Permit GraphShortlistSan Francisco building permits since 2000

John Sumnicht

License
2848
State contractor license record
Listed as
designer, engineer
Firm
Simpson Gumpertz & Heger
On San Francisco permits
Apr 2012 to Jun 2022

8 permits since 2000 (engineer on 7 permits, designer on 1 permit): 4 completed, 4 never finaled.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records

Most recent permits

FiledOutcomeAddressContractorWork described on the permitDeclared cost
Jun 10, 2022Completed
final sign-off Feb 2024
100 Alpine Tramend pa# 202109218872. replace foundation with mat slab. no other changes proposed.
Details
Permit
202206106061
Status
complete
Filed
Jun 10, 2022
Permit issued
Jul 22, 2022
Final sign-off
Feb 21, 2024
Address
100 Alpine Tr

amend pa# 202109218872. replace foundation with mat slab. no other changes proposed.

Open the permit page

Sep 21, 2021Completed
final sign-off Feb 2024
100 Alpine Tramend scope of bpa# 201508144364. maintain (e) garage, eliminate full basement story below grade, install new slab on grade w/ retaining walls, minor exterior alteration.
Details
Permit
202109218872
Status
complete
Filed
Sep 21, 2021
Permit issued
May 24, 2022
Final sign-off
Feb 23, 2024
Address
100 Alpine Tr

amend scope of bpa# 201508144364. maintain (e) garage, eliminate full basement story below grade, install new slab on grade w/ retaining walls, minor exterior alteration.

Open the permit page

Jun 25, 2015Never finaled
issued Jun 2015, no final
555 California StBcci Construction Company26th floor - revision to appl #2015.0519.6668 for additional structural details. n/a maher ordinance
Details
Permit
201506259980
Status
issued
Filed
Jun 25, 2015
Permit issued
Jun 25, 2015
Declared cost
$565
Address
555 California St

26th floor - revision to appl #2015.0519.6668 for additional structural details. n/a maher ordinance

Open the permit page

$565
May 19, 2015Never finaled
issued May 2015, no final
555 California StBcci Construction Company26th flr: revision to pa 2015 0312 0645 - details for support of nanawall system
Details
Permit
201505196668
Status
issued
Filed
May 19, 2015
Permit issued
May 20, 2015
Address
555 California St

26th flr: revision to pa 2015 0312 0645 - details for support of nanawall system

Open the permit page

Mar 13, 2015Completed
final sign-off Nov 2015
555 California StBcci Construction Companywork associated w/approved permit # 2015 0312 0645. provide new concrete slab over metal deck infill at the 26th flr. tenant & stairs btw 25th & 26th flrs is to be removed & remaining infill opening is to be infilled. maher - not req'd
Details
Permit
201503130794
Status
complete
Filed
Mar 13, 2015
Permit issued
Mar 13, 2015
Final sign-off
Nov 16, 2015
Declared cost
$62,000
Address
555 California St

work associated w/approved permit # 2015 0312 0645. provide new concrete slab over metal deck infill at the 26th flr. tenant & stairs btw 25th & 26th flrs is to be removed & remaining infill opening is to be infilled. maher - not req'd

Open the permit page

$62,000
Aug 6, 2014Never finaled
issued Sep 2014, no final
900 Marin StAshbury Gen Constructing & Engseismic retrofit to strengthen the lateral load resisting system to comply with 2013 sfbc. n/a ordinance #155-13.
Details
Permit
201408063206
Status
issued
Filed
Aug 6, 2014
Permit issued
Sep 12, 2014
Declared cost
$100,000
Address
900 Marin St

seismic retrofit to strengthen the lateral load resisting system to comply with 2013 sfbc. n/a ordinance #155-13.

Open the permit page

$100,000
Aug 29, 2012Never finaled
issued Apr 2013, no final
1426 Fillmore Stexpand existing ground floor storefront spaces by 'filling in' exterior ground floor arcade under existing 2nd floor, area of expansion equals approx 1764 s.f. separate sprinker, hvac, application/permit if required.
Details
Permit
201208298523
Status
issued
Filed
Aug 29, 2012
Permit issued
Apr 29, 2013
Declared cost
$130,000
Address
1426 Fillmore St

expand existing ground floor storefront spaces by 'filling in' exterior ground floor arcade under existing 2nd floor, area of expansion equals approx 1764 s.f. separate sprinker, hvac, application/permit if required.

Open the permit page

$130,000
Apr 24, 2012Completed
final sign-off Mar 2015
180 Sutter StDonald S. Maclean, Incdemolish exist sidewalk , water proof membrane & partial structural frame, install new steel structure metal deck, concrete waterproof membrane topping, slab, curb & gutter, restore finishes, mep in basement.
Details
Permit
201204248937
Status
complete
Filed
Apr 24, 2012
Permit issued
Oct 16, 2012
Final sign-off
Mar 5, 2015
Declared cost
$317,000
Address
180 Sutter St

demolish exist sidewalk , water proof membrane & partial structural frame, install new steel structure metal deck, concrete waterproof membrane topping, slab, curb & gutter, restore finishes, mep in basement.

Open the permit page