Jose Torres
- Listed as
- contractor, designer
- Firm
- Pacific Construction Company Inc
- Based in
- Millbrae
- On San Francisco permits
- Jul 2012 to May 2026
18 permits since 2000 (contractor on 18 permits, designer on 2 permits): 15 completed, 1 in progress, 2 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. Their ranked record as a contractor is on their contractor page. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 11, 2026 | Completed final sign-off Jul 2026 | 1454 Waller St | Pacific Construction Company Inc | replace 2 toilets in bathrooms like for like. add new independent circuits to subpanel, 5 independent circuits, sealing of (2) windows from water intrusion, re seal window. street facing window.Details
replace 2 toilets in bathrooms like for like. add new independent circuits to subpanel, 5 independent circuits, sealing of (2) windows from water intrusion, re seal window. street facing window. | $14,000 |
| Jul 10, 2025 | Completed final sign-off Mar 2026 | 16 Joy St | Pacific Construction Company Inc | install reinforced concrete "sister" wall, drainage and water proofing inboard of existing wall. replace catch basinDetails
install reinforced concrete "sister" wall, drainage and water proofing inboard of existing wall. replace catch basin | $130,000 |
| Nov 6, 2024 | Completed final sign-off Jan 2025 | 175 Flood Av | Pacific Construction Company Inc | proposal to reinforce existing front stairs with (4) cast-in-place, r/f underpinning pads, 2'3"x2'3"x18".Details
proposal to reinforce existing front stairs with (4) cast-in-place, r/f underpinning pads, 2'3"x2'3"x18". | $6,000 |
| Aug 14, 2024 | In progress filed Aug 2024, not yet issued | 35 Margaret Av | Pacific Construction Company Inc | to remodel (e) bath at ground level and to be legalized.Details
to remodel (e) bath at ground level and to be legalized. | $25,000 |
| Apr 23, 2024 | Completed final sign-off Jul 2024 | 478 36th Av | Pacific Construction Company Inc | remove and replace (e) 4.6 ft retaining wall at the back right side of property and add a (n) 6 ft wood fence on top of the (n) retaining wall. the length of the fence and wall will be 22 linear feet. total height of wall and fence will be 10.6ftDetails
remove and replace (e) 4.6 ft retaining wall at the back right side of property and add a (n) 6 ft wood fence on top of the (n) retaining wall. the length of the fence and wall will be 22 linear feet. total height of wall and fence will be 10.6ft | $30,000 |
| Feb 16, 2024 | Completed final sign-off Apr 2024 | 175 Flood Av | Pacific Construction Company Inc | front footing remove and replacement plus two existing post supports as well.Details
front footing remove and replacement plus two existing post supports as well. | $23,000 |
| Mar 14, 2023 | Completed final sign-off Mar 2023 | 538 21st Av | Pacific Construction Company Inc | add 8"-10" thick stem wall concrete to e footing (17 lf),install new 5/8 " bolts (6 pc approx) 2 holdowns to e footings. 1/2 cdx plywood shear wall 17 lf. new medseal 3x6 pt board. existing is dry rotted. waterproof e footing 17 lf x 2 ft deepDetails
add 8"-10" thick stem wall concrete to e footing (17 lf),install new 5/8 " bolts (6 pc approx) 2 holdowns to e footings. 1/2 cdx plywood shear wall 17 lf. new medseal 3x6 pt board. existing is dry rotted. waterproof e footing 17 lf x 2 ft deep | $8,000 |
| Feb 6, 2023 | Completed final sign-off Jun 2023 | 65 Greenwood Av | Pacific Construction Company Inc | revision to pa 2022-0106-5456; add (n) footing & slab under entry stairs to support entry porch only; remove work in attic. no changes in ceiling in area of work.Details
revision to pa 2022-0106-5456; add (n) footing & slab under entry stairs to support entry porch only; remove work in attic. no changes in ceiling in area of work. | |
| Dec 8, 2022 | Completed final sign-off Dec 2022 | 1926 44th Av | Pacific Construction Company Inc | proposal repair dry rot like to like at 1st floor/ground floor and main/2nd floor of extg addition. no changes to footprint.Details
proposal repair dry rot like to like at 1st floor/ground floor and main/2nd floor of extg addition. no changes to footprint. | $15,000 |
| Oct 7, 2021 | Completed final sign-off Dec 2021 | 778 30th Av | Pacific Construction Company Inc | repair work at front of building, at lower garage level area, replace and sizering 2x6 stud walls appx 10' liner,replace 2x10x4 long rim joist at overhung,below (e) fl window.. existing. replace side door and repair deck galvanized railing.Details
repair work at front of building, at lower garage level area, replace and sizering 2x6 stud walls appx 10' liner,replace 2x10x4 long rim joist at overhung,below (e) fl window.. existing. replace side door and repair deck galvanized railing. | $60,000 |
| Jun 14, 2021 | Completed final sign-off Jun 2021 | 119 Crescent Av | Pacific Construction Company Inc | revision to bpa#202104088167Details
revision to bpa#202104088167 | |
| Apr 8, 2021 | Never finaled issued May 2021, no final | 119 Crescent Av | Pacific Construction Company Inc | proposal to upgrade 7 post footing and 2 post base shown on s-1 in garage and crawspace.Details
proposal to upgrade 7 post footing and 2 post base shown on s-1 in garage and crawspace. | $10,000 |
| Jan 4, 2018 | Completed final sign-off Nov 2024 | 35 Margaret Av | Pacific Construction Company Inc | replace (e) windows with same size (double panel/anderson eagle e series). framing repairs decay. upgrade window headers. exterior siding replacement front & back only. exterior wall insulation. int/ext. painting,sheetrock replacement at ext. wall. two baths repair. rewire elec. water heater &Details
replace (e) windows with same size (double panel/anderson eagle e series). framing repairs decay. upgrade window headers. exterior siding replacement front & back only. exterior wall insulation. int/ext. painting,sheetrock replacement at ext. wall. two baths repair. rewire elec. water heater & | $180,000 |
| Feb 3, 2017 | Completed final sign-off Oct 2017 | 3070 22nd Av | Pacific Construction Company Inc | exterior wall repair(structural dryrot) and fake deck removalDetails
exterior wall repair(structural dryrot) and fake deck removal | $20,000 |
| May 17, 2016 | Completed final sign-off Oct 2016 | 414 Hearst Av | Pacific Construction Company Inc | replacement of kitchen cabinets and installation of new island with electrical outlets. converting (e) bedroom into new bathroom with new plumbing/electrical, while converting old bathroom into laundry room. (e) laundry rm - becomes pantryDetails
replacement of kitchen cabinets and installation of new island with electrical outlets. converting (e) bedroom into new bathroom with new plumbing/electrical, while converting old bathroom into laundry room. (e) laundry rm - becomes pantry | $70,000 |
| Aug 1, 2013 | Completed final sign-off Apr 2014 | 49 Sunview Dr | C D M J Inc, Pacific Construction Company Inc | ground fl development with new bathroom, family room, guest room, closets, laundry area, new window. interior remodel includes kitchen and bath remodel, new opening between kitchen and living room. replace all windows, wall and floor finishes.Details
ground fl development with new bathroom, family room, guest room, closets, laundry area, new window. interior remodel includes kitchen and bath remodel, new opening between kitchen and living room. replace all windows, wall and floor finishes. | $58,000 |
| Nov 21, 2012 | Never finaled issued Nov 2012, no final | 2860 Harrison St | Pacific Construction Company Inc | separate existing circuitsfrom main subpanel which the 2 unis are sharing and to be individually separte with its own subpanel/100amps; interior painting, door installation, plumbing p trap and kitchen faucet; carpet in bedroom, fence lock installationDetails
separate existing circuitsfrom main subpanel which the 2 unis are sharing and to be individually separte with its own subpanel/100amps; interior painting, door installation, plumbing p trap and kitchen faucet; carpet in bedroom, fence lock installation | $3,800 |
| Jul 11, 2012 | Completed final sign-off Jul 2012 | 2860 Harrison St | Pacific Construction Company Inc | to comply with n.o.v. # 200730023. remove 7'x11' deck.Details
to comply with n.o.v. # 200730023. remove 7'x11' deck. | $750 |