut st (currently occupied by pottery barn). the proposed project will allow (e) wells fargo | $561,470 |
| Jan 18, 2022 | Completed final sign-off Mar 2023 | 3316 24th St | Paradigm General Contractors | revision to pa 2021-1101-1541 non structural revisions to include restroom partitions reconfiguration due to (e) structural conditions and raised floor to accommodate existing plumbing. revised door location 2 reception due to existing structural condition. no changes to fixture countDetails
revision to pa 2021-1101-1541 non structural revisions to include restroom partitions reconfiguration due to (e) structural conditions and raised floor to accommodate existing plumbing. revised door location 2 reception due to existing structural condition. no changes to fixture count | $15,000 |
| Nov 1, 2021 | Completed final sign-off May 2024 | 3316 24th St | Paradigm General Contractors | install new 2-step article 15 elevator at stairwell, renovate restrooms to be accessible, renovate adjacent offices, circulation spaces and upgrade storage room.Details
install new 2-step article 15 elevator at stairwell, renovate restrooms to be accessible, renovate adjacent offices, circulation spaces and upgrade storage room. | $700,000 |
| Oct 29, 2021 | Completed final sign-off May 2022 | 560 Mission St | Paradigm General Contractors | interior tenant improvements to part of 25th fl office space. new partitions, doors, ceilingsDetails
interior tenant improvements to part of 25th fl office space. new partitions, doors, ceilings | $162,000 |
| Aug 26, 2021 | Completed final sign-off Mar 2022 | 55 Stockton St | Paradigm General Contractors | 5/6/7 fl: demo of non-structural partitions, celings, hvac and plumbing.(e) occpy use, egress system, fire rating and constr type unchanged. to comply to ab-017. fire spirnkler heads shall be turned up under pa202108246992.Details
5/6/7 fl: demo of non-structural partitions, celings, hvac and plumbing.(e) occpy use, egress system, fire rating and constr type unchanged. to comply to ab-017. fire spirnkler heads shall be turned up under pa202108246992. | $205,000 |
| Jun 1, 2021 | Completed final sign-off Jul 2022 | 30 Hotaling Pl | Paradigm General Contractors | t-24 eltrical deferred submitted. ref pa 202101122511.Details
t-24 eltrical deferred submitted. ref pa 202101122511. | |
| Jan 12, 2021 | Completed final sign-off Jul 2022 | 30 Hotaling Pl | Paradigm General Contractors | t.i. 1st floor lobby, 2nd and 3rd flr tenant improvement. walls, finishes. no mech/ plumbing. electrical dederred.Details
t.i. 1st floor lobby, 2nd and 3rd flr tenant improvement. walls, finishes. no mech/ plumbing. electrical dederred. | $120,000 |
| Dec 8, 2020 | Completed final sign-off May 2021 | 30 Hotaling Pl | Paradigm General Contractors | soft demo of existing finishes, non-structural partitions. 2nd, 3rd floor. ab-017 - soft demo only.Details
soft demo of existing finishes, non-structural partitions. 2nd, 3rd floor. ab-017 - soft demo only. | $2,000 |
| Feb 5, 2020 | Never finaled issued Feb 2020, no final | 430 Bush St | Paradigm General Contractors | construction of 32'w x 12'h art installation @ existing office at g/f. installation of structural hanging display bridge.Details
construction of 32'w x 12'h art installation @ existing office at g/f. installation of structural hanging display bridge. | $12,000 |
| Dec 13, 2019 | Completed final sign-off Mar 2021 | 430 Bush St | Paradigm General Contractors | no change use of occupancy. no change in egress or exit no change to structure. no extrerior or envelope changes. construction of (2) display monitors at existing office at ground floor.Details
no change use of occupancy. no change in egress or exit no change to structure. no extrerior or envelope changes. construction of (2) display monitors at existing office at ground floor. | $12,000 |
| Oct 2, 2019 | Completed final sign-off Sep 2020 | 343 Sansome St | Paradigm General Contractors | 11th floor: office remodel of (n) conference rooms, huddle rooms, focus rooms, & break room, new furniture & finishes, upgrade all fixtures to new led lighting hvac upgrade for new remodelDetails
11th floor: office remodel of (n) conference rooms, huddle rooms, focus rooms, & break room, new furniture & finishes, upgrade all fixtures to new led lighting hvac upgrade for new remodel | $950,000 |
| Jul 23, 2019 | Completed final sign-off Sep 2019 | 55 Stockton St | Paradigm General Contractors | 4th fl - revision to pa 2019-0416-8103 adding a sink in women's room accessible stallDetails
4th fl - revision to pa 2019-0416-8103 adding a sink in women's room accessible stall | |
| Jul 19, 2019 | Completed final sign-off Feb 2020 | 388 Market St | Paradigm General Contractors | suite #860: t.i. lighting, partition walls, finishes, hvac, electricalDetails
suite #860: t.i. lighting, partition walls, finishes, hvac, electrical | $200,000 |
| Jul 19, 2019 | Completed final sign-off Jan 2020 | 388 Market St | Paradigm General Contractors | suite #820: t.i. combining ste 820 and 850. 3450 sqft. new lighting layout, partition, hvac upgrades, and finishes.Details
suite #820: t.i. combining ste 820 and 850. 3450 sqft. new lighting layout, partition, hvac upgrades, and finishes. | $200,000 |
| May 13, 2019 | Completed final sign-off May 2020 | 430 Bush St | Paradigm General Contractors | 3rd fl l- ti of interior office. select demo and limited construction, partition walls and upgrades to interior finishes; no change to structure. no structure or building envelope changes.Details
3rd fl l- ti of interior office. select demo and limited construction, partition walls and upgrades to interior finishes; no change to structure. no structure or building envelope changes. | $50,000 |
| May 13, 2019 | Completed final sign-off Dec 2019 | 430 Bush St | Paradigm General Contractors | 6th fl - ti of interior office spaces. demo and limited construction of partition walls, upgrades to interior finishes and restroom accessibility. no change to structure, no exterior of building envelope changes.Details
6th fl - ti of interior office spaces. demo and limited construction of partition walls, upgrades to interior finishes and restroom accessibility. no change to structure, no exterior of building envelope changes. | $1,000,000 |
| May 8, 2019 | Completed final sign-off Feb 2020 | 430 Bush St | Paradigm General Contractors | tenant improvement of interior office spaces at floor 1 to include slelect demolition and limited construction of partition walls, upgrades to interior finishes and restrooms. no exterior workDetails
tenant improvement of interior office spaces at floor 1 to include slelect demolition and limited construction of partition walls, upgrades to interior finishes and restrooms. no exterior work | $1,500,000 |
| May 6, 2019 | Completed final sign-off Feb 2020 | 430 Bush St | Paradigm General Contractors | 2nd flr - ti - select demo and limited construction of partition walls, upgrade to interior finishes and restroom accessibility, no change to structure, no exterior or bld envelope changesDetails
2nd flr - ti - select demo and limited construction of partition walls, upgrade to interior finishes and restroom accessibility, no change to structure, no exterior or bld envelope changes | $1,500,000 |
| May 6, 2019 | Completed final sign-off Jun 2020 | 430 Bush St | Paradigm General Contractors | 4th flr - ti - select demo and limited construction of partition walls, upgrade to interior finishes and restroom accessibility, no change to structure, no exterior or bld envelope changes. maher n/a.Details
4th flr - ti - select demo and limited construction of partition walls, upgrade to interior finishes and restroom accessibility, no change to structure, no exterior or bld envelope changes. maher n/a. | $1,500,000 |
| Apr 30, 2019 | Completed final sign-off Oct 2019 | 55 Stockton St | Paradigm General Contractors | 4th fl - meps for 2019-0416-8103Details
4th fl - meps for 2019-0416-8103 | $500,000 |
| Apr 16, 2019 | Completed final sign-off Sep 2019 | 55 Stockton St | Paradigm General Contractors | 4th fl ti demo of on structural partitions and buildin new non str partitions. mep under separate permit, life safety and sprinkler under sep permit. bldg is fully sprinkleredDetails
4th fl ti demo of on structural partitions and buildin new non str partitions. mep under separate permit, life safety and sprinkler under sep permit. bldg is fully sprinklered | $480,000 |
| Apr 4, 2019 | Completed final sign-off Apr 2019 | 4648 Mission St | Paradigm General Contractors | revision to app#201802232101. removal of using extg timeclock in the electrical roomDetails
revision to app#201802232101. removal of using extg timeclock in the electrical room | |
| Apr 4, 2019 | Completed final sign-off Jun 2019 | 530 Washington St | Paradigm General Contractors | replace 4 existing lights with new/t-24 plans. add drinking fountain. ref ti pa #201902153029.Details
replace 4 existing lights with new/t-24 plans. add drinking fountain. ref ti pa #201902153029. | $1,000 |
| Feb 20, 2019 | Completed final sign-off May 2019 | 560 Mission St | Paradigm General Contractors | revision to pa #201710060628. relocation of the women's accessible toilet fixture and accesories to the opposite side of the stall.Details
revision to pa #201710060628. relocation of the women's accessible toilet fixture and accesories to the opposite side of the stall. | $30,500 |
| Feb 15, 2019 | Completed final sign-off Jun 2019 | 530 Washington St | Paradigm General Contractors | interior t.i. of 2nd fl. construction of new interior non structural partitionsDetails
interior t.i. of 2nd fl. construction of new interior non structural partitions | $119,000 |
| Jan 30, 2019 | Completed final sign-off Feb 2019 | 530 Washington St | Paradigm General Contractors | demolition of non-structural walls of e office. per ab-017Details
demolition of non-structural walls of e office. per ab-017 | $3,000 |
| Dec 19, 2018 | Completed final sign-off Feb 2020 | 135 04th St | Paradigm General Contractors | 1/f: sharetea: (e) tenant interior remodel, relocating (e) equipment, install glaze above (e) wall, lighting replacement, plumbing. maher n/a. across from amc ticket counter.Details
1/f: sharetea: (e) tenant interior remodel, relocating (e) equipment, install glaze above (e) wall, lighting replacement, plumbing. maher n/a. across from amc ticket counter. | $143,000 |
| Nov 27, 2018 | Expired or cancelled cancelled Jan 2026 | 560 Mission St | Paradigm General Contractors | revision to da checklist for pa #201710060625Details
revision to da checklist for pa #201710060625 | |
| Nov 14, 2018 | Completed final sign-off Feb 2019 | 655 08th St | Paradigm General Contractors | rev to pa# 201806141916 & 201809251302 minor changes to mechanical & electrical per sffdDetails
rev to pa# 201806141916 & 201809251302 minor changes to mechanical & electrical per sffd | |
| Nov 2, 2018 | Completed final sign-off Dec 2018 | 560 Mission St | Paradigm General Contractors | to obtain final inspection for work approved under pa#20161092320 & 201707182208. all work is complete.Details
to obtain final inspection for work approved under pa#20161092320 & 201707182208. all work is complete. | |
| Sep 25, 2018 | Completed final sign-off Feb 2019 | 655 08th St | Paradigm General Contractors | revision to app#201806141916. t.i. interior build outDetails
revision to app#201806141916. t.i. interior build out | |
| Sep 21, 2018 | Completed final sign-off Mar 2019 | 388 Market St | Paradigm General Contractors | suite 1090: t.i. (2) offices, (1) conference, (1) break area new paint and finishes throughout. sprinkler and life safety under seperate submittal.Details
suite 1090: t.i. (2) offices, (1) conference, (1) break area new paint and finishes throughout. sprinkler and life safety under seperate submittal. | $58,575 |
| Aug 10, 2018 | Completed final sign-off Oct 2018 | 524 Washington St | Paradigm General Contractors | interior improvement: interior walls, doors, finishes, lighting, mechanical, minor plumbing & ceiling. no exterior work. n/a for maher.Details
interior improvement: interior walls, doors, finishes, lighting, mechanical, minor plumbing & ceiling. no exterior work. n/a for maher. | $262,352 |
| Aug 3, 2018 | Completed final sign-off Oct 2018 | 524 Washington St | Paradigm General Contractors | demo of non load bearing walls per-017. tenant improvement. t.i. under seperate permit.Details
demo of non load bearing walls per-017. tenant improvement. t.i. under seperate permit. | $1,000 |
| Jul 10, 2018 | Completed final sign-off Nov 2018 | 430 Bush St | Paradigm General Contractors | g/f -interior t.i. to an extg business lobby including: select demolition and limited construction of interior storefront doors and adjacent ceilings, flooring and finishes, restroom accessibility upgrades, no change in use or occupancy, no change in egress or exit. no change to structuralDetails
g/f -interior t.i. to an extg business lobby including: select demolition and limited construction of interior storefront doors and adjacent ceilings, flooring and finishes, restroom accessibility upgrades, no change in use or occupancy, no change in egress or exit. no change to structural | $100,000 |
| Jun 14, 2018 | Completed final sign-off Feb 2019 | 655 08th St | Paradigm General Contractors | suite a-1 -interior fit out for branch bank approx 2800 sf condisting of teller line banking and offices as approved by planning under formula retail space within a new development at 855 brannanDetails
suite a-1 -interior fit out for branch bank approx 2800 sf condisting of teller line banking and offices as approved by planning under formula retail space within a new development at 855 brannan | $250,000 |
| Apr 23, 2018 | Completed final sign-off Dec 2018 | 560 Mission St | Paradigm General Contractors | revision to 201707182208 to add exit corridor off corridor and pantryDetails
revision to 201707182208 to add exit corridor off corridor and pantry | $5,000 |
| Feb 23, 2018 | Completed final sign-off Apr 2019 | 4648 Mission St | Paradigm General Contractors | non structural interior ti. new finishes, doors, paritions, \\Details
non structural interior ti. new finishes, doors, paritions, \\ | $220,902 |
| Jan 24, 2018 | Completed final sign-off Apr 2018 | 30 Hotaling Pl | Paradigm General Contractors | new internal stair in existing 2 level office space; revision to permit 201712045369Details
new internal stair in existing 2 level office space; revision to permit 201712045369 | $190,000 |
| Dec 28, 2017 | Completed final sign-off Feb 2022 | 388 Market St | Paradigm General Contractors | 8/f: new led lighting, t-24 controls, modify troffer hvac supply to 2x2 duct. ref app#201712227207. n/a for maherDetails
8/f: new led lighting, t-24 controls, modify troffer hvac supply to 2x2 duct. ref app#201712227207. n/a for maher | $30,000 |
| Dec 22, 2017 | Completed final sign-off Jan 2018 | 388 Market St | Paradigm General Contractors | suite 850: demo of non-loadbearing ceiling height wall, modified wall at break room, change hvac distribution from light troffer to grilles. electrical, life safety under sep. permit. maher naDetails
suite 850: demo of non-loadbearing ceiling height wall, modified wall at break room, change hvac distribution from light troffer to grilles. electrical, life safety under sep. permit. maher na | $40,000 |
| Oct 6, 2017 | Completed final sign-off May 2019 | 560 Mission St | Paradigm General Contractors | 5th fl: demo & office/conference rm, improvements of pantry & minor ti, inter. drywall & finishes, new sink & mechanical & electrical. maher naDetails
5th fl: demo & office/conference rm, improvements of pantry & minor ti, inter. drywall & finishes, new sink & mechanical & electrical. maher na | $150,000 |
| Jun 19, 2017 | Completed final sign-off Aug 2017 | 333 Market St | Paradigm General Contractors, Anderson, Rowe & Buckley, Inc. | add new heat pump to save existing idf room, provide 2 new fire smoke dampers. connect to existing condenser waterDetails
add new heat pump to save existing idf room, provide 2 new fire smoke dampers. connect to existing condenser water | $45,000 |
| May 8, 2017 | Completed final sign-off Jul 2017 | 99 Green St | Paradigm General Contractors | title 24 electrical at 1 office and 1 conf room, 2 lights, 2 switches, 2 duplex circuits 201703292737Details
title 24 electrical at 1 office and 1 conf room, 2 lights, 2 switches, 2 duplex circuits 201703292737 | $2,000 |
| Mar 29, 2017 | Completed final sign-off Jul 2017 | 99 Green St | Paradigm General Contractors | 1/f- construction of office and conference room. n/a ordinance #155-13Details
1/f- construction of office and conference room. n/a ordinance #155-13 | $40,000 |
| Feb 10, 2017 | Completed final sign-off Aug 2017 | 388 Market St | Paradigm General Contractors | voluntary addition of automatic door opener at 1 pine st entrance. also add push plates, card reader & intercomDetails
voluntary addition of automatic door opener at 1 pine st entrance. also add push plates, card reader & intercom | $7,500 |
| Jun 8, 2016 | Completed final sign-off Aug 2017 | 333 Market St | Paradigm General Contractors | open collaboration meeting space for existing retail bank. pantry, meeting rooms at gr and existing mezzanine. revise e stair, provide ada upgrades to restrooms and elevatorDetails
open collaboration meeting space for existing retail bank. pantry, meeting rooms at gr and existing mezzanine. revise e stair, provide ada upgrades to restrooms and elevator | $500,000 |
| May 17, 2016 | Never finaled issued May 2016, no final | 555 California St | Paradigm General Contractors | t-24 drawings spec suite electrical. ref app#201509288173 and 201602018461. n/a for maherDetails
t-24 drawings spec suite electrical. ref app#201509288173 and 201602018461. n/a for maher | |
| May 5, 2016 | Completed final sign-off Nov 2016 | 77 Beale St | Paradigm General Contractors | revision to ref pa 2015 0401 3538/the purpose of this submission is to remove scope , to modify the (e) trench drain, from permit 2013 0401 3538. this work is being performed under bld permit 2015 1110 2287. maher naDetails
revision to ref pa 2015 0401 3538/the purpose of this submission is to remove scope , to modify the (e) trench drain, from permit 2013 0401 3538. this work is being performed under bld permit 2015 1110 2287. maher na | |
| Mar 31, 2016 | Never finaled issued Mar 2016, no final | 555 California St | Paradigm General Contractors | t24 calcs mech common corridor ref 201509167084Details
t24 calcs mech common corridor ref 201509167084 | $500 |
| Mar 31, 2016 | Completed final sign-off Jun 2017 | 555 California St | Paradigm General Contractors | t24 mech spec suites ref 201602018461Details
t24 mech spec suites ref 201602018461 | $500 |
| Mar 31, 2016 | Completed final sign-off Jun 2016 | 555 California St | Paradigm General Contractors | t24 calcs electrical, ref 201508315628Details
t24 calcs electrical, ref 201508315628 | $500 |
| Mar 31, 2016 | Completed final sign-off Jun 2016 | 430 Bush St | Paradigm General Contractors | revision to 201507211990 for lever 3 and 5, revision to vestibules, infill perimeter wall opening and remove abandoned electrical panels; n/a maher ord. 155-13Details
revision to 201507211990 for lever 3 and 5, revision to vestibules, infill perimeter wall opening and remove abandoned electrical panels; n/a maher ord. 155-13 | $10,000 |
| Mar 28, 2016 | Completed final sign-off May 2016 | 525 Market St | Paradigm General Contractors | 16/f elevator lobby- revision to pa#201603081441, title 24 & lighting only.Details
16/f elevator lobby- revision to pa#201603081441, title 24 & lighting only. | $4,000 |
| Mar 8, 2016 | Completed final sign-off May 2016 | 525 Market St | Paradigm General Contractors | 16/f elevator lobby- non structural t.i. on 16/f elevator lobby, new floor, wall, lighting & ceiling finishes, existing lobby doors to remain. revision to pa# 201510220531, electrical under seperate permit.Details
16/f elevator lobby- non structural t.i. on 16/f elevator lobby, new floor, wall, lighting & ceiling finishes, existing lobby doors to remain. revision to pa# 201510220531, electrical under seperate permit. | $30,000 |
| Feb 16, 2016 | Completed final sign-off Jun 2016 | 824 Ellis St | Paradigm General Contractors | remodel office area on 2nd floor & ground floor. work is limited to ground floor & 2nd floor. add two break area, add ada ramp at entry. art activityDetails
remodel office area on 2nd floor & ground floor. work is limited to ground floor & 2nd floor. add two break area, add ada ramp at entry. art activity | $85,000 |
| Feb 1, 2016 | Completed final sign-off Jun 2016 | 555 California St | Paradigm General Contractors | 5th fl:selective demo of non-structural partitions,doors,& frames,construction of tenant suites with new non-stuctural partitions. doors/frames ceilings,lighting,millwork & finishes. no change in occupancy use & area.add scope to prior permit. mep & life safety under seperate permit. n/a for mahelDetails
5th fl:selective demo of non-structural partitions,doors,& frames,construction of tenant suites with new non-stuctural partitions. doors/frames ceilings,lighting,millwork & finishes. no change in occupancy use & area.add scope to prior permit. mep & life safety under seperate permit. n/a for mahel | $200,000 |
| Dec 16, 2015 | Never finaled issued Dec 2015, no final | 555 California St | Paradigm General Contractors | change light fixtures in corridor with led, provide controls.maher naDetails
change light fixtures in corridor with led, provide controls.maher na | $5,000 |
| Oct 22, 2015 | Completed final sign-off Apr 2016 | 525 Market St | Paradigm General Contractors | 16th floor - demo, new drywall, ceilings, arch millwork, mechanical & electrical. sprinklers & life safety separate permit.Details
16th floor - demo, new drywall, ceilings, arch millwork, mechanical & electrical. sprinklers & life safety separate permit. | $2,924,400 |
| Sep 28, 2015 | Completed final sign-off Jun 2016 | 555 California St | Paradigm General Contractors | 5th flr: minor demo of non-structural partitions construction of tenant suite with on structural partitions. doors, frames, ceiling, lighting, millwork & finishes. no change in area, occupancy or use. mep/life safety under sep permit. maher naDetails
5th flr: minor demo of non-structural partitions construction of tenant suite with on structural partitions. doors, frames, ceiling, lighting, millwork & finishes. no change in area, occupancy or use. mep/life safety under sep permit. maher na | $400,000 |
| Sep 28, 2015 | Completed final sign-off Jun 2016 | 555 California St | Paradigm General Contractors | 16th flr: barrier removal in restrooms, including removal of urinals. no change in occupancy area or use. mep under sep permit. maher naDetails
16th flr: barrier removal in restrooms, including removal of urinals. no change in occupancy area or use. mep under sep permit. maher na | $35,000 |
| Sep 16, 2015 | Completed final sign-off Jun 2016 | 555 California St | Paradigm General Contractors | 5th flr: no change in occpancy, no change in floor area,demolition of non-structural partitions,doors/frames/millwork,ceiling grid &tile,lighting,power & finishes.construction of new service elevator lobby,corridors &Details
5th flr: no change in occpancy, no change in floor area,demolition of non-structural partitions,doors/frames/millwork,ceiling grid &tile,lighting,power & finishes.construction of new service elevator lobby,corridors & | $246,000 |
| Aug 31, 2015 | Completed final sign-off Jun 2016 | 555 California St | Paradigm General Contractors | 19th floor: demo of toilet partitions, fixtures and accessories. new toilet partitions, fixtures, and acessories for accessiblity. barrierr removal only. n/a for maher.Details
19th floor: demo of toilet partitions, fixtures and accessories. new toilet partitions, fixtures, and acessories for accessiblity. barrierr removal only. n/a for maher. | $150,000 |
| Aug 31, 2015 | Completed final sign-off Jun 2016 | 555 California St | Paradigm General Contractors | 20th floor: demo of partitions, finishes, ceiling and lighting, new partitions, toilet fixtures, and accessories for accessiblity, ceiling and lighting finishes. barreir removal only. n/a for maher.Details
20th floor: demo of partitions, finishes, ceiling and lighting, new partitions, toilet fixtures, and accessories for accessiblity, ceiling and lighting finishes. barreir removal only. n/a for maher. | $600,000 |
| Jul 21, 2015 | Completed final sign-off Jun 2016 | 430 Bush St | Paradigm General Contractors | demo(e)non-load bearing partitions,ceilings,ductwork,elec conduit& plumbing fixtures.install new ceiling,interior partitions,lighting,doors, finishes&plumbing fixtures.alter both mech&elec sys.refinish interior side(e)exterior window frames.n/a maher ord.Details
demo(e)non-load bearing partitions,ceilings,ductwork,elec conduit& plumbing fixtures.install new ceiling,interior partitions,lighting,doors, finishes&plumbing fixtures.alter both mech&elec sys.refinish interior side(e)exterior window frames.n/a maher ord. | $3,500,000 |
| Jun 12, 2015 | Completed final sign-off Jul 2015 | 1167 Mission St | Paradigm General Contractors | 2nd & 3rd flrs: select non structural demolition of non load bearing walls; maher n/aDetails
2nd & 3rd flrs: select non structural demolition of non load bearing walls; maher n/a | $3,000 |
| Apr 10, 2015 | Completed final sign-off Dec 2015 | 215 Market St | Paradigm General Contractors | mep drawings for pa# 201409176520, hvac and electrical work only. n/a ordinance #155-13Details
mep drawings for pa# 201409176520, hvac and electrical work only. n/a ordinance #155-13 | $80,000 |
| Apr 9, 2015 | Completed final sign-off May 2015 | 388 Market St | Paradigm General Contractors | #1420: demo 4 lowheight (4') patitions and 1 (6') center partition. n/a for maher.Details
#1420: demo 4 lowheight (4') patitions and 1 (6') center partition. n/a for maher. | $1,000 |
| Dec 23, 2014 | Expired or cancelled cancelled Aug 2016 | 2180 Harrison St | Paradigm General Contractors | voluntary barrier removal to facilities accessed by general public - accessible parking, curb ramp in private parking lot, reception counter, toilet rooms on floors 1,2 and 3, and signage. maher n/a.Details
voluntary barrier removal to facilities accessed by general public - accessible parking, curb ramp in private parking lot, reception counter, toilet rooms on floors 1,2 and 3, and signage. maher n/a. | $30,000 |
| Nov 17, 2014 | Completed final sign-off Dec 2014 | 550 California St | Paradigm General Contractors | reconfigure womens toilet room due to non-compliant ada stall. remove 1 stall & relocate ada stall, reconfigure standard stalls. remove urinal in mens toilet room. plan revision to permit #20140627969. compliance with maher ordinance no. 155-13 not required.Details
reconfigure womens toilet room due to non-compliant ada stall. remove 1 stall & relocate ada stall, reconfigure standard stalls. remove urinal in mens toilet room. plan revision to permit #20140627969. compliance with maher ordinance no. 155-13 not required. | |
| Sep 17, 2014 | Completed final sign-off Dec 2015 | 215 Market St | Paradigm General Contractors | grnd floor, t.i. demo existing gyp board partitions as shown. construct new gyp bd partitions for new conference rooms, relocate (e) light fixtures, interior work only - mep separate permit. sprinkler and life safety under separate permits; maher n/aDetails
grnd floor, t.i. demo existing gyp board partitions as shown. construct new gyp bd partitions for new conference rooms, relocate (e) light fixtures, interior work only - mep separate permit. sprinkler and life safety under separate permits; maher n/a | $23,000 |
| Jul 2, 2014 | Never finaled issued Apr 2015, no final | 50 Main St | Paradigm General Contractors | remove extenet's existing cell site from penthouse on roof of parking structural. remove antennas and associated equipment for at&t facility. n/a ordinance #155-13.Details
remove extenet's existing cell site from penthouse on roof of parking structural. remove antennas and associated equipment for at&t facility. n/a ordinance #155-13. | $1,200 |
| Jun 27, 2014 | Completed final sign-off Dec 2014 | 550 California St | Paradigm General Contractors | remodel of e office space. new offices, huddle rooms, collaboration of space and copy room. new furniture, finishes, lighting in new offices. mech and elec work, remodel toilet rooms, no addition fixtures added. maher 155-13 not reqDetails
remodel of e office space. new offices, huddle rooms, collaboration of space and copy room. new furniture, finishes, lighting in new offices. mech and elec work, remodel toilet rooms, no addition fixtures added. maher 155-13 not req | $250,000 |
| Jun 17, 2014 | Completed final sign-off Jun 2014 | 77 Beale St | Paradigm General Contractors | revision to 201304184830 for changes to wall layout and framing details. maher 155-13 not requiredDetails
revision to 201304184830 for changes to wall layout and framing details. maher 155-13 not required | |
| Jun 3, 2014 | Expired or cancelled cancelled Jul 2016 | 77 Beale St | Paradigm General Contractors | 3rd phase of ongoing project to replace the four existing main service switchgear. this phase of the project will replace the 1st fl of 4 switchboard section and bus riser feeding floors 15-34Details
3rd phase of ongoing project to replace the four existing main service switchgear. this phase of the project will replace the 1st fl of 4 switchboard section and bus riser feeding floors 15-34 | $300,000 |
| Mar 7, 2014 | Never finaled issued Mar 2014, no final | 77 Beale St | Paradigm General Contractors | to obtain final inspection for work approved under pa 201204107966. all work is completeDetails
to obtain final inspection for work approved under pa 201204107966. all work is complete | |
| Jan 3, 2014 | Completed final sign-off Jan 2014 | 245 Market St | Paradigm General Contractors | revision to 201305308242. revised sheet #a1.1 accessible entry/exit for change to ada push button type change to detail 4 on sheet a1.1Details
revision to 201305308242. revised sheet #a1.1 accessible entry/exit for change to ada push button type change to detail 4 on sheet a1.1 | |
| Dec 12, 2013 | Completed final sign-off May 2016 | 77 Beale St | Paradigm General Contractors, C B 2 Builders Incorporated | tenant improvement of open office with modular furniture, a new break area, a new large conference room and 2 smaller conference rooms.Details
tenant improvement of open office with modular furniture, a new break area, a new large conference room and 2 smaller conference rooms. | $425,000 |
| Oct 30, 2013 | Completed final sign-off Jun 2014 | 77 Beale St | Paradigm General Contractors | plumbing electric scope f/(e) approved architectural, permit arch 201304184830. gr fl cafeDetails
plumbing electric scope f/(e) approved architectural, permit arch 201304184830. gr fl cafe | $40,000 |
| Sep 30, 2013 | Completed final sign-off Dec 2013 | 77 Beale St | Paradigm General Contractors | 16th flr: demolition of one (1) non structural partitionDetails
16th flr: demolition of one (1) non structural partition | $4,000 |