Joshua I Rubero
- Listed as
- engineer
- Firm
- D. H. Charles Engineering Inc
- On San Francisco permits
- Oct 2013 to Dec 2015
5 permits since 2000 (engineer on 5 permits): 2 completed, 3 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 11, 2015 | Completed final sign-off Aug 2017 | 477 Ofarrell St | install new window washing equipment to existing building.Details
install new window washing equipment to existing building. | $73,200 | |
| Jul 24, 2014 | Never finaled issued Jul 2014, no final | 150 Lombard St | Access Systems & Solutions Inc | building 1 - install rooftop equipment for window washing, equipment not visible from street when not in use. reference pa #2014.0325.1642. n/a maher ordinanceDetails
building 1 - install rooftop equipment for window washing, equipment not visible from street when not in use. reference pa #2014.0325.1642. n/a maher ordinance | |
| Mar 25, 2014 | Completed final sign-off Jun 2014 | 150 Lombard St | Access Systems & Solutions Inc | install (davit bases) at rooftop equipment for window washing, not visible form street. compliance with ordinance #155-13 not requiredDetails
install (davit bases) at rooftop equipment for window washing, not visible form street. compliance with ordinance #155-13 not required | $220,000 |
| Mar 25, 2014 | Never finaled issued Jun 2014, no final | 101 Lombard St | Access Systems & Solutions Inc | install davit bases at roof level for window washing, not visible form street.Details
install davit bases at roof level for window washing, not visible form street. | $100,000 |
| Oct 9, 2013 | Never finaled issued Dec 2013, no final | 50 Lansing St | Cannon Constructors North Inc | to construct a system for safety washing windows - exterior building maintenance system. equipment will fold away when not in used.Details
to construct a system for safety washing windows - exterior building maintenance system. equipment will fold away when not in used. | $20,000 |