Joseph Collins
- Listed as
- engineer
- On San Francisco permits
- Sep 2020 to Jul 2026
6 permits since 2000 (engineer on 6 permits): 2 completed, 2 in progress, 1 never finaled, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 1, 2026 | In progress issued Jul 2026 | 181 Fremont St | Sc Builders, Inc | ref pa# 202604018674 (10th fl) & pa# 202604159456 (11th fl.): deffered submitals: phone booths anchorage and fan powered box seismic anchorage structural details on l10 & 11Details
ref pa# 202604018674 (10th fl) & pa# 202604159456 (11th fl.): deffered submitals: phone booths anchorage and fan powered box seismic anchorage structural details on l10 & 11 | $10,000 |
| May 22, 2026 | In progress issued Sep 2026 | 181 Fremont St | Sc Builders, Inc | demolition of portion of level 29 slab and portion of gaurdrail, demo of existing smoke curtain on level 30. installation of new stair, handrail and guardrail from level 28 to 29 and new rated enclosures on level 30 and 31Details
demolition of portion of level 29 slab and portion of gaurdrail, demo of existing smoke curtain on level 30. installation of new stair, handrail and guardrail from level 28 to 29 and new rated enclosures on level 30 and 31 | $1,300,000 |
| May 2, 2025 | Completed final sign-off Oct 2025 | 415 Mission St | Hathaway Dinwiddie Co. | 11/f: ref 202504174648: structure - new elevated concrete slab.Details
11/f: ref 202504174648: structure - new elevated concrete slab. | $20,000 |
| Feb 21, 2024 | Completed final sign-off Sep 2024 | 415 Mission St | Hathaway Dinwiddie Co. | 16/f: conversion of an (e) game room into a secure area including an entry, work room, and safe/storage room. demolition of interior partitions, ceiling, and lighting. new construction of interior non-bearing partitions, ceilings and finishes. no change of use or occupancy.Details
16/f: conversion of an (e) game room into a secure area including an entry, work room, and safe/storage room. demolition of interior partitions, ceiling, and lighting. new construction of interior non-bearing partitions, ceilings and finishes. no change of use or occupancy. | $425,434 |
| Oct 11, 2023 | Expired or cancelled withdrawn Feb 2024 | 415 Mission St | Gci, Inc | 16th floor: partial floor commercial office tenant improvement on floor 16. conversion of an (e) game room to a secure area including an entry, work room and to safe/secture room. selective demo, new construction of partitions, ceiling finishes. minor structural for requipment bracing.Details
16th floor: partial floor commercial office tenant improvement on floor 16. conversion of an (e) game room to a secure area including an entry, work room and to safe/secture room. selective demo, new construction of partitions, ceiling finishes. minor structural for requipment bracing. | $350,000 |
| Sep 26, 2020 | Never finaled issued Dec 2020, no final | 1 Post St | Emcor Services/Mesa Energy Systems Inc | replace (1) 523-ton water cooled centrifugal chiller & 2 160-ton reciprocating chillers w/ 12 (n) 76.6 ton modular chillers. replace 2 (e) single speed chilled water pumps w/ new. replace 2 (e) condenser water pumps w/ new. demo existing refirdgerator leak ventilation exhaust fan.Details
replace (1) 523-ton water cooled centrifugal chiller & 2 160-ton reciprocating chillers w/ 12 (n) 76.6 ton modular chillers. replace 2 (e) single speed chilled water pumps w/ new. replace 2 (e) condenser water pumps w/ new. demo existing refirdgerator leak ventilation exhaust fan. | $1,400,000 |