- May 2010 to Jul 2026
197 permits since 2000 (contractor on 197 permits, authorized agent-others on 14 permits, designer on 5 permits): 121 completed, 21 in progress, 44 never finaled, 11 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. Their ranked record as a contractor is on their contractor page. How to read these records
Most recent permits
Showing the 100 most recent of 197.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 27, 2026 | In progress issued Jul 2026 | 1665 Filbert St | Planart Construction Corp | replace wet bar cabinets and sink (additional) revise the scope of work from 4 bathrooms to 2 bathrooms from permit pa#202512151941. the bathrooms on the 3rd floor will not be remodeled. only the ground floor bathrooms are on the new scope of work.Details
replace wet bar cabinets and sink (additional) revise the scope of work from 4 bathrooms to 2 bathrooms from permit pa#202512151941. the bathrooms on the 3rd floor will not be remodeled. only the ground floor bathrooms are on the new scope of work. | |
| Jul 1, 2026 | In progress issued Sep 2026 | 969 Treat Av | Planart Construction Corp | install a retractable shade structure with fire-retardant fabric including all required mounting hardware and attachements in the second level deck.Details
install a retractable shade structure with fire-retardant fabric including all required mounting hardware and attachements in the second level deck. | $20,000 |
| Jun 24, 2026 | In progress issued Jul 2026 | 624 46th Av | Planart Construction Corp | 1st fl - relocate garage door, recycle area, laundry, mechanical room & storage. new bathroom, new multi use room & bedroom; 2nd fl - upgrade stair way, convert (e) dining room into kitchen and kitchen into dining room; roof - add new skylights. (e) curb to remain unchanged.Details
1st fl - relocate garage door, recycle area, laundry, mechanical room & storage. new bathroom, new multi use room & bedroom; 2nd fl - upgrade stair way, convert (e) dining room into kitchen and kitchen into dining room; roof - add new skylights. (e) curb to remain unchanged. | $120,000 |
| Jun 23, 2026 | In progress issued Jun 2026 | 367 Liberty St | Planart Construction Corp | to obtain final inspection for work approved under pa#202410082529, 202406104079 all work is completeDetails
to obtain final inspection for work approved under pa#202410082529, 202406104079 all work is complete | |
| Jun 23, 2026 | Completed final sign-off Sep 2026 | 85 Mirabel Av | Planart Construction Corp | to obtain final inspection for work approved under pa#202407267403 all work is completeDetails
to obtain final inspection for work approved under pa#202407267403 all work is complete | |
| May 21, 2026 | In progress issued May 2026 | 290 Rutledge St | Planart Construction Corp | remodel of sfd, new wood siding in place of (e) , remodel (e) 3rd floor bathroom (in kind replacement of fixtures). replacement 3rd floor window (not street visible), new decking at 3rd floor deck (not street visible)Details
remodel of sfd, new wood siding in place of (e) , remodel (e) 3rd floor bathroom (in kind replacement of fixtures). replacement 3rd floor window (not street visible), new decking at 3rd floor deck (not street visible) | $50,000 |
| May 21, 2026 | In progress issued May 2026 | 1930 12th Av | Planart Construction Corp | recommencement and completion of work approved under pa# 202205053587, 2024062855002, 202408017770.Details
recommencement and completion of work approved under pa# 202205053587, 2024062855002, 202408017770. | $151,000 |
| Feb 27, 2026 | In progress issued Feb 2026 | 624 46th Av | Planart Construction Corp | renovate laundry room in ground floor,in kind, replace garage slab in kind. 4" min., 10 mil vapor barrier, #4 rebar 12" o.c. and repair interior existing stairs in kind, less than 50%. no structural work. install dryer per cmc 504.4 and 502.2.1. all work like-to-like.Details
renovate laundry room in ground floor,in kind, replace garage slab in kind. 4" min., 10 mil vapor barrier, #4 rebar 12" o.c. and repair interior existing stairs in kind, less than 50%. no structural work. install dryer per cmc 504.4 and 502.2.1. all work like-to-like. | $45,000 |
| Feb 13, 2026 | In progress issued Jul 2026 | 1559 Willard St | Planart Construction Corp | replacement of door for wider sliding door & replacement of window and lowering sill. expansion of existing deck to include lower level with a hot tubDetails
replacement of door for wider sliding door & replacement of window and lowering sill. expansion of existing deck to include lower level with a hot tub | $45,000 |
| Jan 30, 2026 | Completed final sign-off May 2026 | 420 Monterey Bl | Planart Construction Corp | siding: replace front side hardie to match (e) due to dry rot. street visible.Details
siding: replace front side hardie to match (e) due to dry rot. street visible. | $25,000 |
| Jan 8, 2026 | In progress issued Jul 2026 | 83 Mirabel Av | Planart Construction Corp | vertical addition. renovation throughout (e) 1st & 2nd floor. horizontal addition @ rear. 3rd story addition includes new kitchen, bath & living space. new rear yard stairs & deck require for fire access & secondary egress. new siding, doors, windows & roof. no work within rear yard setback.Details
vertical addition. renovation throughout (e) 1st & 2nd floor. horizontal addition @ rear. 3rd story addition includes new kitchen, bath & living space. new rear yard stairs & deck require for fire access & secondary egress. new siding, doors, windows & roof. no work within rear yard setback. | $475,000 |
| Dec 16, 2025 | In progress issued Dec 2025 | 1665 Filbert St | Planart Construction Corp | remodel existing ground floor bathrooms in kind (2 bathrooms) and 2 bathrooms on the 3rd floor in kind. maintain the current layout and configurations, no structural modifications. 4 bathrooms total. no change to floor layout. no change to wall layout. no structural work.Details
remodel existing ground floor bathrooms in kind (2 bathrooms) and 2 bathrooms on the 3rd floor in kind. maintain the current layout and configurations, no structural modifications. 4 bathrooms total. no change to floor layout. no change to wall layout. no structural work. | $100,000 |
| Dec 2, 2025 | In progress issued Dec 2025 | 2478 32nd Av | Planart Construction Corp | remodel the (e)bathroom on the ground-floor level inside master suite. replace bathroom window and patio door; like for like. no structural work. window is in back of home.Details
remodel the (e)bathroom on the ground-floor level inside master suite. replace bathroom window and patio door; like for like. no structural work. window is in back of home. | $50,000 |
| Nov 13, 2025 | Completed final sign-off Nov 2025 | 1915 Sacramento St | Planart Construction Corp | to obtain final inspection for work approved under pa# 202202258675 and 202409170917. all work is complete.Details
to obtain final inspection for work approved under pa# 202202258675 and 202409170917. all work is complete. | |
| Oct 27, 2025 | In progress issued Jan 2026 | 348 Cumberland St | Planart Construction Corp | conversion of 356 sf of (e) garage to living area. reconfiguration of (e) interior stair between first and second fls. remodel of (e) 2nd fl kitchen & bath.Details
conversion of 356 sf of (e) garage to living area. reconfiguration of (e) interior stair between first and second fls. remodel of (e) 2nd fl kitchen & bath. | $250,000 |
| Jun 30, 2025 | Completed final sign-off May 2026 | 420 Monterey Bl | Planart Construction Corp | existing front decks to be replaced in original location and size. front windows and doors to be replaced in existing openings. existing wood siding to remain and be painted.Details
existing front decks to be replaced in original location and size. front windows and doors to be replaced in existing openings. existing wood siding to remain and be painted. | $30,000 |
| Apr 15, 2025 | Completed final sign-off Aug 2025 | 531 Kansas St | Planart Construction Corp | replace front facade stucco in kind and replace windows and doors trims in kind. work on all 3 stories.Details
replace front facade stucco in kind and replace windows and doors trims in kind. work on all 3 stories. | $12,000 |
| Apr 10, 2025 | Completed final sign-off Jul 2025 | 845 Oak St | Planart Construction Corp | remodel in kind (1) bathroom - no structural - 45 sq ftDetails
remodel in kind (1) bathroom - no structural - 45 sq ft | $20,000 |
| Apr 10, 2025 | Completed final sign-off Nov 2025 | 877 Alvarado St | Planart Construction Corp | replace (4) windows on back side and repair dry rot around opening. replace exterior siding. repair dry rot in front stairs.Details
replace (4) windows on back side and repair dry rot around opening. replace exterior siding. repair dry rot in front stairs. | $40,000 |
| Feb 21, 2025 | Completed final sign-off Aug 2025 | 531 Kansas St | Planart Construction Corp | replace front deck tile, repair/replace front exterior mouldings, paint front facade. remodel 3rd floor hall bath in kind - no structural work.Details
replace front deck tile, repair/replace front exterior mouldings, paint front facade. remodel 3rd floor hall bath in kind - no structural work. | $40,000 |
| Feb 4, 2025 | Completed final sign-off Aug 2026 | 101 Casitas Av | Planart Construction Corp | comply to nov 202305469. rebuild south wall of 3rd fl. rebuilt roof framing, rebuild half of ceiling framing @ 3rd floor. all due to fallen tree. rebuilt internal main stairs of building due to water damage. framing only. no finishes.Details
comply to nov 202305469. rebuild south wall of 3rd fl. rebuilt roof framing, rebuild half of ceiling framing @ 3rd floor. all due to fallen tree. rebuilt internal main stairs of building due to water damage. framing only. no finishes. | $130,000 |
| Jan 15, 2025 | Completed final sign-off Dec 2025 | 1622 Greenwich St | Planart Construction Corp | paint exterior of building, replace front windows, and repair dry rot.Details
paint exterior of building, replace front windows, and repair dry rot. | $60,000 |
| Jan 14, 2025 | In progress filed Jan 2025, not yet issued | 103 Liberty St | Planart Construction Corp | replace (e) vinyl siding and fire rated windows at property line.Details
replace (e) vinyl siding and fire rated windows at property line. | $50,000 |
| Oct 8, 2024 | In progress issued Oct 2024 | 367 Liberty St | Planart Construction Corp | revision to approved pa#: 202406104079. update (e) roof framing and change hdu11 to 2 hdu5 at 2nd floor framing.Details
revision to approved pa#: 202406104079. update (e) roof framing and change hdu11 to 2 hdu5 at 2nd floor framing. | |
| Sep 4, 2024 | Completed final sign-off Aug 2025 | 684 Precita Av | Planart Construction Corp | replace rear window: replace stairwell skylights: no structural work.Details
replace rear window: replace stairwell skylights: no structural work. | $10,000 |
| Sep 4, 2024 | Completed final sign-off Nov 2024 | 1820 Anza St | Planart Construction Corp | paint outside of building. repair mold and dry rotted window trim and remove and replace stucco as needed at 4 windows. no structural. visible from the street.Details
paint outside of building. repair mold and dry rotted window trim and remove and replace stucco as needed at 4 windows. no structural. visible from the street. | $15,000 |
| Aug 1, 2024 | In progress issued Aug 2024 | 1930 12th Av | Planart Construction Corp | perform sequenced excavation and pouring of new retaining wall in breezeway to allow installation of new lightwells at 1930 12th ave.Details
perform sequenced excavation and pouring of new retaining wall in breezeway to allow installation of new lightwells at 1930 12th ave. | $50,000 |
| Jul 26, 2024 | Completed final sign-off Sep 2026 | 85 Mirabel Av | Planart Construction Corp | revision to bpa# 202303103513: remove the new stair connection north of gird line a from the scope of work. the rest of the project is as proposed per original project.Details
revision to bpa# 202303103513: remove the new stair connection north of gird line a from the scope of work. the rest of the project is as proposed per original project. | |
| Jul 23, 2024 | Completed final sign-off Dec 2024 | 727 11th Av | Planart Construction Corp | lower level bathroom remodel - no structural work. all new plumbing fixtures, new electrical and plumbing including a shower pan.Details
lower level bathroom remodel - no structural work. all new plumbing fixtures, new electrical and plumbing including a shower pan. | $50,000 |
| Jun 28, 2024 | In progress issued Jul 2024 | 1930 12th Av | Planart Construction Corp | rev 202205053587- construction of approximately 10' of (n) foundation due to differing site conditions.Details
rev 202205053587- construction of approximately 10' of (n) foundation due to differing site conditions. | |
| Jun 10, 2024 | In progress issued Jun 2024 | 367 Liberty St | Planart Construction Corp | reduce hfx-24x8 to hfx 18x8, add new beams and post, verify (e) hold downs & shear wallss, & connectors, verify (e) & diaphragm nailingDetails
reduce hfx-24x8 to hfx 18x8, add new beams and post, verify (e) hold downs & shear wallss, & connectors, verify (e) & diaphragm nailing | $10,000 |
| May 22, 2024 | Completed final sign-off Aug 2024 | 341 Cornwall St | Planart Construction Corp | replace 8 front windows. paint front and side of the house. rpair rotten front stairs - less than 50%.Details
replace 8 front windows. paint front and side of the house. rpair rotten front stairs - less than 50%. | $50,000 |
| May 3, 2024 | Expired or cancelled withdrawn Aug 2026 | 969 Treat Av | Planart Construction Corp | installation of retractable pergolas on roof deck play areas for kids to be able to use when too sunny or during rain.Details
installation of retractable pergolas on roof deck play areas for kids to be able to use when too sunny or during rain. | $50,000 |
| Apr 25, 2024 | Completed final sign-off Jul 2024 | 336 Cumberland St | Planart Construction Corp | permit revision to pa#202303203947. remove 18c (pull/torque test) from inspection formDetails
permit revision to pa#202303203947. remove 18c (pull/torque test) from inspection form | |
| Mar 8, 2024 | In progress issued Mar 2024 | 367 Liberty St | Planart Construction Corp | repair all interior rain water damage, new drywall, new flooring, new cabinetry. all plumbing and electrical fixtures will remain in same location. all new tiles. no structural changes. both units no layout changesDetails
repair all interior rain water damage, new drywall, new flooring, new cabinetry. all plumbing and electrical fixtures will remain in same location. all new tiles. no structural changes. both units no layout changes | $200,000 |
| Oct 31, 2023 | In progress issued Nov 2023 | 1116 Balboa St | Planart Construction Corp | rebuilt and repair rear property. laundry structure. related foundation work.Details
rebuilt and repair rear property. laundry structure. related foundation work. | $12,000 |
| Oct 16, 2023 | Completed final sign-off Mar 2024 | 56 Beaver St | Planart Construction Corp | remodel kitchen in kind : coutertop, cabinets, appliances, tiling, sink- no plans, no structural work. no moving wall.Details
remodel kitchen in kind : coutertop, cabinets, appliances, tiling, sink- no plans, no structural work. no moving wall. | $50,000 |
| Oct 6, 2023 | Never finaled issued Oct 2023, no final | 2875 Golden Gate Av | Planart Construction Corp | to obtain final inspection for work approved under pa #201708316591. all work is complete.Details
to obtain final inspection for work approved under pa #201708316591. all work is complete. | |
| Sep 13, 2023 | Completed final sign-off Jan 2024 | 182 Albion St | Planart Construction Corp | remodel of existing bathroom (in kind). no structural work.Details
remodel of existing bathroom (in kind). no structural work. | $21,000 |
| Aug 15, 2023 | Completed final sign-off Jul 2024 | 1116 Balboa St | Planart Construction Corp | remodel (e) 1 kitchen, 1 laundry and 1 powder room in-kind no structural work new appliances, cabinets, electrical and plumbing. no alteration of wall, window, or door.Details
remodel (e) 1 kitchen, 1 laundry and 1 powder room in-kind no structural work new appliances, cabinets, electrical and plumbing. no alteration of wall, window, or door. | $80,000 |
| Aug 15, 2023 | Completed final sign-off May 2024 | 509 Cayuga Av | Planart Construction Corp | lover level remodel: no structural work. convert (e) bathroom into (n) laundry. convert (e) recreational room into (n) butler & pantry, recreational room and bedroom. add (n) bathroom replace windowsDetails
lover level remodel: no structural work. convert (e) bathroom into (n) laundry. convert (e) recreational room into (n) butler & pantry, recreational room and bedroom. add (n) bathroom replace windows | $40,000 |
| Jul 13, 2023 | Completed final sign-off Jan 2024 | 3441 Clay St | Planart Construction Corp | remodel bathroom 3rd level in kind. no structural work. no change walls.Details
remodel bathroom 3rd level in kind. no structural work. no change walls. | $50,000 |
| Jun 21, 2023 | Completed final sign-off Feb 2025 | 3445 Jackson St | Planart Construction Corp | replace (e) windows (2 french doors, 6 windows). replace dryrot. replace siding (rear facade). replacing in-kind wood windows and doors. in kind. u factor max 0.30Details
replace (e) windows (2 french doors, 6 windows). replace dryrot. replace siding (rear facade). replacing in-kind wood windows and doors. in kind. u factor max 0.30 | $30,000 |
| May 17, 2023 | Completed final sign-off Aug 2025 | 531 Kansas St | Planart Construction Corp | remodel of existing master bathroom in kind-3rd floor. no plans/ no structural work.Details
remodel of existing master bathroom in kind-3rd floor. no plans/ no structural work. | $25,000 |
| Mar 20, 2023 | Completed final sign-off Jul 2024 | 336 Cumberland St | Planart Construction Corp | 1/f: interior remodel. primary bedroom, primary bath, primary wic , desk area. 2/f: interior remodel. bath, sheetrock repair and paint.Details
1/f: interior remodel. primary bedroom, primary bath, primary wic , desk area. 2/f: interior remodel. bath, sheetrock repair and paint. | $200,000 |
| Mar 10, 2023 | Completed final sign-off Sep 2026 | 85 Mirabel Av | Planart Construction Corp | addition consists of bay windows over sidewalk. widened garage door, new entry, roof deck on 3rd flr facing rear yard. new firewall @ new stair & deck. new hardscape deck @ rear. new stair connection to rear yard terraces & stairs.Details
addition consists of bay windows over sidewalk. widened garage door, new entry, roof deck on 3rd flr facing rear yard. new firewall @ new stair & deck. new hardscape deck @ rear. new stair connection to rear yard terraces & stairs. | $600,000 |
| Sep 15, 2022 | Expired or cancelled withdrawn Jun 2024 | 624 46th Av | Planart Construction Corp | 1/f:laundry mech room,storage,(n) bath,relocate stairs; 2/f:relocate stair to 1/f,(n) stiar to3/f.convert livingroom into fam room,convert (e) kitchen in master bath,w.i. closet.3/f:(n)floor vertical expansion,relocate kitchen,dining living,new powder room,(n) rear and front deck,(n) spiral stairs.Details
1/f:laundry mech room,storage,(n) bath,relocate stairs; 2/f:relocate stair to 1/f,(n) stiar to3/f.convert livingroom into fam room,convert (e) kitchen in master bath,w.i. closet.3/f:(n)floor vertical expansion,relocate kitchen,dining living,new powder room,(n) rear and front deck,(n) spiral stairs. | $200,000 |
| Sep 14, 2022 | In progress issued Sep 2026 | 839 Edinburgh St | Planart Construction Corp | to comply with nov202294070/202292967: 1/f-remove (e) wall,family/game room,relocate bathroom, add (n) storage areas, rear horizontal addition for office & guest bedroom, new sunken patio. 2/f:interior remodel,(n) skylights,upgrade electrical system,rear horizontal addition for (n) master bedroom.Details
to comply with nov202294070/202292967: 1/f-remove (e) wall,family/game room,relocate bathroom, add (n) storage areas, rear horizontal addition for office & guest bedroom, new sunken patio. 2/f:interior remodel,(n) skylights,upgrade electrical system,rear horizontal addition for (n) master bedroom. | $100,000 |
| Sep 14, 2022 | Never finaled issued May 2023, no final | 53 Martha Av | Planart Construction Corp | excavation to retaining wall to generate workshop rm. (n) bathrm, remodel stairs to access (n) mezzanine. create (n) mezzanine behind garage to a gym, bathrm & storage. 2nd fl:convert kitchen,dining & living to (n) bedrms & bathrm. 3rd fl:convert bedrm 1, master bedrm & closet to kitchen,dining &Details
excavation to retaining wall to generate workshop rm. (n) bathrm, remodel stairs to access (n) mezzanine. create (n) mezzanine behind garage to a gym, bathrm & storage. 2nd fl:convert kitchen,dining & living to (n) bedrms & bathrm. 3rd fl:convert bedrm 1, master bedrm & closet to kitchen,dining & | $100,000 |
| Aug 5, 2022 | Completed final sign-off Aug 2025 | 531 Kansas St | Planart Construction Corp | 1/f: remodel (e) bathroom, new office. 2/f: remodel (e) dining room and kitchen, rear wall and windows, door removal and add new double sliding door.Details
1/f: remodel (e) bathroom, new office. 2/f: remodel (e) dining room and kitchen, rear wall and windows, door removal and add new double sliding door. | $35,000 |
| Aug 4, 2022 | Completed final sign-off Feb 2025 | 839 Edinburgh St | Planart Construction Corp | to comply with nov202292967: front entry stair way rebuild in-kind.use the existing terrazo steps.Details
to comply with nov202292967: front entry stair way rebuild in-kind.use the existing terrazo steps. | $8,000 |
| Jun 7, 2022 | Never finaled issued Mar 2023, no final | 3014 Sacramento St | Planart Construction Corp | rev to pa201912311052:(e) front/rear stairs to remain,no (n) entry doory & stairs to upper unit.int remodel:(n) kitchenette & access to storage in lower unit.relocate kitchen in upper unit.no new finished attic. new skylights in upper unit.no new entry door&stairs to upper unit,(e) stair to remain.Details
rev to pa201912311052:(e) front/rear stairs to remain,no (n) entry doory & stairs to upper unit.int remodel:(n) kitchenette & access to storage in lower unit.relocate kitchen in upper unit.no new finished attic. new skylights in upper unit.no new entry door&stairs to upper unit,(e) stair to remain. | |
| May 23, 2022 | Never finaled filed May 2022, never issued | 411 Edna St | Planart Construction Corp | remodel existing sfd to include:new low-sloped nroof at (e)bedroom,new front dormer expansion,new interior stair well to 3rd fl,new infill @ corner of 2nd fl,new interior layout,plumbing & electrical work via separate permit. revision to bpa #2017/07141958.planning prj#2021-008884.Details
remodel existing sfd to include:new low-sloped nroof at (e)bedroom,new front dormer expansion,new interior stair well to 3rd fl,new infill @ corner of 2nd fl,new interior layout,plumbing & electrical work via separate permit. revision to bpa #2017/07141958.planning prj#2021-008884. | $15,000 |
| May 19, 2022 | Completed final sign-off Oct 2022 | 174 Taraval St | Planart Construction Corp | bathroom remodeling in kind non structuralDetails
bathroom remodeling in kind non structural | $10,000 |
| May 16, 2022 | Never finaled issued May 2022, no final | 53 Martha Av | Planart Construction Corp | 1/f: revision to no-plan permit 202203089505 (non structural work). remove (e) fireplace and convert into new laundry area. 2/f: non-structural work. remodel (e) master bathroom and bathroom #1.Details
1/f: revision to no-plan permit 202203089505 (non structural work). remove (e) fireplace and convert into new laundry area. 2/f: non-structural work. remodel (e) master bathroom and bathroom #1. | |
| May 5, 2022 | Never finaled issued May 2022, no final | 1930 12th Av | Planart Construction Corp | new laundry, mud room, bathroom, bedrooms, office, webbar on ground floor only. relocate the staircase and maintain spatial connection between the 1st and 2nd fl. no stove on the ground floor.Details
new laundry, mud room, bathroom, bedrooms, office, webbar on ground floor only. relocate the staircase and maintain spatial connection between the 1st and 2nd fl. no stove on the ground floor. | $250,000 |
| Apr 29, 2022 | Completed final sign-off Aug 2024 | 2864 Jackson St | Planart Construction Corp | revision to pa# 202103176770 per field inspector comments to revise roof framing, add 1-hr rated wall at (e) 4th fl deck & revised 4th fl framing.Details
revision to pa# 202103176770 per field inspector comments to revise roof framing, add 1-hr rated wall at (e) 4th fl deck & revised 4th fl framing. | |
| Mar 8, 2022 | Never finaled issued Apr 2022, no final | 53 Martha Av | Planart Construction Corp | one master bathroom remodeling in kind at 2nd fl. non structuralDetails
one master bathroom remodeling in kind at 2nd fl. non structural | $8,000 |
| Mar 8, 2022 | Completed final sign-off Apr 2022 | 3015 Franklin St | Planart Construction Corp | revision to 201906274612. change of specifications of guardrails from cable rail to glassDetails
revision to 201906274612. change of specifications of guardrails from cable rail to glass | $100 |
| Mar 8, 2022 | Never finaled issued Mar 2022, no final | 695 Rhode Island St | Planart Construction Corp | interior demo non structural in preparation for full remodel (ref 201912200232)Details
interior demo non structural in preparation for full remodel (ref 201912200232) | $5,000 |
| Feb 25, 2022 | Expired or cancelled expired Nov 2025 | 1915 Sacramento St | Planart Construction Corp | excavate (e) crawlspace to replace (e) damaged foundations. add new staircase & elevator access from garage to main house. infill (e) lightwell. replace 1st fl rear bay wall. change interior layout. replace (e) windows w/ fullwood. add insulation at walls. re-frame damaged garage roof.Details
excavate (e) crawlspace to replace (e) damaged foundations. add new staircase & elevator access from garage to main house. infill (e) lightwell. replace 1st fl rear bay wall. change interior layout. replace (e) windows w/ fullwood. add insulation at walls. re-frame damaged garage roof. | $700,000 |
| Feb 9, 2022 | Never finaled issued Feb 2022, no final | 411 Edna St | Planart Construction Corp | replace/repair existing siding in-kind, both sides and rear. approx 2,000 sq. ft., not visible from streetDetails
replace/repair existing siding in-kind, both sides and rear. approx 2,000 sq. ft., not visible from street | $12,000 |
| Jan 10, 2022 | Completed final sign-off Jan 2023 | 500 02nd Av | Planart Construction Corp | grout cement injection at east side of the property due to next door foundation work at 504 02nd av ref pa 202104088202.Details
grout cement injection at east side of the property due to next door foundation work at 504 02nd av ref pa 202104088202. | $2,000 |
| Jan 10, 2022 | Completed final sign-off Jan 2023 | 508 02nd Av | Planart Construction Corp | grout cement injectionat west side of the property due to next door foundation work at 504 02nd av. ref pa 202104088202Details
grout cement injectionat west side of the property due to next door foundation work at 504 02nd av. ref pa 202104088202 | $2,000 |
| Aug 30, 2021 | Completed final sign-off Jan 2023 | 57 Bessie St | Planart Construction Corp | revision to 202011189207 reduce excavation to 10 ft ceiling in media room, replace flat roof at rear due to dryrot and 3 stage shoring of neighboring foundations on both sidesDetails
revision to 202011189207 reduce excavation to 10 ft ceiling in media room, replace flat roof at rear due to dryrot and 3 stage shoring of neighboring foundations on both sides | |
| Aug 13, 2021 | Never finaled issued Aug 2021, no final | 411 Edna St | Planart Construction Corp | remove and replace facade stucco. in kind. repair non structural water damageDetails
remove and replace facade stucco. in kind. repair non structural water damage | $30,000 |
| Aug 5, 2021 | Never finaled issued Mar 2022, no final | 411 Edna St | Planart Construction Corp | replace roof in kind, dryrot repair, and new framing.Details
replace roof in kind, dryrot repair, and new framing. | $25,000 |
| Aug 3, 2021 | Completed final sign-off Nov 2023 | 715 Cole St | North Bay Construction, Planart Construction Corp | 1/f: add guest bedrm, bathrm, closet. extend (e) mechanical room. 2/f: expand kitchen, relocate dining room, convert bath into powder rm and closet. 3/f: remodel master bedrm, bathrm, remove chimney. roof replacementDetails
1/f: add guest bedrm, bathrm, closet. extend (e) mechanical room. 2/f: expand kitchen, relocate dining room, convert bath into powder rm and closet. 3/f: remodel master bedrm, bathrm, remove chimney. roof replacement | $150,000 |
| Jul 29, 2021 | Completed final sign-off Nov 2023 | 442 Collingwood St | Velero Inc, Planart Construction Corp | enlare (e) living room using (e) foyer and closet, conver (e) bedroom, clset & parlor into a new master bedoom and bedroom #2, relocate furnace and water heaterDetails
enlare (e) living room using (e) foyer and closet, conver (e) bedroom, clset & parlor into a new master bedoom and bedroom #2, relocate furnace and water heater | $40,000 |
| Jul 14, 2021 | Completed final sign-off Aug 2024 | 2864 Jackson St | Planart Construction Corp | nonstructural remodel (2) bathrooms & (1) kitchen, replacing in-kindDetails
nonstructural remodel (2) bathrooms & (1) kitchen, replacing in-kind | $50,000 |
| Apr 8, 2021 | Completed final sign-off Jan 2023 | 504 02nd Av | Planart Construction Corp | 1/f: new gym, bathroom, storage area, laundry, new rear patio by grade; 2/f: open stairway access to connect w/1/f; 3/f: no work in this areaDetails
1/f: new gym, bathroom, storage area, laundry, new rear patio by grade; 2/f: open stairway access to connect w/1/f; 3/f: no work in this area | $100,000 |
| Feb 18, 2021 | Never finaled issued Jun 2021, no final | 1830 09th Av | Planart Construction Corp | 1st fl: add new bathroom under extg deck at rear area, expand construction area below the extg area at southwest side and convert into new family room. add nw laundry, rebuild extg stairway in accomodance to code. 2nd fl: remodel extg kitchen, relocate extg powder room. 3rd fl: no work in this areaDetails
1st fl: add new bathroom under extg deck at rear area, expand construction area below the extg area at southwest side and convert into new family room. add nw laundry, rebuild extg stairway in accomodance to code. 2nd fl: remodel extg kitchen, relocate extg powder room. 3rd fl: no work in this area | $120,000 |
| Jan 12, 2021 | Completed final sign-off Oct 2021 | 208 Joost Av | Planart Construction Corp | remodel kitchen an bathroom in kind, all new cabinets and appliances, upgrade kitchen electrical, all walls reain in placeDetails
remodel kitchen an bathroom in kind, all new cabinets and appliances, upgrade kitchen electrical, all walls reain in place | $25,000 |
| Dec 14, 2020 | Expired or cancelled cancelled Jan 2026 | 88 Manchester St | Planart Construction Corp | remodel garage, add actificty room & bathroom, relocate w/d enclose area. relocate (e) deck for office, remodel ktichen & living room, bedrooms, remove (e) skylights & add new. add powder room.Details
remodel garage, add actificty room & bathroom, relocate w/d enclose area. relocate (e) deck for office, remodel ktichen & living room, bedrooms, remove (e) skylights & add new. add powder room. | $140,000 |
| Nov 25, 2020 | Completed final sign-off Mar 2022 | 2318 09th Av | Planart Construction Corp, Reliable Construction Inc | 1/f: add new bathroom, laundry and activity room. 2/f: remodel (e) kitchen, living room & bathroom. 3/f: remodel (e) bedrooms and bathrooms.Details
1/f: add new bathroom, laundry and activity room. 2/f: remodel (e) kitchen, living room & bathroom. 3/f: remodel (e) bedrooms and bathrooms. | $90,000 |
| Nov 18, 2020 | Completed final sign-off Apr 2023 | 57 Bessie St | Merlyn Construction, Planart Construction Corp | new 12" mat slab foundation w/ crawl space, media room deepened 2' 6" below street level & relocating internal stair opening from ground floor. interior work only. no changes to exterior.Details
new 12" mat slab foundation w/ crawl space, media room deepened 2' 6" below street level & relocating internal stair opening from ground floor. interior work only. no changes to exterior. | $230,000 |
| Oct 24, 2020 | Completed final sign-off Mar 2024 | 25 Conrad St | Planart Construction Corp | interior remodel of kitchen & bathrooms, new skylights on roof not visit from street. all new exterior fenestrations. new stairs to basement.Details
interior remodel of kitchen & bathrooms, new skylights on roof not visit from street. all new exterior fenestrations. new stairs to basement. | $225,000 |
| Sep 24, 2020 | Completed final sign-off Nov 2022 | 363 Polaris Wy | Planart Construction Corp | 1/f: add living room, bathroom & kitchen. remodel (e) stairs. 2/f: remodel bedrooms, relocate bathrooms, relocate washer/dryer. remodel stairs. no change of use. single family only. no kitchen at second level (wet bar only).Details
1/f: add living room, bathroom & kitchen. remodel (e) stairs. 2/f: remodel bedrooms, relocate bathrooms, relocate washer/dryer. remodel stairs. no change of use. single family only. no kitchen at second level (wet bar only). | $100,000 |
| Sep 23, 2020 | Completed final sign-off Aug 2021 | 2151 Sacramento St | Planart Construction Corp | n nunit 2. 1st flr. remodel kitchen and bathroom, laundry, remodel bedroom for window access.Details
n nunit 2. 1st flr. remodel kitchen and bathroom, laundry, remodel bedroom for window access. | $40,000 |
| Sep 15, 2020 | Expired or cancelled cancelled Jan 2026 | 1310 Sanchez St | Planart Construction Corp | renovation to garage to include leveling floor throughout, addition of bath & laundry, added work space, renovated backyard access & addition of stairway from garage to floor through existing lightwell.Details
renovation to garage to include leveling floor throughout, addition of bath & laundry, added work space, renovated backyard access & addition of stairway from garage to floor through existing lightwell. | $100,000 |
| Aug 27, 2020 | Never finaled filed Aug 2020, never issued | 254 12th Av | Planart Construction Corp | 1st fl: remodel kitchen, add bedroom, great room & patio. 2nd fl: remodel kitchen, dining room, and deck. 3rd fl: add master bedroom, master bath, balcony, & skylights. all of which results to a rear addition.Details
1st fl: remodel kitchen, add bedroom, great room & patio. 2nd fl: remodel kitchen, dining room, and deck. 3rd fl: add master bedroom, master bath, balcony, & skylights. all of which results to a rear addition. | $200,000 |
| Jul 10, 2020 | Completed final sign-off Aug 2021 | 2151 Sacramento St | Planart Construction Corp | #2: demo cabinet and remove wall covering.Details
#2: demo cabinet and remove wall covering. | $5,000 |
| Jul 1, 2020 | Never finaled issued Jul 2020, no final | 922 Minnesota St | Planart Construction Corp | repair extg foundation at front area(garage entry)Details
repair extg foundation at front area(garage entry) | $10,000 |
| Mar 11, 2020 | Completed final sign-off Aug 2024 | 201 Middle Point Rd | Planart Construction Corp | revision to permit application #201708013571s. reducing bldg envelope, update rear facade, change to flat roofDetails
revision to permit application #201708013571s. reducing bldg envelope, update rear facade, change to flat roof | |
| Feb 19, 2020 | Completed final sign-off Mar 2021 | 763 Andover St | Planart Construction Corp | 1st fl - remodel (e) bedroom, add new bathroom, family room & laundry; 2nd fl - remodel closets in (e) bedroomsDetails
1st fl - remodel (e) bedroom, add new bathroom, family room & laundry; 2nd fl - remodel closets in (e) bedrooms | $40,000 |
| Jan 22, 2020 | Completed final sign-off Oct 2021 | 3500 22nd St | Planart Construction Corp | voluntary seismic stregnthening at store frontDetails
voluntary seismic stregnthening at store front | $25,000 |
| Dec 31, 2019 | Never finaled issued Jun 2022, no final | 3014 Sacramento St | Planart Construction Corp | rear building: demo existing stairs in front & back of upper unit. new door & stairs to upper unit. interior remodel of both units, finish attic, new skylights for upper unit. voluntary strengthening.Details
rear building: demo existing stairs in front & back of upper unit. new door & stairs to upper unit. interior remodel of both units, finish attic, new skylights for upper unit. voluntary strengthening. | $75,000 |
| Dec 20, 2019 | In progress issued Dec 2024 | 695 Rhode Island St | Planart Construction Corp | remodel of(e)2 story,(2) unit residence,scope of work to include (n) rear horizontal extension @(e) lower level, first and second floor, and (n) vertical addition of third floor.minor alteration to (e) rhode island (street facing90 exterior elevation to include (n)garage door,(n)driveway(n) c.c.Details
remodel of(e)2 story,(2) unit residence,scope of work to include (n) rear horizontal extension @(e) lower level, first and second floor, and (n) vertical addition of third floor.minor alteration to (e) rhode island (street facing90 exterior elevation to include (n)garage door,(n)driveway(n) c.c. | $80,000 |
| Dec 18, 2019 | Completed final sign-off May 2021 | 4 Cortes Av | Planart Construction Corp | remodel to existing kitchen & breakfast room. replace (e) window in kind.Details
remodel to existing kitchen & breakfast room. replace (e) window in kind. | $50,000 |
| Nov 26, 2019 | Never finaled issued Jun 2021, no final | 547 09th Av | Planart Construction Corp | 1st fl: structural work to support changes at 2nd fl. 2nd fl. remodel kitchen dinning room, relocate powder room, remove (e) wall to open kitchen area, 3rd fl. remove chiminey and cover into (n) closet areaDetails
1st fl: structural work to support changes at 2nd fl. 2nd fl. remodel kitchen dinning room, relocate powder room, remove (e) wall to open kitchen area, 3rd fl. remove chiminey and cover into (n) closet area | $60,000 |
| Oct 25, 2019 | Completed final sign-off Jul 2022 | 3524 Fulton St | Blair Burke General Contractors Inc, Planart Construction Corp | seismic upgrade @ basement. basement addition to extent deck, includes bed, multipurpose and new bath. add new internal stair to basement. kitchen remodel & new windows. deck & exterior stairs within existing footprint.Details
seismic upgrade @ basement. basement addition to extent deck, includes bed, multipurpose and new bath. add new internal stair to basement. kitchen remodel & new windows. deck & exterior stairs within existing footprint. | $340,000 |
| Aug 5, 2019 | Never finaled issued Aug 2019, no final | 1358 21st Av | Planart Construction Corp | grout cement injection @ north side of the property due to next door construction @ 1354 21st ave ref pa 2019-0607-2861Details
grout cement injection @ north side of the property due to next door construction @ 1354 21st ave ref pa 2019-0607-2861 | $4,000 |
| Aug 2, 2019 | Expired or cancelled cancelled Jan 2021 | 763 Andover St | G B U Construction Development, Planart Construction Corp | replace wood retainin wall with concrete retaining wall at front yard.Details
replace wood retainin wall with concrete retaining wall at front yard. | $10,000 |
| Jul 22, 2019 | Completed final sign-off Feb 2021 | 763 Andover St | G B U Construction Development, Planart Construction Corp | apply acrylic coat to exterior front stuco to smooth the walls. install siding on front. replace 2 front windows in (e) opening, size and location remain unchanged. max u-factor 0.32. isntall new garage door.Details
apply acrylic coat to exterior front stuco to smooth the walls. install siding on front. replace 2 front windows in (e) opening, size and location remain unchanged. max u-factor 0.32. isntall new garage door. | $20,000 |
| Jul 3, 2019 | Never finaled issued Jul 2019, no final | 1354 21st Av | Planart Construction Corp | street spaceDetails
street space | |
| Jun 27, 2019 | Completed final sign-off Apr 2022 | 3015 Franklin St | Planart Construction Corp | add new roof deck at existing roofDetails
add new roof deck at existing roof | $30,000 |
| Jun 21, 2019 | Completed final sign-off Apr 2020 | 247 Liberty St | Planart Construction Corp | kitchen and bath remodel, in-kind, like for likeDetails
kitchen and bath remodel, in-kind, like for like | $80,000 |
| Jun 7, 2019 | Completed final sign-off Oct 2020 | 1354 21st Av | Planart Construction Corp | 1st fl.- add (n) family room into (e) laundry area, relocate laundry room, update (e) bathroom, update (e) bedroom, 2nd fl.- udate (e) kitchenDetails
1st fl.- add (n) family room into (e) laundry area, relocate laundry room, update (e) bathroom, update (e) bedroom, 2nd fl.- udate (e) kitchen | $100,000 |
| Jun 7, 2019 | Completed final sign-off Apr 2022 | 3015 Franklin St | Planart Construction Corp | rev to pa# 201905231584; 1st fl. add (n) office in garage area, relocate (e) bathroom, relocate (e) laundry, repair (e) exterior stairway (3 levels) - 2nd fl. remodel (e) kitchen, remodel (e) bedrooms area, add (n) master bath into (e) sun room, remodel (e) bathroom, 3rd fl: remodel (e) kitchen,Details
rev to pa# 201905231584; 1st fl. add (n) office in garage area, relocate (e) bathroom, relocate (e) laundry, repair (e) exterior stairway (3 levels) - 2nd fl. remodel (e) kitchen, remodel (e) bedrooms area, add (n) master bath into (e) sun room, remodel (e) bathroom, 3rd fl: remodel (e) kitchen, | $140,000 |
| May 23, 2019 | Completed final sign-off Apr 2022 | 3017 Franklin St | Planart Construction Corp | kitchen remodeling, in-kind.Details
kitchen remodeling, in-kind. | $25,000 |